Loading...
HomeMy WebLinkAbout310740_Plan of Action_2018092431- 7q-o PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: AWS310740 County: Duplin Facility Name: 20293 Certified Operator Name: Stephen Wadsworth Operator Number: 989946 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: A B C Spillway(Y o� N): N N N Level(inches): 24.5 16 35 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X . Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon, freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: As Conditions Permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Murphy -Brown, LLC Phone: (910) 293-3434 Facility Owner/Manager (print) U Date: 9/24/2018 Facility Owner/M ger ( ig ature) If. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: A line m = -122 lb PAN 2. Structure ID: B line m = 884.7 lb PAN 3. Structure ID: C line m = -369 lb PAN 4. Structure ID: line m = Ib PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+g= 393.6lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNnT RF Appi 1Fn III IRINrZ Ture'An nev DFpinn o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t TOTAL PAN BALANCE FOR FIELb (lbs.) column r x s u. application window 1A Bermuda 5.16 148.95 768.6 March -Sept 113 Bermuda 5.87 148.95 874.3 March -Sept 1C Bermuda 5.85 148.95 871.4 March -Sept State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 2514.3 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE .w. Total PAN to be land applied (line n from section II) = 393.6 lb. PAN PoA (30 Day) 2/21 /00 x. Crop's remaining PAN balance (line v from section III) = 2514.3 lb. PAN y. Overall PAN balance (w - x) = -2121 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to.be hauled to another permitted facility, provide information regarding the.herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. PoA (30 Day) 2/21 /00 d PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): q 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 24.5 inches b. designed 25 yr./24 hr. storm & structural freeboard 20.2 inches C. line b - line a (inches in red zone) = -4 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 009156 ftz e. line c/12 x line d x 7.48 gallons/ft3 -295296 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days 9. volume of waste produced according to structural design 126267 ft3 h. current herd # F--38-3--ol certified herd #1 3830 actual waste produced = current herd # x line g = 126267 W certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/2/2018 M. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 Uft3 63674 ft3 236793 gallons 2.08 Ibs/1000 gal. -122 lbs. PAN PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 113 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 16.0 inches 20.6 inches 4.6 inches I - 125366 ft2 362592 , gal Ions f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design Oft3 h current herd # 6480 certified herd # 6480 actual waste produced = current herd # x line g = ft3 certified herd # I. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design fe k' (lines h + i + j) x 7.48 x 30 days/line f= gallons 4. Total PAN to be land applied during draw down period J I. current waste analysis dated 8/2/2018 2.44 Ibs/1000 gal. m. ((lines e + k)/1000) x line 1 = 884.7 Ibs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): C 2. Current liquid volume in 25 yr./24 hr, storm storage & structural freeboard a. current liquid level according to marker 35.0 inches b. designed 25 yr./24 hr. storm & structural freeboard [------2-0-.-21 inches c. line b - line a (inches in red zone) _ -15 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 83618 ftz e. line c/12 x line d x 7.48 gallons/W-773489 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 213632 ft3 h. current herd # 6480 certified herd # 6480 actual waste produced = current herd # x line g = 213632 ft° certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/2/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 I �l ft3 1219 77 ft3 418305 gallons 1.04 Ibs/1000 gal. -369 Ibs. PAN