PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: AWS310005 County: Duplin
Facility Name:
Scott Farm Sites 1-4
Certified Operator Name:
Baltazar Perez
Operator Number:
1002663
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
Lagoon Lagoon 2 Lagoon,3 Lagoon Lagoon
3137 3138 3139
N N N
13 39 25
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP. ,
Operation will be partially or fully depopulated.
"Attach a complete schedule with corresponding animal units and dates fro depopulation
'if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3_ Earliest possible date to begin land application of waste: as conditions permit
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Murphy Brown, LLC Phone:
ility wn M ger (print)
Date:
Facility Owner/Manager (signature)
910-293-3434
9/24/2018
n
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/identifier (ID): 13137
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
13.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard
19.9 inches
c. line b - line a (inches in red zone) =
6.9 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation)
140531 ftZ
e. line c/12 x line d x 7.48 gallons/ft3
606176 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
180 days
g. volume of waste produced according to structural design
ft3
h. current herd # 8628 certified herd # 8628
actual waste produced = current herd # x line g =
ft3
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 8/2/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21 /00
0 ft3
® ft3
gallons
1.93 Ibs/1000 gal.
1169.9 Ibs. PAN
PLAN OF ACTION (POA),FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 3138
2. Current liquid volume in 25 yr_/24 hr. storm storage & structural freeboard
a. current liquid level according to marker 39.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 20.2 inches
c. line b - line a (inches in red zone) _ -19 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 77842 ft2
e. line c/12 x line d x 7.48 gallons/ft'-914145 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design F 242307 ft3
h, current herd # 1 86281 certified herd # 8628
actual waste produced = current herd # x line g = 242307 ft'
certified herd #
i. volume of wash water according to structural design Oft3
j. excess rainfall over evaporation according to design 127384 ft3
k. (lines h + i + j) x 7.48 x 30 days/line f= 460881 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 8/2/20181 1 0.69 Ibs/1000 gal.
m. ((lines e + k)/1000) x line I = -313 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
W
PoA (30 Day) 2/21 /00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1_ Structure Name/identifier (ID); 3139
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 25.0 inches
b. designed 25 yr_/24 hr. storm & structural freeboard 21.6 inches
c. line b - line a (inches in red zone) = -3 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 134896 ftz
e. line c/12 x line d x 7.48 gallons/ft3-285890 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 161397 ft3
h. current herd # 5747 certified herd # 5747
actual waste produced = current herd # x line g = 161397 ft3
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 8/2/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
Oft3
786891 ft3
299307 gallons
1.66 Ibs/1000 gal.
22.3 Ibs_ PAN
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE
STRUCTURES FOR FACILITY
1.
Structure ID: 3137
line m = 1169.9 lb PAN
2.
Structure ID: 3138
line m = -313 lb PAN
3.
Structure ID: 3139
line m = 22.3 lb PAN
4.
Structure ID:
line m = lb PAN
5.
Structure ID:
line m = lb PAN
6.
Structure ID:
line m = lb PAN
n. lines +2+3+4+5+6= 879.4 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS Tn WNICH PAN CANNnT Rr- APPi wn ni ipiNe'_ Tuic zn nev DCoinn
o. tract #
p. field #
q, crop
r. acres
s. remaining IRR
2 PAN balance
(Ib/acre)
t TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window'
1
Wheat
5.03
140.15
704.9
Sept -Apr
2
Wheat
4.37
140.15
612.4
Sept -Apr
3
Wheat
1.57
140.15
220.0
Sept -Apr
4
Wheat
4.78
140.15
669.9
Sept -Apr
btate current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all -fields (sum of column t) = 2207.3 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 879.4 lb. PAN
PoA (30 Day) 2/21/00
x. Crop's remaining PAN balance (line v from section III) = 2207.3 Ib. PAN
y. Overall PAN balance (w - x) _ -1328 Ib. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is
available for pumping if needed.
PoA (30 Day) 2/21 /00