PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: AWS310740 County: Duplin
Facility Name: 20293
Certified Operator Name: Stephen Wadsworth Operator Number:
989946
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: A B C
Spillway(Y o� N): N N N
Level(inches): 24.5 16 35
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X . Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon,
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: As Conditions Permit
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Murphy -Brown, LLC Phone: (910) 293-3434
Facility Owner/Manager (print)
U Date: 9/24/2018
Facility Owner/M ger ( ig ature)
If. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: A
line m =
-122 lb PAN
2.
Structure ID: B
line m =
884.7 lb PAN
3.
Structure ID: C
line m =
-369 lb PAN
4.
Structure ID:
line m =
Ib PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n.lines 1+2+3+4+5+g= 393.6lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNnT RF Appi 1Fn III IRINrZ Ture'An nev DFpinn
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t TOTAL PAN
BALANCE FOR
FIELb (lbs.)
column r x s
u. application window
1A
Bermuda
5.16
148.95
768.6
March -Sept
113
Bermuda
5.87
148.95
874.3
March -Sept
1C
Bermuda
5.85
148.95
871.4
March -Sept
State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 2514.3 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
.w. Total PAN to be land applied (line n from section II) = 393.6 lb. PAN
PoA (30 Day) 2/21 /00
x. Crop's remaining PAN balance (line v from section III) = 2514.3 lb. PAN
y. Overall PAN balance (w - x) = -2121 Ib. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to.be hauled to
another permitted facility, provide information regarding the.herd population and lagoon freeboard levels at the
receiving facility.
Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is
available for pumping if needed.
PoA (30 Day) 2/21 /00
d
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): q
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
24.5 inches
b. designed 25 yr./24 hr. storm & structural freeboard
20.2 inches
C. line b - line a (inches in red zone) =
-4 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation)
009156 ftz
e. line c/12 x line d x 7.48 gallons/ft3
-295296 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
180 days
9. volume of waste produced according to structural design
126267 ft3
h. current herd # F--38-3--ol certified herd #1 3830
actual waste produced = current herd # x line g =
126267 W
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 8/2/2018
M. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21 /00
Uft3
63674 ft3
236793 gallons
2.08 Ibs/1000 gal.
-122 lbs. PAN
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 113
2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
16.0 inches
20.6 inches
4.6 inches
I -
125366 ft2
362592 , gal Ions
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design Oft3
h current herd # 6480 certified herd # 6480
actual waste produced = current herd # x line g = ft3
certified herd #
I. volume of wash water according to structural design ft3
j. excess rainfall over evaporation according to design fe
k' (lines h + i + j) x 7.48 x 30 days/line f= gallons
4. Total PAN to be land applied during draw down period
J I. current waste analysis dated 8/2/2018 2.44 Ibs/1000 gal.
m. ((lines e + k)/1000) x line 1 = 884.7 Ibs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21 /00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/identifier (ID): C
2. Current liquid volume in 25 yr./24 hr, storm storage & structural freeboard
a. current liquid level according to marker 35.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard [------2-0-.-21 inches
c. line b - line a (inches in red zone) _ -15 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 83618 ftz
e. line c/12 x line d x 7.48 gallons/W-773489 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 213632 ft3
h. current herd # 6480 certified herd # 6480
actual waste produced = current herd # x line g = 213632 ft°
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 8/2/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21 /00
I �l ft3
1219 77 ft3
418305 gallons
1.04 Ibs/1000 gal.
-369 Ibs. PAN