Loading...
HomeMy WebLinkAboutRE_ _External_ RE_ STIP R-5851 Start of Study Carpenter,Kristi From:Steenhuis, Joanne Sent:Monday, July 15, 2019 1:27 PM To:Shaver, Brad E CIV USARMY CESAW (USA); Luke Heavner Cc:Herndon, T. Mason Subject:RE: \[External\] RE: STIP R-5851 Start of Study Luke, The DWR has already made a stream call for this project and has send Division 3 a stream call letter. If additional information is needed, please let me know and I will be happy to help get the information you need. Joanne Steenhuis -----Original Message----- From: Shaver, Brad E CIV USARMY CESAW (USA) <Brad.E.Shaver@usace.army.mil> Sent: Friday, July 12, 2019 3:24 PM To: Luke Heavner <lheavner@tgsengineers.com> Cc: Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov>; Herndon, T. Mason <tmherndon@ncdot.gov> Subject: \[External\] RE: STIP R-5851 Start of Study CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> Luke, The NCDOT has already received a preliminary jurisdictional determination for this study area on October 29, 2018, SAW-2018-01724. All jurisdictional features are known and at this point until a design is put forward it is impossible to anticipate which permit may be used to authorize the project. Once a design is realized we would be happy to discuss permit requirements. Thanks, Brad Shaver USACE Project Manager -----Original Message----- From: Luke Heavner \[mailto:lheavner@tgsengineers.com\] Sent: Friday, July 12, 2019 1:33 PM To: Shaver, Brad E CIV USARMY CESAW (USA) <Brad.E.Shaver@usace.army.mil> Subject: \[Non-DoD Source\] STIP R-5851 Start of Study Mr. Shaver, Please find attached the Start of Study materials for STIP Project R-5851. 1 Thank you for your time, Luke Heavner Project Planner TGS Engineers 2