HomeMy WebLinkAboutUS 15/401STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Roy COOPER 1AMES H. TROGDON, III GOVERNOR SECRETARY DATE: July 5, 2019 TO: Agency Representatives FROM: Jeffrey A. Stroder, PE, Division Project Engineer, NCDOT- Division 8 SUBJECT: Scoping Input Request STIP Project No. U-5977 — US 15/401 from South Carolina state line to Turnpike Road in Laurinburg (Scotland County); The North Carolina Department of Transportation (NCDOT) has started the project development, environmental and engineering studies for the preparation of environmental studies for State Transportation Improvement Program (STIP) Project Number U-5977. The anticipated level of documentation is currently a Minimum Criteria Determination Checklist. The project proposes to upgrade US 15/401 to provide an alternating passing lane (to complement the existing two- lane roadway) from near the South Carolina state line to Turnpike Road in the City of Laurinburg. The project length is approximately 3.4 miles. This project is anticipated to use state funds. Right-of-way acquisition is scheduled to begin in Fiscal Year (FY) 2024 and construction is scheduled to begin in FY 2026. The purpose of this correspondence is to begin early coordination with our agency partners and to provide an opportunity for you to request continued involvement throughout the life of the project. A summary of existing information is contained within the attached Project Data Sheets, which includes a Study Area Map and USGS Quad Map. Please provide comments on this project and any additional information you have regarding your resource and/or area of expertise as it may relate to the study area. We would especially appreciate any information you might have that would be helpful in identifying and evaluating important issues, topics, and/or resources that should be considered. Thank you for your assistance in the project development process. If you have any questions concerning the project, please contact our consultant with RK&K (Scott Blevins, Manager, Transportation at 919-653-7390, or by email at sblevins@rkk.com) or me at 910-773-8024 or by email atjstroder@ncdot.gov. Please provide comments by July 31, 2019 and include reference to STIP Project No. U-5977 in all correspondence. If we do not receive a response, we will assume that you do not have any comments. Mailing Address: NC DEPARTMENT OF TRANSPORTATION DIVISION 8 121 DOT DRIVE CARTHAGE, NC 29327 Customer Service: 1-877-368-4968 Website: www.ncdot.gov Location: DIVISION 8 121 DOT DRIVE CARTHAGE, NC 28327 L15 401 US 15/401 Corridor Improvements PROJECT DATA SHEET Date: 07/05/2019 STIP No.: U-5977 County: Scotland Federal -aid No.: N/A WBS No.: 45965.1.1 NCDOT Division: 8 Agency Scoping Meeting: N/A Project Description: • Length: Approximately 3.4 miles • Study Limits: Near South Carolina (SC) State Line (Marlboro County) to State Route (SR) 1105 (Turnpike Road) (City of Laurinburg, Scotland County) • STIP Termini (US 15/401): Approximately 3.4 miles from SC State Line to SR 1105 (Turnpike Road) • RPO/COG: Lumber River RPO/Pee Dee River Council of Governments • NEPA / 404 Merger Candidate? ❑ Yes ® No ❑ Unknown • General Description of Project: Improve US 15/401 (McColl Road) to include an alternating passing lane from the SC State Line to SR 1105 (Turnpike Road) Design Data (Existing Conditions): • Functional Classification: o North of SR 438 (Oak Hill Road) to SC State Line —Minor Arterial o SC State Line to bridge crossing of Gum Swamp Creek — Other Freeway o Bridge Crossing of Gum Swamp Creek to north of SR 1105 (Turnpike Road] —Other Principal Arterial hftp://info2.scdot.org/sites/GIS/GiSMapdl/MARLBORO — COUNTY—FC-2010. pdf hftp://ncdot. maps.arcgis.com/home/webmap/viewer.html?layers=029a9a9fe26e43d687d30cd3cO8bl 792 • Strategic Transportation Corridor: N/A hftps://connect. ncdot.gov/projects/planning/pages/NCTransportationNetwork.aspx • National Network for Conventional Combination Trucks (2014): Yes hftps://ops.fhwa.dot.gov/freight/freight_analysis/nat freight stats/index.htm • Map-21 National Highway System Principal Arterial: Yes https://hepgis.fhwa.dot.gov/fhwagis/# • CTP Designations (Facility Type): Scotland County CTP — Boulevard — Needs Improvement hftps://connect. ncdot.gov/projects/planning/-rPBCTP/Scotland%2OCounty/2°/a20Highway%2OMap. pdf • Type of Access Control: No access control U515/401 Corridor Improvements STIP Project U-5977 Scotland County L15J401 • Typical Section: Two lane, undivided • Right -of -Way: Varies • Posted Speed: 55 mph (35 mph in school zones during school hours) • Structure Inventory — US 15/401 Bridge over Gum Swamp: Bridge No. 820017, US 15/401 over Gum Swamp, Year Built: 2015, Sufficiency Rating: 94.3. Condition: Fair. • Other TIP Projects in the Area o EB-5865: Atkinson Street, from US15/401 (South Main Street) to south of East Vance Street in the City of Laurinburg. Sidewalk construction. Construction in FY 2021. o EB-5866: US15/401 Business (South Main Street), from east of Lauchwood Drive to west of Plaza Road in the City of Laurinburg. Sidewalk construction. Construction in FY 2022. o EB-5872: SR 1108 (West Boulevard), from US15/401 (McColl Road) to west of Sunset Drive in the City of Laurinburg. Sidewalk construction. Construction in FY 2020. http://ncdot.maps.arcgis. com/home/webmap/viewer. html?webmap=cb02f4f828974670ad0l bb83be91 b 18c • Railroad Involvement: There are no at -grade rail crossings along US 15/401 in the project area. The nearest lines are located north of the project area within the City of Laurinburg and are operated by Laurinburg & Southern Railroad Company and CSX Transportation. http://ncdot.maps.arcgis. comthome/webmap/viewer. html?webmap=352556db969240c99a06a 17gf56bB403 Transit: There are no existing local bus routes along US 15/401 in the project area. https://www. scotiandcounty.org/DocumentCenterNiew/656rrransporiation-Maps-PDF Transportation Plan History: Regional transportation planning documents were reviewed for identification of previously - identified needs requiring the transportation improvements in the study area as well as previously -proposed widening options. Generally, the planning documents indicate that widening in the study area is needed to accommodate projected traffic volumes. Widening options have previously included widening US 15/401 to a four -lane and five -lane facility in the study area. However, based on current traffic forecasts (2019), and the revised methods developed and approved for determining transportation demand since these documents were completed, widening to a four -lane or five -lane facility is no longer necessary to accommodate projected demand. The NCDOT now proposes to minimize impacts to social, economic, and environmental resources with the proposed design (alternating passing lane from the SC State Line to SR 1105) while accommodating future demand (2040). The reviewed transportation plans, and recommended improvements in each, are summarized below. In 1999 the NCDOT Statewide Planning Branch, in cooperation with the City of Laurinburg, prepared the Thoroughfare Plan Study Report for the City of Laurinburg and Town of East Laurinburg (Thoroughfare Plan). The plan identifies existing and future deficiencies in the local transportation system and examines the need for improvements and/or new facilities. The US 151401 Corridor Improvements STIP Project U-S977 Scotland County L15 401 recommended improvements were based on "anticipated growth and development of the planning area reflecting current zonal trends as provided by the City of Laurinburg." One of the recommended projects included improvements to US 15/401 in the same location as proposed with STIP Project U-5977 (SC State Line to Turnpike Road). The plan indicated that the existing roadway cross-section was not adequate to accommodate projected traffic volumes which included through trip traffic (15% of the total traffic) and external -internal trips for commuters between North Carolina and South Carolina. The plan recommended that the roadway be widened to a multi -lane facility, including a five -lane shoulder section, from the SC State Line to Turnpike Road. Anticipated benefits from the transportation improvements included improved safety, bolstered economic development, and improved system linkage. http://digital. ncdcr.gov/cdm/ref/collecfion/p249901 col]22rid/281117 The 2016 Scotland County Comprehensive Transportation Plan (CTP) includes recommendations for transportation improvements within Scotland County. Recommended improvements contained in the CTP represent an agreement between NCDOT and Scotland County of identified transportation deficiencies and potential solutions to address the deficiencies. The CTP includes capacity improvements by upgrading US 15/401 to a four lane divided boulevard from the SC State Line to US 15/401 Business (Main Street) as one of the recommended major improvements (Local ID: SCOT0001-H). According to the CTP, "US 15/401 is a major north -south corridor connecting Laurinburg to South Carolina and the Aberdeen, Pinehurst and Southern Pines area to the north. US 15/401 (McColl Road) in Laurinburg is currently near capacity and is projected to be over capacity by 2040 from Tartan Road (SR 1628) to Turnpike Road (SR 1271). US 15/401 (McColl Road) is also projected to be near capacity by 2040 from Hasty Road (SR 1615) to US 74. Improvements are needed to accommodate projected traffic volumes such that a minimum Level of Service (LOS) D can be achieved." The proposed project (SCOT0001-H) was to widen the existing US 15/401 facility to a four -lane divided boulevard from the SC State Line to US 15/401 Business. Sidewalks and multi -use path accommodations were recommended on segments of the project. The proposed project would connect to the existing four lane divided facility at US 74. https:/Iconnect.ncdot.gov/projects/plann ing/-rPBCTP/Scotland%20County/Scotland %20Cou ny%20CTP%20Report. p df The US 401 from North/South Carolina State Line to US 401 Business East of Raeford, Scotland and Hoke Counties Feasibility Study (Feasibility Study), produced by NCDOT, Division 8 in February 2018, evaluates potential widening scenarios within six sections of the 31.7-mile long project corridor including those improvements proposed with STIP Project U-5977. The U-5977 improvements evaluated include a best -fit widening option along the existing alignment as currently proposed with the U-5977 study. The Feasibility Study anticipates that the best -fit alignment would minimize impacts to structures, utilities, and environmental resources and would be consistent with Scotland County's CTP which recommends improvements along the entire US 401 corridor in the County. By constructing the improvements, NCDOT anticipates that all roadway segments, including US 15/401 in the U-5977 study area would operate at an acceptable LOS. https://connect. ncdot.gov/projects/plan n ing/Feasibi lityStudiesDocuments/FS-1508B_Feasibility- Study_Report_2018. pdf Traffic Data (AADT): The traffic forecast for the project was approved on April 16, 2019. US 15/401 Corridor Improvements STIP Project U-5977 Scotland County L15 401 US 151401 Section Current Year (2018) VPD Future Year (2040) VPD North of SR 1105 (Turnpike Rd) 14,000 18,200 South of SR 1105 (Turnpike Rd) 12,200 15,800 South of SR 1177 (Purcell Rd) 12,000 15,400 North of SR 1627 (Shaw Rd) 10,200 13,000 South of SR 1627 (Shaw Rd) 10,000 12,800 South of SR 1101 (Academy Rd) 8,400 10,800 South of SR 1628 (Tartan Rd) 7,000 9,000 South of SR 1100 (Leisure Rd) 7,600 9,800 South of SR 1614 (Barnes Bridge Rd) 8,400 10,800 Source: Project Level Traffic Forecast, STIP Project No. U-5977 (RK&K). STIP Cost Estimate: Construction Right -of -Way Utilities Total $27,009,000 $10,598,000 $1,272,000 42,767,000 Source: NCDOT 2018-2027 STIP hftps://connect.ncdot.gov/projects/planning/STI PDocuments 1 /NCDOT%2OCurrent%20STI P.pdf *Project Schedule: Minimum Criteria Determination Checklist: December 2019 Right -of -Way: FY 2024 Construction: FY 2026 Draft Purpose and Need (Feasibility Study): "The purpose of the project is to enhance regional mobility and accommodate regional traffic growth."' The following is provided in the 2018 Feasibility Study: US 401, just north of the U-5977 study area is "designated as a National Highway System (NHS) Strategic Highway Network (STRAHNET) Route. The Department of Defense deems STRAHNET Routes necessary for mobilization and movement of resources and commodities .... within Scotland County and Hoke Counties, US 401 connects the cities of Laurinburg and Raeford, which contain the majority of residential and commercial development in each respective county. In terms of regional connectivity, US 401 provides access to US 74 in Laurinburg and 1-95 in Fayetteville." 'The current proposed design (alternating passing lane from the SC State Line to SR 1105) supports this purpose in the study area by improving traffic operations and reducing traffic delays while providing a wider shoulder and accommodating projected traffic demand. Design Data (Proposed Conditions): • CTP Designation (Facility Type): Boulevard • Type of Access Control: No control of access • Typical Section: 2-lane, with alternating passing lane • Right of Way: Variable • Posted Speed: 55 mph with reduction in school zone during school hours to 35 mph US 151401 Corridor Improvements 5TIP Project U-5977 Scotland County L15J401 Previous Alternatives: As discussed previously, widening options have previously included widening US 15/401 to a four -lane and five -lane facility in the study area. These options are summarized below. However, as mentioned, NCDOT proposes to minimize impacts to social, economic, and environmental resources with the proposed design (alternating passing lane from the SC State Line to SR 1105) while accommodating future demand (2040). The 2018 Feasibility Study proposed a best -fit option, within the existing alignment, for added capacity along US 15/401 in the U-5977 Study Area. This option is consistent with improvements being considered with STIP Project U-5977. The 2016 CTP proposed upgrading US 15/401 to a four lane divided boulevard from the SC State Line to US 15/401 Business (Main Street) as one of the recommended major improvements. The 1999 Thoroughfare Plan recommended that US 15/401 be widened to a multi -lane facility, including a five -lane shoulder section, in the U-5977 Study Area. 5 US 151401 Corridor Improvements STIP Project U-5977 Scotland County Preliminary Study Area Resources Inventory Table General Project Information Length of project — Approximately 3.4 miles Existing Intersections — US 15/401 (McColl Road)/SR 1614 (Barnes Bridge Road) — US 15/401 (McColl Road)/Leisure Road — US 15/401 (McColl Road)/SR 1628 (Tartan Road) — US 15/401 (McColl Road)/SR 1101 (Academy Road) — US 15/401 (McColl Road)/Shaw Road — US 15/401 (McColl Road)/Revel Street — US 15/401 (McColl Road)/Holly Lane — US 15/401 (McColl Road)/Pineview Drive — US 15/401 (McColl Road)/Purcell Road — US 15/401 (McColl Road)/Aurora Street — US 15/401 (McColl Road)/SR 1105 (Turnpike Road) Potential Intersection Locations — No additional intersections proposed. Potential Grade Separations — None existing or proposed. Cultural Resources National Register (NRHP) or eligible sites — No sites currently listed on the NRHP; however, NRHP-eligibility (DOE) and districts review has not yet been complete Other historic sites (#) — To be determined; a Phase 1 Intensive Archaeological Survey is to occur Spring 2019; Architectural review screening results completed by NCDOT indicate that the project may be considered in compliance with both GS 121-12(a) and Section 106 for historic architecture and that no survey is required Human Environment Community facilities: Schools/Day Care — Christ the Cornerstone Academy — Scotland Christian Academy Emergency facilities — Laurinburg Fire Station No. 9 Medical facilities — None Other facilities — Chosen House of Deliverance Ministries — Community Baptist Church — Faith Christian Center — Greater Lighthouse Full Gospel Church — New Beginning Christian Center #1 — Stuartsville Church Residential Properties Yes — numerous residences Business Properties Yes — numerous businesses Parks, Open Space, Greenways, Game — To be determined Lands, Land and Water Conservation Fund (LWCF) Properties, etc. Special populations — One block group (CT 101.01 BG2) exceeds the NCDOT language assistance threshold Natural Environment Named Streams - Lower Gum Swamp Creek Subwatershed (030402040105): Gum Swamp Creek NC 2012 Integrated Report Impaired — None US 151401 Corridor Improvements STIP Project U-5977 Scotland County L15 401 Waters Applicability/Resources NC Draft 2018 Integrated Report Impaired Waters — None NWI Wetlands — N/A; approximately 9.2 acres of wetlands delineated within the U- 5977 Study Area Water Supply Watersheds — None Riparian Buffer rules apply No — Not within a riparian buffer protection basin NCNHP Dedicated Nature Preserve — None NCNHP Registered Heritage Area — None NCNHP Conservation Easement — None NCNHP Natural Area — None Identified Critical habitattspecies under Endangered Species Act (ESA) — To be determined; threatened and endangered species surveys to occur Summer 2019 Physical Environment Suspected / Known Hazardous Material Sites (#) — Yes, one RCRA Small Quantity Generator is located in the study area at 9600 McColl Road Other Infrastructure — Laurinburg Municipal Water Tower — Laurinburg Pump Station 15 Active Agricultural Operations Yes — approximately 0.8 acre of the study area near Leisure Road is actively farmed Voluntary Agricultural Districts (#) — None Wetland Mitigation Sites 0 — NCDEQ Division of Mitigation Services (DMS) Easements 0 — NCDOT Mitigation Sites U.S. Army Corps of Engineers (USACE) Projects (33 U.S.C. 408) — No FEMA Buyout Properties — No Please Note: This table contains draft information based primarily on initial GIS, desktop review. It is intended to be used in conjunction with the Environmental Features Map and USGS Topographic Map: https //connect nedot gov/site/Preconstruction/division/div08/U-5977°/.20US%2015- 401/Proiect%20DevelopmentlU 5977 EFM 11x17.pdf https://connect ncdot.ciov/site/Preconstruction/division/div08fU-5977°/.20US%2015- 401/Project%20DevelopmentIU5977 Fig2 USGS.pdf Sources: Scotland County Parks, Facilities, Cemetery Sites, and Voluntary Agricultural Districts httos://Iaudnbur-g.connectqis.com/Map.aspx FEMA Hazard Mitigation Data — Property Acquisitions https:/twww.fema.gov/media-library/assets/documents/85455 Land and Water Conservation Fund Grants hftp://projects.invw.org/dataAwcf/grants-nc.htmi NCDEQ. 303(d) Listed Waters https://ncden r. maps.arcg is.com/apps/MapSedesrindex. html?appid=14df5075d8e3437b8476c8gc3db3f0a5 https://nodenr.maps.arcgis.com/apps/webappviewer/index.html?id=bi 7139e0934a4cal a2d5a895d21350c4 NCDEQ DMS Easements. hftps://deg.nc.gov/abouttdivisions/mitigation-services/prol)edy NCDEQ Division of Waste Management Site Locator Tool https:Hncden r. maps. arcgis. com/apps/vtebappviewerrndex.html?id=7d d 59be 2750b40be be bfa49fc383f688 NCDWR Water Supply Watersheds https://ncden r. maps.arcg is. com/apps/webappviewer/index.htm I?id=80b5a 3634ed a4l 7880aa6d2a bd dfb6f2 US 151401 Corridor Improvements STIP Project U-5977 Scotland County L15 401 NCDOT Mitigation Site Map. https://www.arcgis.com/home/webmao/viewer.html?webman=d560dfebl ea443b299ca7fc68b2506b4 NCNHP Online Data Search. 2018. www.ncnhp.org. NC State Historic Preservation Office. HPOWEB GIS Service. http://gis.ncdcr.gov/hpoweb/ NOAA National Marine Fisheries Service (NMFS) Critical Habitat. https://sero. nmfs. noaa. gov/maps_gis_data/protected_resources/critir,al_habftatrindex. html USDA - Farm Service Agency. Conservation Reserve Enhancement Program. https:/Avww.fsa.usda.gov/programs-and- services/conservation-programs/conservation-rese rve-enhancement! ndex USEPA My Environment hftps:/Iwww3.epa.gov/myem/envmap/find.html USFWS. Critical Habitat. https://fws. maps.arcgis. com/hometwebmap/viewer. html?webmap=9d8de5e265ad4fe09893cf75b8dbfb77 U515/401 Corridor Improvements STIP Project U-5977 Scotland County N z �_,_ I ® Study Area 0 1 STATE OF NORTH CAROLINA —1 Mile _ _ DEPARTMENT OF TRANSPORTATION DIVISION 8 STIP PROJECT: U-5977 IMPROVEMENTS US 15 / 401 FROM SOUTH CAROLINA J STATE LINE TO SR 1105 (TURNPIKE ROAD) S Scotland county COTLAND COUNTY USGS TOPOGRAPHIC MAP FIGURE 2 Source_ USGS 7.S Minute Guadranoles. McColl and Johns- NC 1 � � •�� i � rLR `;._ ;'j �. Y � '�.. y. vim., M1 ` TURNPI IL Y, a` n y 1' �� as � p•� � _ / *E `. "� ACADEMY Y. y- ��y( y y v k };q TARTAN ti CARLSON � t LEISURE .Y..•,,� +. �. . LEISURE ' V; �". t �. •%_ m "slow ��f�L!•\\� • • - • - s �a Jr ��11�i����ri�" I� +Ir • OFTRANSPORTATIO