Loading...
HomeMy WebLinkAboutSW5190701_Form_(Supp.EZ)_20190715SUPPLEMENT-EZ COVER PAGE n ,iS LOAD` L PROJECT INFORMATION 1 i Project Name 5 'Is this project High or Low Density? 6 Does this project use an off -site SCM? COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided (feet) 8 J Will the ve etated setback remain vegetated? 9 Is BUA other that as listed in .1003(4)(c-d) out of the 10 Is streambank stabilization proposed on this project? Slier No 0 No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 ' Bloretention Cell 0 13 _ Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 1 Dry Pond 0 23 StormFi@er 0 0 0 1 24 Sllva Cell 25 Saylitter 26 I Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: 31 1 Phone 32 Email: Abbott, Principal Engineer ;ign & Engineering, PLLC PO BOX 361 sedmoor, NC 27522 igneng.com Certification Statement: I certify, under penalty of law that this Supplement-FZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. CAR,/// 10 y•�= SEAL ' 036242ba S of Designe �MM Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Filterra 5 Total BUA in project (sq ft) 56123 sf 16242 sf 6 New BUA on subdivided lots (subject to permitting) (sq ft 10878 sf 7 New BUA outside of subdivided lots (subject to permitting) (so 8 Offsite - total area (sq ft) 988 sf 988 sf 9 Offsite BUA (sq ft 988 sf 988 sf 10 Breakdown of new BUA outside subdivided lots: Parkin (sq ft Sidewalk (sq ft Roof (sq ft Roadway s ft 988 sf 988 sf Future (sq ft Other, please specify in the comment box below (sq ft 11 New infiltrating permeable pavement on subdivided lots (sq ft sf sf 12 New infiltrating permeable pavement outside of Isubdivided lots (sq ft sf sf 13permitting) Exisitng BUA that will remain (not subject to s ft 12257 sf sf 14 Existing BUA that is already permitted (sq ft 45245 sf sf 15 Existing BUA that will be removed (sq ft sf sf 16 Percent BUA 56% 74% 17 Design storm inches 1 in 18 Design volume of SCM cu ft n/a 19 1 Calculation method for design volume n/a ADDITIONAL INFORMATION 20 Please use this space to provide any additional information about the drainage area(s): The Site is comprised of existing building and parking lot and walks.The existing building will remain, but the parking lot will be demolished, regraded and repaved and the difference of the final total impervious and the existing impervious treated by the Filterra (Primary SCM) FILTERRA BIORETENTION 1 Drainage area number #3 (ST-3 in calcs) 2 Design volume of SCM (cu ft) N/A GENERAL MDC FROM 02H .1050 111F- Is the SCM sized to treat the SW from all surfaces at build -out? Yes. Is the SCM located away from contaminated soils? Yee 3 4 5 What are the side slopes of the SCM (H:V)? n/a 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? Ale 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yee 9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice 10 If applicable, will the SCM be cleaned out after construction? Ale 11 Does the maintenance access comply with General MDC (8)? Y-es. 12 Does the drainage easement comply with General MDC (9)? Yee 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? 14 Is there an O&M Agreement that complies with General MDC (11)? Yee 15 Is there an O&M Plan that complies with General MDC (12)? Yes. 16 Does the SCM follow the device specific MDC? Yee 17 Was the SCM designed by an NC licensed professional? Yee FILTERRA BIORETENTION MDC FROM THE STORMWATER DESIGN MANUAL 18 Type of pretreatment that will be used N/A 19 Depth of storage above the filter media surface (in) Surface area of the Filterra Bioretention system (sq ft) per Filterra 20 91 sf 21 Method of flow distribution over the media sheet 22 Infiltration rate of engineered media (inch/hour) 140 in/hr 23 Diameter of the underdrain pipes (if applicable) 6 in 24 Does the design include Internal Water Storage (IWS)? if so, elevation of the top of the IWS (fmsl) Ale 25 26 Elevation of the planting surface (fmsl) Throat at 107.57 27 Species of tree(s) that will be planted per Filterra 28 Media depth (inches) 21 in 29 Number of clean out pipes 2 30 Will maintenance be performed per the Filterra O & M Manual? Yee ADDITIONAL INFORMATION _ Please use this space to provide any additional 31 information about the Filterra Unit(s):