HomeMy WebLinkAbout20190869 Ver 1_Prospectus Site Review_20190715Site Information
Site Information
Date
Prepared By:*
Meeting Type:*
USACE AID:
7/15/2019
Erin Davis
Prospectus Site Review
NCDWR ID: 20190869
NCDWR Version 1
Weather:
Coordinates:
Attendees
Project Name:* Morton Farms
Type of Site: * NCDMS Stream and Wetland Site
Sponsor/Prov ide r: * NCDMS Stream and Wetland Site
County:* Granville
HUC and Basin:* Tar -Pamlico - 03020101
Degrees North Degrees West
WRC - Travis Wilson
DWR - Mac Haupt, Erin Davis
USACE - Todd Tugwell, Kim Browning
HDR - Ben, Chris, Michael, Ryan
DMS - Lindsay, Jamie, Margie, Debbie
Project Review Checklist
(provide additional detail in notes section on next page)
General Site Issues/Concerns
Stream Issues/Concerns
Wetland Issues/Concerns
17 Vegetation Composition or
Density
Ir Planted Stem Vigor (due to soil,
browsing)
17 Invasive/Exotic Species
Ir Beaver/Feral Hogs
(management plan)
17 Soil (manipulation, compaction,
fertility)
Ir Livestock Present/Evidence of
Livestock Access
F- Crossings or Utility Lines
F- BMPs or Alternate Approaches
,F- Fencing Issues or Fencing
Needed
Ir Ponds Within Project Area
17 Incised/Entrenched
'7 Headcuts Present/Forming
17 Stream Structures
Failing/Piping
F- Excess Sediment/Aggradation
17 CrosslSections
Missing/Indicate Problems
Ir Bank Instability/Failure
17 Bench Rills/Erosion
(constructed bench or P2 valley)
Ir Excess Sinuosity (lack of flow)
r Braided/Anabranch Channel
IF- Evidence of Excessive
Hydrology
F- Evidence of Insufficient
Hydrology
r Hydric Soil Indicators/Soil
Series
IF- Surface Roughness or Bedding
Ir Channel Relocation/Riparian
Connectivity
17 Hydroperiod Length or
Start/Stop Date
17 Inappropriate Credit Ratio
Proposed
Ir JD Needed to Confirm
Approach
17 Continuity/Fragmentation
Ir Easement Issues (existing farm,
CE, NRCS funding)
17 Easement Encroachments
(livestock, clearing)
Ir Easement Marking/Signage
17 Insufficient Project Size
Ir Adjacent Property Owner
17 T&E Species
Ir Section 106 (historic
listing/tribal issues)
17 Insufficient Stream Drainage
Area
Ir Insufficient Hydrology (if raising
channel bed)
17 Vegetation in Channel (stream
vs wetland)
17 Flow Obstructions (undersized
pipes, fords)
17 Substrate Concerns
(embeddedness, particle size)
Ir Live Stakes Absent/Failing
17 Evidence of Water Quality
Issues
Ir Inlstream Habitat Weak/Missing
17 Stream Buffer Width Inadequate
Ir Missing Gauge Data
(preconstruction or monitoring)
17 Gauge Location/Placement
Ir Gauge Maintenance
17 Drainage Ditches/Swales
Present
Ir Field Tiles/Subsurface
Drainage
17 Continued Ag Use Adjacent to
Wetland
Page 2 --
Notes and Sketches, etc
Option 1 selected - no buffer or full tributaries;
Landowner wants to keep both crossings as fords (less maintenance than
culvert);
Easement end not at property line; cattle will have access to stream above
easement fence; partially wooded buffer, groundcover cattle impacts; E2
start; R P1 begins at kick -point; some incision; some cattle impacts to
banks; bedrock in channel; restoration raising bed, not a lot of offline
planned so far (waiting on topo); UT2 ditch - wetland & upland plants, cattle
trampling; sediment source will continue, concern over jurisdiction
determination, low slope in easement, poor bedform - where's functional
uplift of habitat; UTFC active erosion, incision & trampling impacts continue;
cobble bottom channel; BMP option on non JD tributaries; buffer discussion
- need vs better project/investment; UT3 incised low bedform - needs
restoration; below second crossing not as incised, on bedrock, still
trampled; water quality very poor - would be good benthic monitoring site;
get wells installed to establish baseline functional uplift of hydrology (justify
credit ratios); question on credit ratios - E2 would like to have some
stream/bank work;
Credit Release/Site Closeout Information
(For rronitoring or closeout review only)
Stream Credits
Warm Cool Cold
Requested
Approved*
Wetland Credits
Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal
Requested
Approved*
*The updated credit ledger for the project, which includes this release, rrust be approved by the Roject fvbnager.
Result of Monitoring Report or Closeout
Signature
�
�
Date 7/15/2019