Loading...
HomeMy WebLinkAbout20190869 Ver 1_Prospectus Site Review_20190715Site Information Site Information Date Prepared By:* Meeting Type:* USACE AID: 7/15/2019 Erin Davis Prospectus Site Review NCDWR ID: 20190869 NCDWR Version 1 Weather: Coordinates: Attendees Project Name:* Morton Farms Type of Site: * NCDMS Stream and Wetland Site Sponsor/Prov ide r: * NCDMS Stream and Wetland Site County:* Granville HUC and Basin:* Tar -Pamlico - 03020101 Degrees North Degrees West WRC - Travis Wilson DWR - Mac Haupt, Erin Davis USACE - Todd Tugwell, Kim Browning HDR - Ben, Chris, Michael, Ryan DMS - Lindsay, Jamie, Margie, Debbie Project Review Checklist (provide additional detail in notes section on next page) General Site Issues/Concerns Stream Issues/Concerns Wetland Issues/Concerns 17 Vegetation Composition or Density Ir Planted Stem Vigor (due to soil, browsing) 17 Invasive/Exotic Species Ir Beaver/Feral Hogs (management plan) 17 Soil (manipulation, compaction, fertility) Ir Livestock Present/Evidence of Livestock Access F- Crossings or Utility Lines F- BMPs or Alternate Approaches ,F- Fencing Issues or Fencing Needed Ir Ponds Within Project Area 17 Incised/Entrenched '7 Headcuts Present/Forming 17 Stream Structures Failing/Piping F- Excess Sediment/Aggradation 17 CrosslSections Missing/Indicate Problems Ir Bank Instability/Failure 17 Bench Rills/Erosion (constructed bench or P2 valley) Ir Excess Sinuosity (lack of flow) r Braided/Anabranch Channel IF- Evidence of Excessive Hydrology F- Evidence of Insufficient Hydrology r Hydric Soil Indicators/Soil Series IF- Surface Roughness or Bedding Ir Channel Relocation/Riparian Connectivity 17 Hydroperiod Length or Start/Stop Date 17 Inappropriate Credit Ratio Proposed Ir JD Needed to Confirm Approach 17 Continuity/Fragmentation Ir Easement Issues (existing farm, CE, NRCS funding) 17 Easement Encroachments (livestock, clearing) Ir Easement Marking/Signage 17 Insufficient Project Size Ir Adjacent Property Owner 17 T&E Species Ir Section 106 (historic listing/tribal issues) 17 Insufficient Stream Drainage Area Ir Insufficient Hydrology (if raising channel bed) 17 Vegetation in Channel (stream vs wetland) 17 Flow Obstructions (undersized pipes, fords) 17 Substrate Concerns (embeddedness, particle size) Ir Live Stakes Absent/Failing 17 Evidence of Water Quality Issues Ir Inlstream Habitat Weak/Missing 17 Stream Buffer Width Inadequate Ir Missing Gauge Data (preconstruction or monitoring) 17 Gauge Location/Placement Ir Gauge Maintenance 17 Drainage Ditches/Swales Present Ir Field Tiles/Subsurface Drainage 17 Continued Ag Use Adjacent to Wetland Page 2 -- Notes and Sketches, etc Option 1 selected - no buffer or full tributaries; Landowner wants to keep both crossings as fords (less maintenance than culvert); Easement end not at property line; cattle will have access to stream above easement fence; partially wooded buffer, groundcover cattle impacts; E2 start; R P1 begins at kick -point; some incision; some cattle impacts to banks; bedrock in channel; restoration raising bed, not a lot of offline planned so far (waiting on topo); UT2 ditch - wetland & upland plants, cattle trampling; sediment source will continue, concern over jurisdiction determination, low slope in easement, poor bedform - where's functional uplift of habitat; UTFC active erosion, incision & trampling impacts continue; cobble bottom channel; BMP option on non JD tributaries; buffer discussion - need vs better project/investment; UT3 incised low bedform - needs restoration; below second crossing not as incised, on bedrock, still trampled; water quality very poor - would be good benthic monitoring site; get wells installed to establish baseline functional uplift of hydrology (justify credit ratios); question on credit ratios - E2 would like to have some stream/bank work; Credit Release/Site Closeout Information (For rronitoring or closeout review only) Stream Credits Warm Cool Cold Requested Approved* Wetland Credits Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal Requested Approved* *The updated credit ledger for the project, which includes this release, rrust be approved by the Roject fvbnager. Result of Monitoring Report or Closeout Signature � � Date 7/15/2019