HomeMy WebLinkAbout310879_Plan of Action_20190925PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 3 7� 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Jaron Kennedy 31-879 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 8.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 11.5 inches d. top of dike surface area according to design 48889 ft2 e. line c/12 x line d x 7.48 gallons/ft' 350453 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 39561 Ift3 h. current herd # 1200 -certified herd # 1200 actual waste produced = current herd # x line g = 39561 ft' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/1/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 1 0 ft3 35750 ft' 93888 gallons 1.08 Ibs/1000 gal. 479.9 Ibs. PAN Structure 1 Jaron Kennedy (PoA30day) 9-16-2018 Page 1 of 1 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Jaron Kennedy (31-879) line m = 479.9 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = n. = 1 +2 +3+4+5+6 479.9 III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window 6194 3 Bermuda Pasture 4.27 109.00 465.4 3/1 - 9/30 6194 4 Bermuda Pasture 4.09 137.00 560.3 3/1 - 9/30 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN, available for all fields (sum of column t) = 1025.8 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 479.9 lb. PAN x. Crop's remaining PAN balance (line v from'section III) = 1025.8 lb. PAN y. Overall PAN balance (w - x) = -546 lb. PAN SUMMARY Jaron Kennedy (PoA30day) 9-16-2018 Page 1 of 2 Line y must show as a deficit. If line y does not showlas a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide. information regarding the herd population and lagoon freeboard levels at the receiving facility: NARRATIVE: I SUMMARY Jaron Kennedy (PoA30day) 9-16-2018 Page 2 of 2