Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
310005_Plan of Action_20180924
),01862--36-0 31- .s PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: AWS310005 Facility Name: Scott Farm Sites 1-4 Certified, Operator Name: Baltazar Perez County: Duplin Operator Number: 1002653 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon.3 Lagoon 4 Lagoon 5 3137 3138 3139 N N N 13 39 25. 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated_ "Attach a complete schedule with corresponding animal units and dates fro depopulation 'if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the' information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Murphy Brown, LLC Phone: 910-293-3434 ility wn M ger (print) Date. 9/24/2018 Facility Owner/Manager (signature) PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): 3137 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 13.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.9 inches c. line b - line a (inches in red zone) = 6.9 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 140531 ftZ e. line c/12 x line d x 7.48 gallons/ft3 606176 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design C�ft3 h. current herd # 8628 certified herd # 8628 actual waste produced = current herd # x line g = ft3 certified herd # i. volume of wash water according to structural design j, excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/2/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2121 /00 © ft3 I o I ft3 gallons 1.93 Ibs/1000 gal. 1169.9 Ibs. PAN d J A PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD i. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 3138 2. Current liquid volume in 25 yr_/24 hr. storm storage & structural freeboard a. current liquid level according to marker 39.0 inches b. designed 25 yr./24 hr. storm,& structural freeboard. 20.2 inches c_ line b - line a (inches in red zone) _ -19 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 77842 ftZ e. line c/12 x line d x 7.48 gallons/fe-914145 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design F 242307 ft3 h, current herd # 8628 certified herd # 8628 actual waste produced = current herd # x line g = 242307 ft' certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design F, 127384 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 460881 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/2l2018 0. 9]Ibs/1000 gal. m. ((lines e + k)/1000) x line 1 = -313 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 3 339 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 25.0 inches 21.6 inches -3 inches 134896 ftz -285890 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 161397 ft3 h. current herd # 5747 certified herd #1 5747 actual waste produced = current herd # x line g = 161397 ft° certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/2/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 ft3 78689 Jft3 299307 gallons 1.66 Ibs/1000 gal. 22.3 Ibs. PAN l II. TOTAL POUNDS OF PAN' STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 3137 line m = 1169.9 lb PAN 2. Structure ID: 3138 line m = -313 lb PAN 3. Structure ID: 3139 line m = 22.3 lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 879.4 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIFI IDS TO WHICH PAW CeNNnT RF APPI Wn nr rprNn Tuic *in nev D=minn o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (Ib/acre) t TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 1 Wheat 5.03 140.15 704.9 Sept -Apr 2 Wheat 4.37 140.15 612.4 Sept -Apr 3 Wheat 1.57 140.15 220.0 Sept -Apr 4 Wheat 4.78 140.15 669.9 Sept -Apr titate current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 2207.3 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 879.4 lb. PAN PoA (30 Day) 2/21100 x. Crop's remaining PAN balance (line v from section III) = 2207.3 lb. PAN y. Overall PAN balance (w - x) _ -1328 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc, For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. PoA (30 Day) 2/21 /00 MI