Loading...
HomeMy WebLinkAboutSW5190701_Report_(SW)_20190715CSIOESIIGN & ENGINEERING, RLLC CLIENT -FOCUSED • COMPREHENSIVE • COST-EFFECTIVE 2537E. LYON STAT/ON RD, STE 102 PO BOX 361 SILER SQUARE SIA CREEDMOOR, NC 27522 919-625-7368 502 West Third Street, Siler City NC 27344 ENGINEER of RECORD: Chad E. Abbott, PE chad@c3designeng.com / 919-625-7368 MAY 20, 2019 (Original Submittal) JUNE 17, 2019 (2ND SUBMITTAL) CaIOEESIGN & ENGINEERING, PLLC CLIENT -FOCUSED • COMPREHENSIVE • COST-EFFECTIVE 2537E. LYON STAT/ON RD, STE 102 PO BOX 361 SIA NARRATIVE CREEDMOOR, NC 27522 919-625-7368 2537 E. L YON STATION RD, STE 102 CaOEESIGN & PO BOX 361 ENGINEERING, PLLC CREEDMOOR, NC27522 CLIENT -FOCUSED • COMPREHENSIVE • COST-EFFECTIVE 919-625-7368 SILER SQUARE APARTMENTS — STORMWATER NARRATIVE MAY 20, 2019 PROJECT DATA: • NAME: SILER SQUARE APARTMENTS • PIN: 0062694 • PROPERTY SIZE: 101,017 SF (2.32 AC) • ADDRESS: 502 W THIRD STREET, SILER CITY NC. 27344 • ZONING: R-3 (CUP 01-18) • STORMWATER REG BASIN: PHASE II COMMUNITY • RIVER BASIN: CAPE FEAR • EXISTING BUA: 45,245 SF (44.79%) • PROPOSED BUA: 10,878 SF • TOTAL BUA: 56,123 SF (55.56% --- 24.10% INCREASE) • DISTURBED AREA: 92,000 SF (2.11 AC) • WATERSHED PROT. OVERLAY: N/A SITE HISTORY & EXISTING HYDROLOGIC CONDITIONS: The existing property is an historic school site that consisted of a single building fronting on West Third Street and parking areas to the side and rear along North Evergreen Ave. and West Fourth Street. The site generally drains southward towards the intersection of North Fir Ave. and West Third Street and is channelized along the existing Curb & Gutter (West Third) and shallow road side swales/ditches for the other streets around the property. Slopes are moderate (3-6%) with steeper slopes (2:1 and 3:1) along the West Third Street and North Fir Avenue frontages. There is no storm sewer system available to the site and all flows discharge into the adjacent right of ways where they continue southward along West Third until being captured by a curb inlet. The existing site is either paved or grassed with a few trees around the perimeter, but no wooded sections. PROJECT DESCRIPTION: The 2.32 acre subject property part of a Conditional Use Permit that was approved for apartments by the Town of Siler City Council. The existing building will be retrofit and rehabilitated to allow multifamily living as well as house the community center amenities, etc. There will be 2 new buildings placed on the southwest side along North Fir Ave., Building 1 being +/-4,398 sf and Building 2 being +/-8,778 sf. The existing parking area and a portion of the existing building will be removed and replaces with new parking, landscaping and sidewalks. Two (2) amenity areas will be provided, one within the courtyard area created by the existing building configuration and the otherjust off the proposed parking area, in the front yard near Building #2. LAND DISTURBANCE AND IMPERVIOUS SURFACES: As noted, approximately 2.11 acres of the 2.32 subject property and corresponding road frontage will be disturbed for the proposed 2537 E. L YON STATION RD, STE 102 CaOEESIGN cSL PO BOX 361 ENGINEERING, PLLC CREEDMOOR, NC27522 CLIENT -FOCUSED • COMPREHENSIVE • COST-EFFECTIVE 919-625-7368 improvements. The site was already high density based on the exiting impervious coverage. As noted above, there is a +/-10,878 sf increase in total impervious surfaces. These areas are required to be treated per the Phase II Community requirements as well a the 10 yr— 24 hours storm event detained to pre —developed rates to meet the Town of Siler City's Stormwater Ordinance. The land disturbance will be permitted accordingly through the Raleigh Regional office and proposed a skimmer basin in/near the area of the amenity area during construction. It will subsequently be filled in and the area transformed into the proposed picnic shelter, etc. WATERSHED PROTECTION OVERLAYS: The site is not part of any specific watershed protection overlay. It is currently only +/-8.89% impervious and could be classified as low density in regards to meeting the Phase II Rules for 85% TSS removal and controlling and treating the 1st 1/2 inch of rainfall. We are in the Cape Fear River Basin, which doesn't have adopted nutrient goals for Nitrogen or Phosphorus, however each of these nutrients will be removed via the proposed Filterra. STREAMS & FLOODPLAINS: There are no streams or floodplains located on -site. APPLICABLE REQUIREMENTS: PEAK FLOW: The Town of Siler City requires that all post development flows match pre - development flows. As noted, the site is already urban and would exhibit a min. 5 min. Time of concentration. If the additional BUA/impervious area is captured, detained, and released to the equivalent areas Pre -Development Rates, the Towns ordinance will be met. We have an increase of +/-10,878 increase in BUA where the land cover is changing from pervious/grass to impervious. Therefore, we are proposing to capture each building, with its own Underground Storage (UGS) System that will have a structure at the end of the line with a weir wall and orifice(s) to attenuate the flows accordingly. In doing so, we are taking approximately 13,176 sf of impervious land cover and retaining it to the pre -development rates as that 13,176 sf as grassed. All other portions of the site are captured and released since the impervious areas remaining are at or below the existing conditions. • WATER QUALITY: As noted above, the project is considered to be high density due to having more than 24% increase and therefore must meet the goals and objectives of the Phase II Community Regulations. Those regulations require sites to capture and treat the first 1" of runoff with a "PRIMARY" Stormwater Control Measure (SCM). We have chosen to treat the parking area with a Filterra and again are treating more than the actual increase in BUA since it is difficult to break the site up into just the area of increase. The filterra will capture all runoff that flows to ST-3 where any flows in excess of the first 1" will overflow down to ST-3. 2537 E. L YON STATION RD, STE 102 CaOEESIGN cSL PO BOX 361 ENGINEERING, PLLC CREEDMOOR, NC27522 CLIENT -FOCUSED • COMPREHENSIVE • COST-EFFECTIVE 919-625-7368 METHODOLOGIES: AutoCAD Civil 3D and the existing topographic survey by "LAND SERVICES" was used to delineate and obtain all land cover quantities/areas and flow patterns. Aerials from Google Earth as provided by Autodesk and Chatham County GIS was used to assess land cover types. All of the 'project area' or 'area of interest' was able to be captured at a common point for both pre/post development where all flows would converge at a discharge point at/near the existing collection point at the intersection of West Third Street and North Fir Ave. All pre/post runoff and hydrographs were calculated using Hydraflow Hydrographs for AutoCAD Civil 3D. The SCS hydrographs were used along with the generating the Time of Concentrations assumed at 5 min. for both scenarios. All rainfall intensities and precipitation amounts were loaded into Hydraflow from NOAA data as site specific values that NOAA interpolated from various surrounding weather stations and is included with the stormwater calculations. CONCLUSIONS: As mentioned previously, the Hydraflow analysis for the 10yr-24hr event reveals that the areas of increased BUA have been attenuated appropriately as well as additional storm events. The filterra information is included to show that a 13'x7' Filterra unit is sufficient to treat the 16,242 sf of impervious area draining to it. CaIOEESIGN & ENGINEERING, PLLC CLIENT -FOCUSED • COMPREHENSIVE • COST-EFFECTIVE 2537E. LYON STAT/ON RD, STE 102 PO BOX 361 HYDRAFLOW CREEDMOOR, NC 27522 919-625-7368 HYDROGRAPHS PEAK FLOW ANALYSIS 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk@ Civil 3D& 2019 by Autodesk, Inc. v202O PRE-DEV BLDG A -COST-DEV BLDG A PRE-DEV BLDG BPOST-DEV BLDG B r r 5 - BLDG A - UGS ROUTE 6 - BLDG B - UGS ROUTE Legend Hid. Origin Description 1 SCS Runoff PRE-DEV BLDG A 2 SCS Runoff POST-DEV BLDG A 3 SCS Runoff PRE-DEV BLDG B 4 SCS Runoff POST-DEV BLDG B 5 Reservoir BLDG A- UGS ROUTE 6 Reservoir BLDG B - UGS ROUTE Project: 2019-05-20 SILER PRE -POST - INCREASE ONLY.gpw Tuesday, 05 / 21 / 2019 Hydrograph Return Period Recap Hydra w Hydrographs Extension for Autodesk@ Civil 3D@ 2019 by Autodesk, Inc. v2020 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 0.125 0.197 ------- 0.313 0.412 ------- ------- ------- PRE-DEV BLDG A 2 SCS Runoff ------ 0.438 0.531 ------- 0.666 0.773 ------- ------- ------- POST-DEV BLDG A 3 SCS Runoff ------ 0.238 0.375 ------- 0.594 0.782 ------- ------- ------- PRE-DEV BLDG B 4 SCS Runoff ------ 0.833 1.009 ------- 1.265 1.470 ------- ------- ------- POST-DEV BLDG B 5 Reservoir 2 0.122 0.142 ------- 0.293 0.408 ------- ------- ------- BLDG A- UGS ROUTE 6 Reservoir 4 0.231 0.303 ------- 0.592 0.762 ------- ------- ------- BLDG B - UGS ROUTE Proj. file: 2019-05-20 SILER PRE -POST - INCREASE ONLY.gpw Tuesday, 05 / 21 / 2019 Hydrograph Summary Repo rtH ydraflow Hydrographs Extension for Autodesk@ Civil 3D@ 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.125 1 718 265 ------ ------ ------ PRE-DEV BLDG A 2 SCS Runoff 0.438 1 717 1,033 ------ ------ ------ POST-DEV BLDG A 3 SCS Runoff 0.238 1 718 504 ------ ------ ------ PRE-DEV BLDG B 4 SCS Runoff 0.833 1 717 1,962 ------ ------ ------ POST-DEV BLDG B 5 Reservoir 0.122 1 725 1,031 2 104.53 288 BLDG A - UGS ROUTE 6 Reservoir 0.231 1 725 1,960 4 100.15 549 BLDG B - UGS ROUTE 2019-05-20 SILER PRE -POST - INCREASE CHtftbfrgperiod: 1 Year Tuesday, 05 / 21 / 2019 4 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 05 / 21 / 2019 Hyd. No. 1 PRE-DEV BLDG A Hydrograph type = SCS Runoff Peak discharge = 0.125 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 265 cuft Drainage area = 0.100 ac Curve number = 70* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.99 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0.100 x 70)] / 0.100 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 PRE-DEV BLDG A Hyd. No. 1 -- 1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 5 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 05 / 21 / 2019 Hyd. No. 2 POST-DEV BLDG A Hydrograph type = SCS Runoff Peak discharge = 0.438 cfs Storm frequency = 1 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 1,033 cuft Drainage area = 0.100 ac Curve number = 98* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.99 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0.100 x 98)] / 0.100 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 POST-DEV BLDG A Hyd. No. 2 -- 1 Year 0 120 240 360 480 600 720 840 960 Hyd No. 2 Q (cfs) Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 05 / 21 / 2019 Hyd. No. 3 PRE-DEV BLDG B Hydrograph type = SCS Runoff Peak discharge = 0.238 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 504 cuft Drainage area = 0.190 ac Curve number = 70* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.99 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0.190 x 70)] / 0.190 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 PRE-DEV BLDG B Hyd. No. 3 -- 1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 7 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 05 / 21 / 2019 Hyd. No. 4 POST-DEV BLDG B Hydrograph type = SCS Runoff Peak discharge = 0.833 cfs Storm frequency = 1 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 1,962 cuft Drainage area = 0.190 ac Curve number = 98* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.99 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0.195 x 98)] / 0.190 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0 00 POST-DEV BLDG B Hyd. No. 4 -- 1 Year 0 120 240 360 480 600 720 840 960 Hyd No. 4 Q (cfs) Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 05 / 21 / 2019 Hyd. No. 5 BLDG A - UGS ROUTE Hydrograph type = Reservoir Peak discharge = 0.122 cfs Storm frequency = 1 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 1,031 cuft Inflow hyd. No. = 2 - POST-DEV BLDG A Max. Elevation = 104.53 ft Reservoir name = BLDG A UGS Max. Storage = 288 cuft Storage Indication method used. Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 BLDG A - UGS ROUTE Hyd. No. 5 -- 1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 — Hyd No. 2 Total storage used = 288 cult Time (min) Pond Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ 2019 by Autodesk, Inc. v2020 Tuesday, 05 / 21 / 2019 Pond No. 1 - BLDG A UGS Pond Data UG Chambers -Invert elev. = 103.00 A Rise x Span = 3.00 x 3.00 ft, Barrel Len = 80.00 ft, No. Barrels = 1, Slope = 0.01 %, Headers = No Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 103.00 n/a 0 0 0.30 103.30 n/a 29 29 0.60 103.60 n/a 51 80 0.90 103.90 n/a 62 142 1.20 104.20 n/a 69 211 1.50 104.50 n/a 72 283 1.80 104.80 n/a 72 355 2.11 105.11 n/a 69 423 2.41 105.41 n/a 62 486 2.71 105.71 n/a 51 537 3.01 106.01 n/a 29 566 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrFRsr] [A] [B] [C] [D] Rise (in) = 12.00 2.00 6.00 0.00 Crest Len (ft) = 16.00 4.00 0.00 0.00 Span (in) = 12.00 2.00 2.00 0.00 Crest El. (ft) = 108.00 105.80 0.00 0.00 No. Barrels = 1 1 1 0 WeirCoeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 103.00 103.00 104.80 0.00 Weir Type = 1 Rect --- --- Length (ft) = 20.00 0.00 0.00 0.00 Multi -Stage = Yes Yes No No Slope (%) = 5.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes Yes No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation CIvA CIvB CIvC PrfRsr WrA WrB WrC WrD Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 103.00 0.00 0.00 0.00 --- 0.00 0.00 --- --- 0.03 3 103.03 0.00 is 0.00 is 0.00 --- 0.00 0.00 --- --- 0.06 6 103.06 0.01 is 0.01 is 0.00 --- 0.00 0.00 --- --- 0.09 9 103.09 0.01 is 0.01 is 0.00 --- 0.00 0.00 --- --- 0.12 12 103.12 0.02 is 0.02 is 0.00 --- 0.00 0.00 --- --- 0.15 14 103.15 0.03 is 0.03 is 0.00 --- 0.00 0.00 --- --- 0.18 17 103.18 0.03 is 0.03 is 0.00 --- 0.00 0.00 --- --- 0.21 20 103.21 0.04 is 0.04 is 0.00 --- 0.00 0.00 --- --- 0.24 23 103.24 0.04 is 0.04 is 0.00 --- 0.00 0.00 --- --- 0.27 26 103.27 0.04 is 0.04 is 0.00 --- 0.00 0.00 --- --- 0.30 29 103.30 0.05 is 0.05 is 0.00 --- 0.00 0.00 --- --- 0.33 34 103.33 0.05 is 0.05 is 0.00 --- 0.00 0.00 --- --- 0.36 39 103.36 0.05 is 0.05 is 0.00 --- 0.00 0.00 --- --- 0.39 44 103.39 0.06 is 0.06 is 0.00 --- 0.00 0.00 --- --- 0.42 49 103.42 0.06 is 0.06 is 0.00 --- 0.00 0.00 --- --- 0.45 55 103.45 0.06 is 0.06 is 0.00 --- 0.00 0.00 --- --- 0.48 60 103.48 0.07 is 0.06 is 0.00 --- 0.00 0.00 --- --- 0.51 65 103.51 0.07 is 0.07 is 0.00 --- 0.00 0.00 --- --- 0.54 70 103.54 0.07 is 0.07 is 0.00 --- 0.00 0.00 --- --- 0.57 75 103.57 0.07 is 0.07 is 0.00 --- 0.00 0.00 --- --- 0.60 80 103.60 0.07 is 0.07 is 0.00 --- 0.00 0.00 --- --- 0.63 86 103.63 0.08 is 0.07 is 0.00 --- 0.00 0.00 --- --- 0.66 93 103.66 0.08 is 0.08 is 0.00 --- 0.00 0.00 --- --- 0.69 99 103.69 0.08 is 0.08 is 0.00 --- 0.00 0.00 --- --- 0.72 105 103.72 0.08 is 0.08 is 0.00 --- 0.00 0.00 --- --- 0.75 111 103.75 0.08 is 0.08 is 0.00 --- 0.00 0.00 --- --- 0.78 118 103.78 0.08 is 0.08 is 0.00 --- 0.00 0.00 --- --- 0.81 124 103.81 0.09 is 0.09 is 0.00 --- 0.00 0.00 --- --- 0.84 130 103.84 0.09 is 0.09 is 0.00 --- 0.00 0.00 --- --- 0.87 136 103.87 0.09 is 0.09 is 0.00 --- 0.00 0.00 --- --- 0.90 142 103.90 0.09 is 0.09 is 0.00 --- 0.00 0.00 --- --- 0.93 149 103.93 0.10 is 0.09 is 0.00 --- 0.00 0.00 --- --- --- --- 0.000 --- --- 0.001 --- --- 0.006 --- --- 0.012 --- --- 0.019 --- --- 0.027 --- --- 0.033 --- --- 0.036 --- --- 0.040 --- --- 0.044 --- --- 0.047 --- --- 0.050 --- --- 0.053 --- --- 0.056 --- --- 0.058 --- --- 0.061 --- --- 0.063 --- --- 0.066 --- --- 0.068 --- --- 0.070 --- --- 0.072 --- --- 0.074 --- --- 0.077 --- --- 0.079 --- --- 0.080 --- --- 0.082 --- --- 0.084 --- --- 0.086 --- --- 0.088 --- --- 0.090 --- --- 0.092 --- --- 0.093 Continues on next page 10 BLDG A UGS Stage / Storage / Discharge Table Stage Storage Elevation CIvA CIvB CIvC PrfRsr WrA WrB WrC WrD Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.96 156 103.96 0.10 is 0.09 is 0.00 --- 0.00 0.00 --- --- --- --- 0.095 0.99 163 103.99 0.10 is 0.10 is 0.00 --- 0.00 0.00 --- --- --- --- 0.097 1.02 170 104.02 0.10 is 0.10 is 0.00 --- 0.00 0.00 --- --- --- --- 0.098 1.05 177 104.05 0.10 is 0.10 is 0.00 --- 0.00 0.00 --- --- --- --- 0.100 1.08 184 104.08 0.11 is 0.10 is 0.00 --- 0.00 0.00 --- --- --- --- 0.101 1.11 191 104.11 0.11 is 0.10 is 0.00 --- 0.00 0.00 --- --- --- --- 0.103 1.14 197 104.14 0.11 is 0.10 is 0.00 --- 0.00 0.00 --- --- --- --- 0.105 1.17 204 104.17 0.11 is 0.11 is 0.00 --- 0.00 0.00 --- --- --- --- 0.106 1.20 211 104.20 0.11 is 0.11 is 0.00 --- 0.00 0.00 --- --- --- --- 0.107 1.23 218 104.23 0.11 is 0.11 is 0.00 --- 0.00 0.00 --- --- --- --- 0.109 1.26 225 104.26 0.11 is 0.11 is 0.00 --- 0.00 0.00 --- --- --- --- 0.110 1.29 233 104.29 0.11 is 0.11 is 0.00 --- 0.00 0.00 --- --- --- --- 0.112 1.32 240 104.32 0.11 is 0.11 is 0.00 --- 0.00 0.00 --- --- --- --- 0.113 1.35 247 104.35 0.11 is 0.11 is 0.00 --- 0.00 0.00 --- --- --- --- 0.115 1.38 254 104.38 0.12 is 0.12 is 0.00 --- 0.00 0.00 --- --- --- --- 0.116 1.41 261 104.41 0.12 is 0.12 is 0.00 --- 0.00 0.00 --- --- --- --- 0.117 1.44 269 104.44 0.12 is 0.12 is 0.00 --- 0.00 0.00 --- --- --- --- 0.119 1.47 276 104.47 0.12 is 0.12 is 0.00 --- 0.00 0.00 --- --- --- --- 0.120 1.50 283 104.50 0.12 is 0.12 is 0.00 --- 0.00 0.00 --- --- --- --- 0.122 1.53 290 104.53 0.12 is 0.12 is 0.00 --- 0.00 0.00 --- --- --- --- 0.123 1.56 297 104.56 0.13 is 0.12 is 0.00 --- 0.00 0.00 --- --- --- --- 0.124 1.59 304 104.59 0.13 is 0.13 is 0.00 --- 0.00 0.00 --- --- --- --- 0.125 1.62 312 104.62 0.13 is 0.13 is 0.00 --- 0.00 0.00 --- --- --- --- 0.127 1.65 319 104.65 0.13 is 0.13 is 0.00 --- 0.00 0.00 --- --- --- --- 0.128 1.68 326 104.68 0.13 is 0.13 is 0.00 --- 0.00 0.00 --- --- --- --- 0.129 1.71 333 104.71 0.13 is 0.13 is 0.00 --- 0.00 0.00 --- --- --- --- 0.130 1.74 340 104.74 0.13 is 0.13 is 0.00 --- 0.00 0.00 --- --- --- --- 0.132 1.77 347 104.77 0.14 is 0.13 is 0.00 --- 0.00 0.00 --- --- --- --- 0.133 1.80 355 104.80 0.14 is 0.13 is 0.00 is --- 0.00 0.00 --- --- --- --- 0.134 1.83 361 104.83 0.14 is 0.14 is 0.00 is --- 0.00 0.00 --- --- --- --- 0.139 1.86 368 104.86 0.15 is 0.14 is 0.01 is --- 0.00 0.00 --- --- --- --- 0.146 1.90 375 104.90 0.16 is 0.14 is 0.02 is --- 0.00 0.00 --- --- --- --- 0.154 1.93 382 104.93 0.17 is 0.14 is 0.03 is --- 0.00 0.00 --- --- --- --- 0.163 1.96 389 104.96 0.18 is 0.14 is 0.03 is --- 0.00 0.00 --- --- --- --- 0.174 1.99 396 104.99 0.19 is 0.14 is 0.05 is --- 0.00 0.00 --- --- --- --- 0.185 2.02 403 105.02 0.20 is 0.14 is 0.06 is --- 0.00 0.00 --- --- --- --- 0.198 2.05 410 105.05 0.21 is 0.14 is 0.07 is --- 0.00 0.00 --- --- --- --- 0.211 2.08 416 105.08 0.22 is 0.14 is 0.08 is --- 0.00 0.00 --- --- --- --- 0.225 2.11 423 105.11 0.25 is 0.14 is 0.10 is --- 0.00 0.00 --- --- --- --- 0.239 2.14 430 105.14 0.26 is 0.14 is 0.11 is --- 0.00 0.00 --- --- --- --- 0.255 2.17 436 105.17 0.28 is 0.15 is 0.13 is --- 0.00 0.00 --- --- --- --- 0.271 2.20 442 105.20 0.29 is 0.15 is 0.14 is --- 0.00 0.00 --- --- --- --- 0.287 2.23 448 105.23 0.31 is 0.15 is 0.16 is --- 0.00 0.00 --- --- --- --- 0.305 2.26 454 105.26 0.32 is 0.15 is 0.17 is --- 0.00 0.00 --- --- --- --- 0.323 2.29 461 105.29 0.35 is 0.15 is 0.19 is --- 0.00 0.00 --- --- --- --- 0.341 2.32 467 105.32 0.37 is 0.15 is 0.21 is --- 0.00 0.00 --- --- --- --- 0.356 2.35 473 105.35 0.37 is 0.15 is 0.22 is --- 0.00 0.00 --- --- --- --- 0.369 2.38 479 105.38 0.39 is 0.15 is 0.23 is --- 0.00 0.00 --- --- --- --- 0.381 2.41 486 105.41 0.40 is 0.15 is 0.24 is --- 0.00 0.00 --- --- --- --- 0.392 2.44 491 105.44 0.40 is 0.15 is 0.25 is --- 0.00 0.00 --- --- --- --- 0.403 2.47 496 105.47 0.42 is 0.15 is 0.26 is --- 0.00 0.00 --- --- --- --- 0.413 2.50 501 105.50 0.42 is 0.15 is 0.27 is --- 0.00 0.00 --- --- --- --- 0.423 2.53 506 105.53 0.44 is 0.16 is 0.28 is --- 0.00 0.00 --- --- --- --- 0.433 2.56 511 105.56 0.44 is 0.16 is 0.29 is --- 0.00 0.00 --- --- --- --- 0.442 2.59 516 105.59 0.46 is 0.16 is 0.29 is --- 0.00 0.00 --- --- --- --- 0.452 2.62 521 105.62 0.46 is 0.16 is 0.30 is --- 0.00 0.00 --- --- --- --- 0.461 2.65 526 105.65 0.48 is 0.16 is 0.31 is --- 0.00 0.00 --- --- --- --- 0.470 2.68 532 105.68 0.48 is 0.16 is 0.32 is --- 0.00 0.00 --- --- --- --- 0.478 2.71 537 105.71 0.50 is 0.16 is 0.33 is --- 0.00 0.00 --- --- --- --- 0.487 2.74 540 105.74 0.50 is 0.16 is 0.33 is --- 0.00 0.00 --- --- --- --- 0.495 2.77 542 105.77 0.52 is 0.16 is 0.34 is --- 0.00 0.00 --- --- --- --- 0.503 2.80 545 105.80 0.52 is 0.16 is 0.35 is --- 0.00 0.00 --- --- --- --- 0.511 2.83 548 105.83 0.58 is 0.16 is 0.35 is --- 0.00 0.06 --- --- --- --- 0.579 2.86 551 105.86 0.71 is 0.16 is 0.36 is --- 0.00 0.18 --- --- --- --- 0.709 2.89 554 105.89 0.89 is 0.16 is 0.37 is --- 0.00 0.35 --- --- --- --- 0.876 2.92 557 105.92 1.07 is 0.16 is 0.37 is --- 0.00 0.54 --- --- --- --- 1.074 2.95 560 105.95 1.30 is 0.16 is 0.38 is --- 0.00 0.76 --- --- --- --- 1.299 2.98 563 105.98 1.55 is 0.16 is 0.39 is --- 0.00 1.00 --- --- --- --- 1.546 3.01 566 106.01 1.82 is 0.16 is 0.39 is --- 0.00 1.26 --- --- --- --- 1.815 ... End Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 05 / 21 / 2019 Hyd. No. 6 BLDG B - UGS ROUTE Hydrograph type = Reservoir Peak discharge = 0.231 cfs Storm frequency = 1 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 1,960 cuft Inflow hyd. No. = 4 - POST-DEV BLDG B Max. Elevation = 100.15 ft Reservoir name = BLDG BUGS Max. Storage = 549 cuft Storage Indication method used. Q (cfs) 1.00 0.90 WE 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0 BLDG B - UGS ROUTE Hyd. No. 6 -- 1 Year Q (cfs) 1.00 0.90 N :M 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 — Hyd No. 4 Total storage used = 549 cult Time (min) Pond Report 12 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ 2019 by Autodesk, Inc. v2020 Tuesday, 05 / 21 / 2019 Pond No. 2 - BLDG B UGS Pond Data UG Chambers -Invert elev. = 98.00 ft, Rise x Span = 4.00 x 4.00 ft, Barrel Len = 80.00 ft, No. Barrels = 1, Slope = 0.01 %, Headers = No Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 98.00 n/a 0 0 0.40 98.40 n/a 52 52 0.80 98.80 n/a 91 143 1.20 99.20 n/a 111 253 1.60 99.60 n/a 122 376 2.00 100.00 n/a 127 503 2.40 100.40 n/a 128 630 2.81 100.81 n/a 122 752 3.21 101.21 n/a 111 863 3.61 101.61 n/a 91 954 4.01 102.01 n/a 52 1,006 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrFRsr] [A] [B] [C] [D] Rise (in) = 12.00 2.50 8.00 0.00 Crest Len (ft) = 20.00 5.00 0.00 0.00 Span (in) = 12.00 2.00 2.00 0.00 Crest El. (ft) = 102.50 101.80 0.00 0.00 No. Barrels = 1 1 1 0 WeirCoeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 98.00 98.00 100.40 0.00 Weir Type = 1 Rect --- --- Length (ft) = 20.00 0.00 0.00 0.00 Multi -Stage = Yes Yes No No Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a Yes Yes No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation CIvA CIvB CIvC PrfRsr WrA WrB WrC WrD Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 98.00 0.00 0.00 0.00 --- 0.00 0.00 --- --- 0.04 5 98.04 0.00 is 0.00 is 0.00 --- 0.00 0.00 --- --- 0.08 10 98.08 0.01 is 0.01 is 0.00 --- 0.00 0.00 --- --- 0.12 16 98.12 0.02 is 0.02 is 0.00 --- 0.00 0.00 --- --- 0.16 21 98.16 0.04 is 0.03 is 0.00 --- 0.00 0.00 --- --- 0.20 26 98.20 0.05 is 0.05 is 0.00 --- 0.00 0.00 --- --- 0.24 31 98.24 0.06 is 0.06 is 0.00 --- 0.00 0.00 --- --- 0.28 36 98.28 0.07 is 0.07 is 0.00 --- 0.00 0.00 --- --- 0.32 41 98.32 0.07 is 0.07 is 0.00 --- 0.00 0.00 --- --- 0.36 47 98.36 0.08 is 0.08 is 0.00 --- 0.00 0.00 --- --- 0.40 52 98.40 0.09 is 0.09 is 0.00 --- 0.00 0.00 --- --- 0.44 61 98.44 0.09 is 0.09 is 0.00 --- 0.00 0.00 --- --- 0.48 70 98.48 0.10 is 0.10 is 0.00 --- 0.00 0.00 --- --- 0.52 79 98.52 0.11 is 0.10 is 0.00 --- 0.00 0.00 --- --- 0.56 88 98.56 0.11 is 0.11 is 0.00 --- 0.00 0.00 --- --- 0.60 97 98.60 0.11 is 0.11 is 0.00 --- 0.00 0.00 --- --- 0.64 106 98.64 0.12 is 0.12 is 0.00 --- 0.00 0.00 --- --- 0.68 115 98.68 0.12 is 0.12 is 0.00 --- 0.00 0.00 --- --- 0.72 124 98.72 0.13 is 0.12 is 0.00 --- 0.00 0.00 --- --- 0.76 134 98.76 0.13 is 0.13 is 0.00 --- 0.00 0.00 --- --- 0.80 143 98.80 0.14 is 0.13 is 0.00 --- 0.00 0.00 --- --- 0.84 154 98.84 0.14 is 0.14 is 0.00 --- 0.00 0.00 --- --- 0.88 165 98.88 0.14 is 0.14 is 0.00 --- 0.00 0.00 --- --- 0.92 176 98.92 0.15 is 0.14 is 0.00 --- 0.00 0.00 --- --- 0.96 187 98.96 0.15 is 0.15 is 0.00 --- 0.00 0.00 --- --- 1.00 198 99.00 0.16 is 0.15 is 0.00 --- 0.00 0.00 --- --- 1.04 209 99.04 0.16 is 0.15 is 0.00 --- 0.00 0.00 --- --- 1.08 220 99.08 0.16 is 0.16 is 0.00 --- 0.00 0.00 --- --- 1.12 231 99.12 0.17 is 0.16 is 0.00 --- 0.00 0.00 --- --- 1.16 242 99.16 0.17 is 0.16 is 0.00 --- 0.00 0.00 --- --- 1.20 253 99.20 0.17 is 0.17 is 0.00 --- 0.00 0.00 --- --- 1.24 266 99.24 0.18 is 0.17 is 0.00 --- 0.00 0.00 --- --- --- --- 0.000 --- --- 0.004 --- --- 0.011 --- --- 0.022 --- --- 0.035 --- --- 0.050 --- --- 0.059 --- --- 0.067 --- --- 0.073 --- --- 0.080 --- --- 0.086 --- --- 0.091 --- --- 0.097 --- --- 0.102 --- --- 0.107 --- --- 0.111 --- --- 0.116 --- --- 0.120 --- --- 0.124 --- --- 0.129 --- --- 0.132 --- --- 0.136 --- --- 0.140 --- --- 0.144 --- --- 0.148 --- --- 0.151 --- --- 0.155 --- --- 0.158 --- --- 0.161 --- --- 0.165 --- --- 0.168 --- --- 0.171 Continues on next page 13 BLDG B UGS Stage / Storage / Discharge Table Stage Storage Elevation CIvA CIvB CIvC PrfRsr WrA WrB WrC WrD Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 1.28 278 99.28 0.18 is 0.17 is 0.00 --- 0.00 0.00 --- --- --- --- 0.174 1.32 290 99.32 0.18 is 0.18 is 0.00 --- 0.00 0.00 --- --- --- --- 0.177 1.36 302 99.36 0.18 is 0.18 is 0.00 --- 0.00 0.00 --- --- --- --- 0.180 1.40 314 99.40 0.19 is 0.18 is 0.00 --- 0.00 0.00 --- --- --- --- 0.183 1.44 327 99.44 0.19 is 0.19 is 0.00 --- 0.00 0.00 --- --- --- --- 0.186 1.48 339 99.48 0.19 is 0.19 is 0.00 --- 0.00 0.00 --- --- --- --- 0.189 1.52 351 99.52 0.20 is 0.19 is 0.00 --- 0.00 0.00 --- --- --- --- 0.191 1.56 363 99.56 0.20 is 0.19 is 0.00 --- 0.00 0.00 --- --- --- --- 0.194 1.60 376 99.60 0.20 is 0.20 is 0.00 --- 0.00 0.00 --- --- --- --- 0.197 1.64 388 99.64 0.20 is 0.20 is 0.00 --- 0.00 0.00 --- --- --- --- 0.200 1.68 401 99.68 0.20 is 0.20 is 0.00 --- 0.00 0.00 --- --- --- --- 0.202 1.72 414 99.72 0.21 is 0.21 is 0.00 --- 0.00 0.00 --- --- --- --- 0.205 1.76 426 99.76 0.21 is 0.21 is 0.00 --- 0.00 0.00 --- --- --- --- 0.208 1.80 439 99.80 0.21 is 0.21 is 0.00 --- 0.00 0.00 --- --- --- --- 0.210 1.84 452 99.84 0.21 is 0.21 is 0.00 --- 0.00 0.00 --- --- --- --- 0.213 1.88 465 99.88 0.22 is 0.22 is 0.00 --- 0.00 0.00 --- --- --- --- 0.215 1.92 477 99.92 0.22 is 0.22 is 0.00 --- 0.00 0.00 --- --- --- --- 0.218 1.96 490 99.96 0.22 is 0.22 is 0.00 --- 0.00 0.00 --- --- --- --- 0.220 2.00 503 100.00 0.22 is 0.22 is 0.00 --- 0.00 0.00 --- --- --- --- 0.223 2.04 516 100.04 0.23 is 0.23 is 0.00 --- 0.00 0.00 --- --- --- --- 0.225 2.08 528 100.08 0.24 is 0.23 is 0.00 --- 0.00 0.00 --- --- --- --- 0.228 2.12 541 100.12 0.24 is 0.23 is 0.00 --- 0.00 0.00 --- --- --- --- 0.230 2.16 554 100.16 0.24 is 0.23 is 0.00 --- 0.00 0.00 --- --- --- --- 0.232 2.20 567 100.20 0.24 is 0.23 is 0.00 --- 0.00 0.00 --- --- --- --- 0.235 2.24 579 100.24 0.24 is 0.24 is 0.00 --- 0.00 0.00 --- --- --- --- 0.237 2.28 592 100.28 0.24 is 0.24 is 0.00 --- 0.00 0.00 --- --- --- --- 0.239 2.32 605 100.32 0.25 is 0.24 is 0.00 --- 0.00 0.00 --- --- --- --- 0.241 2.36 618 100.36 0.25 is 0.24 is 0.00 --- 0.00 0.00 --- --- --- --- 0.244 2.40 630 100.40 0.25 is 0.25 is 0.00 is --- 0.00 0.00 --- --- --- --- 0.246 2.44 643 100.44 0.26 is 0.25 is 0.01 is --- 0.00 0.00 --- --- --- --- 0.253 2.48 655 100.48 0.26 is 0.25 is 0.01 is --- 0.00 0.00 --- --- --- --- 0.264 2.53 667 100.53 0.28 is 0.25 is 0.03 is --- 0.00 0.00 --- --- --- --- 0.277 2.57 679 100.57 0.29 is 0.25 is 0.04 is --- 0.00 0.00 --- --- --- --- 0.292 2.61 691 100.61 0.31 is 0.26 is 0.05 is --- 0.00 0.00 --- --- --- --- 0.308 2.65 704 100.65 0.34 is 0.26 is 0.07 is --- 0.00 0.00 --- --- --- --- 0.326 2.69 716 100.69 0.35 is 0.26 is 0.09 is --- 0.00 0.00 --- --- --- --- 0.345 2.73 728 100.73 0.37 is 0.26 is 0.11 is --- 0.00 0.00 --- --- --- --- 0.366 2.77 740 100.77 0.39 is 0.26 is 0.13 is --- 0.00 0.00 --- --- --- --- 0.388 2.81 752 100.81 0.42 is 0.26 is 0.15 is --- 0.00 0.00 --- --- --- --- 0.410 2.85 763 100.85 0.44 is 0.27 is 0.17 is --- 0.00 0.00 --- --- --- --- 0.434 2.89 775 100.89 0.46 is 0.27 is 0.19 is --- 0.00 0.00 --- --- --- --- 0.459 2.93 786 100.93 0.50 is 0.27 is 0.22 is --- 0.00 0.00 --- --- --- --- 0.485 2.97 797 100.97 0.52 is 0.27 is 0.24 is --- 0.00 0.00 --- --- --- --- 0.512 3.01 808 101.01 0.54 is 0.27 is 0.27 is --- 0.00 0.00 --- --- --- --- 0.539 3.05 819 101.05 0.58 is 0.27 is 0.29 is --- 0.00 0.00 --- --- --- --- 0.568 3.09 830 101.09 0.60 is 0.27 is 0.32 is --- 0.00 0.00 --- --- --- --- 0.593 3.13 841 101.13 0.62 is 0.28 is 0.34 is --- 0.00 0.00 --- --- --- --- 0.612 3.17 852 101.17 0.64 is 0.28 is 0.35 is --- 0.00 0.00 --- --- --- --- 0.630 3.21 863 101.21 0.65 is 0.28 is 0.37 is --- 0.00 0.00 --- --- --- --- 0.648 3.25 872 101.25 0.67 is 0.28 is 0.38 is --- 0.00 0.00 --- --- --- --- 0.665 3.29 881 101.29 0.69 is 0.28 is 0.40 is --- 0.00 0.00 --- --- --- --- 0.681 3.33 890 101.33 0.71 is 0.28 is 0.41 is --- 0.00 0.00 --- --- --- --- 0.697 3.37 899 101.37 0.71 is 0.29 is 0.43 is --- 0.00 0.00 --- --- --- --- 0.713 3.41 908 101.41 0.74 is 0.29 is 0.44 is --- 0.00 0.00 --- --- --- --- 0.728 3.45 918 101.45 0.74 is 0.29 is 0.45 is --- 0.00 0.00 --- --- --- --- 0.742 3.49 927 101.49 0.76 is 0.29 is 0.46 is --- 0.00 0.00 --- --- --- --- 0.756 3.53 936 101.53 0.79 is 0.29 is 0.48 is --- 0.00 0.00 --- --- --- --- 0.770 3.57 945 101.57 0.79 is 0.30 is 0.49 is --- 0.00 0.00 --- --- --- --- 0.784 3.61 954 101.61 0.81 is 0.30 is 0.50 is --- 0.00 0.00 --- --- --- --- 0.797 3.65 959 101.65 0.81 is 0.30 is 0.51 is --- 0.00 0.00 --- --- --- --- 0.810 3.69 964 101.69 0.84 is 0.30 is 0.52 is --- 0.00 0.00 --- --- --- --- 0.823 3.73 969 101.73 0.84 is 0.30 is 0.53 is --- 0.00 0.00 --- --- --- --- 0.836 3.77 975 101.77 0.86 is 0.30 is 0.54 is --- 0.00 0.00 --- --- --- --- 0.848 3.81 980 101.81 0.89 is 0.31 is 0.55 is --- 0.00 0.01 --- --- --- --- 0.871 3.85 985 101.85 1.04 is 0.30 is 0.56 is --- 0.00 0.17 --- --- --- --- 1.043 3.89 990 101.89 1.32 oc 0.30 is 0.57 is --- 0.00 0.43 --- --- --- --- 1.310 3.93 995 101.93 1.65 oc 0.30 is 0.58 is --- 0.00 0.76 --- --- --- --- 1.643 3.97 1,000 101.97 2.03 oc 0.29 is 0.59 is --- 0.00 1.15 --- --- --- --- 2.027 4.01 1,006 102.01 2.47 oc 0.28 is 0.60 is --- 0.00 1.58 --- --- --- --- 2.467 ... End 14 Hydrograph Summary Repo rtH ydraflow Hydrographs Extension for Autodesk@ Civil 3D@ 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.197 1 718 403 ------ ------ ------ PRE-DEV BLDG A 2 SCS Runoff 0.531 1 717 1,264 ------ ------ ------ POST-DEV BLDG A 3 SCS Runoff 0.375 1 718 766 ------ ------ ------ PRE-DEV BLDG B 4 SCS Runoff 1.009 1 717 2,401 ------ ------ ------ POST-DEV BLDG B 5 Reservoir 0.142 1 725 1,262 2 104.85 365 BLDG A - UGS ROUTE 6 Reservoir 0.303 1 725 2,400 4 100.60 687 BLDG B - UGS ROUTE 2019-05-20 SILER PRE -POST - INCREASE CHtftbfrgperiod: 2 Year Tuesday, 05 / 21 / 2019 15 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 05 / 21 / 2019 Hyd. No. 1 PRE-DEV BLDG A Hydrograph type = SCS Runoff Peak discharge = 0.197 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 403 cuft Drainage area = 0.100 ac Curve number = 70* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.61 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0.100 x 70)] / 0.100 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 PRE-DEV BLDG A Hyd. No. 1 -- 2 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 16 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 05 / 21 / 2019 Hyd. No. 2 POST-DEV BLDG A Hydrograph type = SCS Runoff Peak discharge = 0.531 cfs Storm frequency = 2 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 1,264 cuft Drainage area = 0.100 ac Curve number = 98* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.61 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0.100 x 98)] / 0.100 Q (cfs) POST-DEV BLDG A Hyd. No. 2 -- 2 Year Q (cfs) MI 0 120 240 360 480 600 720 840 960 Hyd No. 2 1080 1200 Time (min) 17 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 05 / 21 / 2019 Hyd. No. 3 PRE-DEV BLDG B Hydrograph type = SCS Runoff Peak discharge = 0.375 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 766 cuft Drainage area = 0.190 ac Curve number = 70* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.61 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0.190 x 70)] / 0.190 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 PRE-DEV BLDG B Hyd. No. 3 -- 2 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report 18 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO 2019 by Autodesk, Inc. v2020 Hyd. No. 4 POST-DEV BLDG B Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 0.190 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.61 in Distribution Storm duration = 24 hrs Shape factor Composite (Area/CN) = [(0.195 x 98)] / 0.190 Q (cfs) 2.00 1.00 0.00 0 120 240 360 480 600 720 840 Hyd No. 4 POST-DEV BLDG B Hyd. No. 4 -- 2 Year Tuesday, 05 / 21 / 2019 = 1.009 cfs = 717 min = 2,401 cuft = 98* = 0 ft = 5.00 min = Type II = 484 960 1080 Q (cfs) 2.00 1.00 0.00 1200 Time (min) 19 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 05 / 21 / 2019 Hyd. No. 5 BLDG A - UGS ROUTE Hydrograph type = Reservoir Peak discharge = 0.142 cfs Storm frequency = 2 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 1,262 cuft Inflow hyd. No. = 2 - POST-DEV BLDG A Max. Elevation = 104.85 ft Reservoir name = BLDG A UGS Max. Storage = 365 cuft Storage Indication method used. Q (cfs) 1.00 0.90 WE 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0 BLDG A - UGS ROUTE Hyd. No. 5 -- 2 Year Q (cfs) 1.00 0.90 N :M 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 — Hyd No. 2 Total storage used = 365 cult Time (min) Hydrograph Report 20 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 05 / 21 / 2019 Hyd. No. 6 BLDG B - UGS ROUTE Hydrograph type = Reservoir Peak discharge = 0.303 cfs Storm frequency = 2 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 2,400 cuft Inflow hyd. No. = 4 - POST-DEV BLDG B Max. Elevation = 100.60 ft Reservoir name = BLDG BUGS Max. Storage = 687 cuft Storage Indication method used Q (cfs) 2.00 1.00 BLDG B - UGS ROUTE Hyd. No. 6 -- 2 Year 120 240 360 480 600 720 Hyd No. 6 Hyd No. 4 Q (cfs) 2.00 1.00 0.00 840 960 1080 1200 1320 1440 1560 Total storage used = 687 cult Time (min) 21 Hydrograph Summary Repo rtH ydraflow Hydrographs Extension for Autodesk@ Civil 3D@ 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.313 1 718 629 ------ ------ ------ PRE-DEV BLDG A 2 SCS Runoff 0.666 1 717 1,600 ------ ------ ------ POST-DEV BLDG A 3 SCS Runoff 0.594 1 718 1,195 ------ ------ ------ PRE-DEV BLDG B 4 SCS Runoff 1.265 1 717 3,040 ------ ------ ------ POST-DEV BLDG B 5 Reservoir 0.293 1 723 1,598 2 105.21 444 BLDG A - UGS ROUTE 6 Reservoir 0.592 1 723 3,039 4 101.09 829 BLDG B - UGS ROUTE 2019-05-20 SILER PRE -POST - INCREASE CHtftbfrgperiod: 5 Year Tuesday, 05 / 21 / 2019 22 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 05 / 21 / 2019 Hyd. No. 1 PRE-DEV BLDG A Hydrograph type = SCS Runoff Peak discharge = 0.313 cfs Storm frequency = 5 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 629 cuft Drainage area = 0.100 ac Curve number = 70* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.51 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0.100 x 70)] / 0.100 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 PRE-DEV BLDG A Hyd. No. 1 -- 5 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 23 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 05 / 21 / 2019 Hyd. No. 2 POST-DEV BLDG A Hydrograph type = SCS Runoff Peak discharge = 0.666 cfs Storm frequency = 5 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 1,600 cuft Drainage area = 0.100 ac Curve number = 98* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.51 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0.100 x 98)] / 0.100 Q (cfs) POST-DEV BLDG A Hyd. No. 2 -- 5 Year Q (cfs) 0 120 240 360 480 600 720 840 960 Hyd No. 2 1080 1200 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 05 / 21 / 2019 Hyd. No. 3 PRE-DEV BLDG B Hydrograph type = SCS Runoff Peak discharge = 0.594 cfs Storm frequency = 5 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 1,195 cuft Drainage area = 0.190 ac Curve number = 70* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.51 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0.190 x 70)] / 0.190 Q (cfs) 1.00 0.90 WE 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0 PRE-DEV BLDG B Hyd. No. 3 -- 5 Year Q (cfs) 1.00 0.90 M :M 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report 25 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO 2019 by Autodesk, Inc. v2020 Hyd. No. 4 POST-DEV BLDG B Hydrograph type = SCS Runoff Peak discharge Storm frequency = 5 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 0.190 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 4.51 in Distribution Storm duration = 24 hrs Shape factor Composite (Area/CN) = [(0.195 x 98)] / 0.190 Q (cfs) 2.00 1.00 0.00 0 120 240 360 480 600 720 840 Hyd No. 4 POST-DEV BLDG B Hyd. No. 4 -- 5 Year Tuesday, 05 / 21 / 2019 = 1.265 cfs = 717 min = 3,040 cuft = 98* = 0 ft = 5.00 min = Type II = 484 960 1080 Q (cfs) 2.00 1.00 0.00 1200 Time (min) 26 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 05 / 21 / 2019 Hyd. No. 5 BLDG A - UGS ROUTE Hydrograph type = Reservoir Peak discharge = 0.293 cfs Storm frequency = 5 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 1,598 cuft Inflow hyd. No. = 2 - POST-DEV BLDG A Max. Elevation = 105.21 ft Reservoir name = BLDG A UGS Max. Storage = 444 cuft Storage Indication method used. Q (cfs) 1.00 0.90 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0 00 BLDG A - UGS ROUTE Hyd. No. 5 -- 5 Year Q (cfs) 1.00 0.90 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 5 — Hyd No. 2 Total storage used = 444 cult Hydrograph Report 27 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 05 / 21 / 2019 Hyd. No. 6 BLDG B - UGS ROUTE Hydrograph type = Reservoir Peak discharge = 0.592 cfs Storm frequency = 5 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 3,039 cuft Inflow hyd. No. = 4 - POST-DEV BLDG B Max. Elevation = 101.09 ft Reservoir name = BLDG BUGS Max. Storage = 829 cuft Storage Indication method used Q (cfs) 2.00 1.00 BLDG B - UGS ROUTE Hyd. No. 6 -- 5 Year 120 240 360 480 600 720 Hyd No. 6 Hyd No. 4 Q (cfs) 2.00 1.00 0.00 840 960 1080 1200 1320 1440 1560 Total storage used = 829 cult Time (min) 28 Hydrograph Summary Repo rtH ydraflow Hydrographs Extension for Autodesk@ Civil 3D@ 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.412 1 718 827 ------ ------ ------ PRE-DEV BLDG A 2 SCS Runoff 0.773 1 717 1,869 ------ ------ ------ POST-DEV BLDG A 3 SCS Runoff 0.782 1 718 1,571 ------ ------ ------ PRE-DEV BLDG B 4 SCS Runoff 1.470 1 717 3,551 ------ ------ ------ POST-DEV BLDG B 5 Reservoir 0.408 1 722 1,867 2 105.46 493 BLDG A - UGS ROUTE 6 Reservoir 0.762 1 722 3,550 4 101.51 930 BLDG B - UGS ROUTE 2019-05-20 SILER PRE -POST - INCREASE CHtftbfrgperiod: 10 Year Tuesday, 05 / 21 / 2019 29 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 05 / 21 / 2019 Hyd. No. 1 PRE-DEV BLDG A Hydrograph type = SCS Runoff Peak discharge = 0.412 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 827 cuft Drainage area = 0.100 ac Curve number = 70* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.23 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0.100 x 70)] / 0.100 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 PRE-DEV BLDG A Hyd. No. 1 -- 10 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 30 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 05 / 21 / 2019 Hyd. No. 2 POST-DEV BLDG A Hydrograph type = SCS Runoff Peak discharge = 0.773 cfs Storm frequency = 10 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 1,869 cuft Drainage area = 0.100 ac Curve number = 98* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.23 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0.100 x 98)] / 0.100 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0 00 POST-DEV BLDG A Hyd. No. 2 -- 10 Year 0 120 240 360 480 600 720 840 960 Hyd No. 2 Q (cfs) 31 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 05 / 21 / 2019 Hyd. No. 3 PRE-DEV BLDG B Hydrograph type = SCS Runoff Peak discharge = 0.782 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 1,571 cuft Drainage area = 0.190 ac Curve number = 70* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.23 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0.190 x 70)] / 0.190 Q (cfs) 1.00 0.90 WE 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0 PRE-DEV BLDG B Hyd. No. 3 -- 10 Year Q (cfs) 1.00 0.90 M :M 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report 32 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO 2019 by Autodesk, Inc. v2020 Hyd. No. 4 POST-DEV BLDG B Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 0.190 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 5.23 in Distribution Storm duration = 24 hrs Shape factor Composite (Area/CN) = [(0.195 x 98)] / 0.190 Q (cfs) 2.00 1.00 0.00 0 120 240 360 480 600 720 840 Hyd No. 4 POST-DEV BLDG B Hyd. No. 4 -- 10 Year Tuesday, 05 / 21 / 2019 = 1.470 cfs = 717 min = 3,551 cuft = 98* = 0 ft = 5.00 min = Type II = 484 960 1080 Q (cfs) 2.00 1.00 0.00 1200 Time (min) 33 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 05 / 21 / 2019 Hyd. No. 5 BLDG A - UGS ROUTE Hydrograph type = Reservoir Peak discharge = 0.408 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 1,867 cuft Inflow hyd. No. = 2 - POST-DEV BLDG A Max. Elevation = 105.46 ft Reservoir name = BLDG A UGS Max. Storage = 493 cuft Storage Indication method used. Q (cfs) 1.00 0.90 WE 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0 BLDG A - UGS ROUTE Hyd. No. 5 -- 10 Year Q (cfs) 1.00 0.90 N :M 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 — Hyd No. 2 Total storage used = 493 cult Time (min) Hydrograph Report 34 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 05 / 21 / 2019 Hyd. No. 6 BLDG B - UGS ROUTE Hydrograph type = Reservoir Peak discharge = 0.762 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 3,550 cuft Inflow hyd. No. = 4 - POST-DEV BLDG B Max. Elevation = 101.51 ft Reservoir name = BLDG BUGS Max. Storage = 930 cuft Storage Indication method used Q (cfs) 2.00 1.00 BLDG B - UGS ROUTE Hyd. No. 6 -- 10 Year 120 240 360 480 600 720 Hyd No. 6 Hyd No. 4 Q (cfs) 2.00 1.00 0.00 840 960 1080 1200 1320 1440 1560 Total storage used = 930 cult Time (min) 35 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodeskg Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 05 / 21 / 2019 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (NIA) 1 63.8568 12.6000 0.8882 -------- 2 73.1817 12.7000 0.8750 -------- 3 0.0000 0.0000 0.0000 -------- 5 79.8313 13.1000 0.8465 -------- 10 77.3185 12.7000 0.8111 -------- 25 64.6079 11.1000 0.7420 -------- 50 58.1851 10.2000 0.6990 -------- 100 50.8258 9.0000 0.6516 -------- File name: 2019-05-20 NOAA IDF - SILER CITY.IDF Intensity = B / (Tc + D)^E Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 5.00 4.00 3.35 2.89 2.55 2.28 2.07 1.89 1.74 1.62 1.51 1.42 2 5.92 4.76 4.00 3.46 3.06 2.74 2.49 2.28 2.11 1.96 1.83 1.72 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.88 5.60 4.74 4.13 3.66 3.30 3.01 2.77 2.56 2.39 2.24 2.11 10 7.52 6.14 5.23 4.57 4.07 3.68 3.36 3.10 2.88 2.69 2.53 2.39 25 8.22 6.72 5.74 5.04 4.51 4.10 3.77 3.49 3.25 3.05 2.88 2.73 50 8.68 7.12 6.10 5.37 4.83 4.40 4.05 3.77 3.53 3.32 3.14 2.98 100 9.10 7.46 6.41 5.66 5.11 4.67 4.32 4.02 3.78 3.57 3.38 3.22 Tc = time in minutes. Values may exceed 60. D HOME\SILER SCHOOL 5-20\CIVIL-18-023\Desian\Stormwater\Hvdraflow\2019-05-20 NOAA PCP - SILER CITY.DCD Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.99 3.61 0.00 4.51 5.23 6.19 6.95 7.74 SCS 6-Hr 2.19 2.65 0.00 3.30 3.79 4.45 4.97 5.49 Huff-1 st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hydraflow Table of Contents 2019-05-20 SILER PRE -POST - INCREASE ONLY.gpw Hydraflow Hydrographs Extension for Autodeskg Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 05 / 21 / 2019 Watershed Model Schematic...................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 -Year SummaryReport......................................................................................................................... 3 HydrographReports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, PRE-DEV BLDG A............................................................... 4 Hydrograph No. 2, SCS Runoff, POST-DEV BLDG A............................................................. 5 Hydrograph No. 3, SCS Runoff, PRE-DEV BLDG B................................................................ 6 Hydrograph No. 4, SCS Runoff, POST-DEV BLDG B.............................................................. 7 Hydrograph No. 5, Reservoir, BLDG A - UGS ROUTE........................................................... 8 Pond Report - BLDG A UGS................................................................................................ 9 Hydrograph No. 6, Reservoir, BLDG B - UGS ROUTE.......................................................... 11 Pond Report - BLDG B UGS............................................................................................. 12 2 - Year SummaryReport ....................................................................................................................... 14 HydrographReports................................................................................................................. 15 Hydrograph No. 1, SCS Runoff, PRE-DEV BLDG A............................................................. 15 Hydrograph No. 2, SCS Runoff, POST-DEV BLDG A ........................................................... 16 Hydrograph No. 3, SCS Runoff, PRE-DEV BLDG B.............................................................. 17 Hydrograph No. 4, SCS Runoff, POST-DEV BLDG B............................................................ 18 Hydrograph No. 5, Reservoir, BLDG A - UGS ROUTE......................................................... 19 Hydrograph No. 6, Reservoir, BLDG B - UGS ROUTE.......................................................... 20 5 - Year SummaryReport ....................................................................................................................... 21 HydrographReports................................................................................................................. 22 Hydrograph No. 1, SCS Runoff, PRE-DEV BLDG A............................................................. 22 Hydrograph No. 2, SCS Runoff, POST-DEV BLDG A ........................................................... 23 Hydrograph No. 3, SCS Runoff, PRE-DEV BLDG B.............................................................. 24 Hydrograph No. 4, SCS Runoff, POST-DEV BLDG B............................................................ 25 Hydrograph No. 5, Reservoir, BLDG A - UGS ROUTE......................................................... 26 Hydrograph No. 6, Reservoir, BLDG B - UGS ROUTE.......................................................... 27 10 -Year SummaryReport ....................................................................................................................... 28 HydrographReports................................................................................................................. 29 Hydrograph No. 1, SCS Runoff, PRE-DEV BLDG A............................................................. 29 Hydrograph No. 2, SCS Runoff, POST-DEV BLDG A ........................................................... 30 Hydrograph No. 3, SCS Runoff, PRE-DEV BLDG B.............................................................. 31 Hydrograph No. 4, SCS Runoff, POST-DEV BLDG B............................................................ 32 Hydrograph No. 5, Reservoir, BLDG A - UGS ROUTE......................................................... 33 Hydrograph No. 6, Reservoir, BLDG B - UGS ROUTE.......................................................... 34 OFReport.................................................................................................................. 35 CaIOEESIGN & ENGINEERING, PLLC CLIENT -FOCUSED • COMPREHENSIVE • COST-EFFECTIVE 2537E. LYON STATION RD, STE 102 PO BOX 361 FILTERRA SCM INFORMATION CREEDMOOR, NC 27522 919-625-7368 Environmental NCDEQ Stormwater Design Manual I C& Quality drainage areas that are larger, or not fully impervious, Contech Engineered Solutions can prepare a custom sizing on a project specific basis to provide the most economical system design. Table 1. Filterra Sizing based on Withers & Ravene/ (2008) and NC Stormwater Rules 4x4 4x6 / 6x4 4x8 / 8x4 6x6 6x8 / 8x6 / 4x12 / 12x4 6x10 / 10x6 6x12 / 12x6 16 0.06 24 0.14 32 0.19 36 0.21 48 0.28 60 0.35 72 0.42 91 — Other / Custom Sizes / TBD Media Area = 0.39% Filterra Bioscape 1. Contact Contech for information on other available configurations. 2. A standard PVC coupling is cast into the wall to connect to discharge piping. 3. Dimensions shown are internal. 4" PVC 4" PVC 4" PVC 4" PVC 4" PVC 6" PVC 6" PVC 611�Fr- TBD MDC 2. PONDING DEPTH FOR DESIGN. The ponding depth for the design water quality volume shall be 9 inches above the media layer for standard designs. Custom designs in coordination with Contech Engineered Solutions may vary. MDC 3. UNDERDRAIN. For Filterra units up to 48 square feet in media surface area, a 4" underdrain will be utilized. For larger surface areas (up to maximum standard sizes) a 6" underdrain will be utilized. The underdrain system is connected on outside of modular container by means of a PVC coupler. D-3. Filterra 5 Revised: 2-11-2018 CaIOEESIGN & ENGINEERING, PLLC CLIENT -FOCUSED • COMPREHENSIVE • COST-EFFECTIVE 2537E. LYON STAT/ON RD, STE 102 PO BOX 361 CREEDMOOR, NC 27522 919-625-7368 POST DELINEATIONS OF IMPERVIOUS AREAS POST- IMPERVIOUS DELINEATIONS 2019-06-15 C EA TOTAL PROPERTY AREA: ±1 01 7017 SF TOTAL PROPOSED IMPERVIOUS AREA: ± 567123 SF (55.56%) TOTAL INCREASE: 10,878 SF (24.10%) ±4,398 SF BUILDING 1 ±8,778 SF BUILDING 2 U 255 SF PICNIC SHELTER ±25,213 SF qG SF 3 / PADS 1,858 SF ILDING 3 CaIOEESIGN & ENGINEERING, PLLC CLIENT -FOCUSED • COMPREHENSIVE • COST-EFFECTIVE 2537E. LYON STAT/ON RD, STE 102 PO BOX 361 CREEDMOOR, NC 27522 919-625-7368 INLET AREAS AND PIPE CALCULATIONS DRAINAGE AREA TO DWAY PIPE IMPERVIOUS- 268 SF SF TOTAL AREA= 2682 SF I VY � j , \ v� DRAINAGE AREA TO ST \ /\ \ IMPERVIOUS SF TOTAL AREA=21 924 SF \ DRAINAGE AREA TO ST- I IMPERVIOUS= 7374 SF TOTAL AREA =8]69 SF � \ E 3 �� \ , -` IMP EfJAGE�4REA TO ST-1 \ \ IMPER`/IOL}� 500 SF (ALL` N ) /1A TOTAL -DRX REA TO ST 4 PERVIOUS 5, 874 SF TALAREA= 8SF 01 �\ �S 1 \ 4 `�• /� Ogg /Vo�/ / —mz05 AID �4 V�To--00 I �0 � 900 00 D@AILIAGE ARE O S /�' L� �A —100 \ \ _ O IMPERV _ F -- �� / /1 \ j7osr % �100 00 99J \ \5� %1 0 / / o—/ %0 10 - '00 J\ 9 INLET DELINEATIONS 3 g6 2019-06-17 C EA 96� 95` Storm Sewer Profile Proj. file: 2019-06-17 Parking Lot Drainage System.stm Elev. (ft) 119.00 c O M - 0 M M o o O -o W 6 c j6 c 00 + O HMV C, CO �_{ WWW E j j6 N O c o nub �.0� moo + WWW j j0 CI) c OE o00 �OM Moo CO N WWW j j d O 00 �(0 o0 CO WW �0 j 119.00 115.00 111.00 115.00 111.00 107.00 107.00 103.00 103.00 -------- -- - -- ------ 0 ---- -- - --- @ 0 • ° - 15" 79fiu 0/C 99.00 0 25 50 75 100 HGL EGL 125 150 175 200 225 Reach (ft) 99.00 250 275 300 325 Storm Sewers Storm Sewer Profile Proj. file: 2019-06-17 Parking Lot Drainage System.stm Elev. (ft) 114.00 42 O o c � O Ocz�q g w o-ow Cu E > cn C7 LO J �0 M O O CD + Ww m E> cn o s 114.00 110.00 106.00 110.00 106.00 - ` 102.00 98.00 94.00 -- 02.00 _ --- -- o 98.00 94.00 0 10 20 30 40 50 60 70 80 90 100 110 HGL EGL Reach (ft) Storm Sewers Line Profile (Line 1) - P1 Page 1 of 1 Line 1 - P1 EIew (ft) 105.O[} 105.00 ..................................... 103.00 101.O[} 101.00 v 1 v 2 v- 4-- 80 a 1 11D 120 130 140 Reach (ft) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 1 5.35 102.30 103.35 0.89 0.89 0.89 103.19 104.24 104.24 4.90 4.89 2.55 1.25 Project File: No. Lines: 5 Run Date: 6/18/2019 Storm Sewers Line Profile (Line 2) - P2 Page 1 of 1 Une 2 - P2 EIev (ft) 11 v.vv 11OM ST-3 IT--2 1015.01) 106.OD 1 v .vv ........... 104.00 . .... _. .... _..............• ... ................ .7� �I I rV Linea 1 v..vv Line, I 10.00 1 vv.vv 1 I}OM v 5 16 16 2v.25 30 35v0 Reach (ft) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 2 4.34 103.45 104.05 0.79 0.84 0.84 104.24 104.89 104.89 5.30 4.93 1.40 2.10 Project File: No. Lines: 5 Run Date: 6/18/2019 Storm Sewers Line Profile (Line 3) - P3 Page 1 of 1 Line 3 - P3 Elev (ft) 109.0^- 107.M — MEOW- 66 408E� - 15- @-U-. 98% F—I 1 DiM 5 10 15 20 25 �O a5 40 45 F v R r-60 65 70 75 80 Reach (ft) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 3 1.48 104.15 104.80 0.74 0.48 0.48 104.89 105.28 j 105.28 1.94 3.39 2.00 3.45 Project File: No. Lines: 5 Run Date: 6/18/2019 Storm Sewers Line Profile (Line 4) - P4 Page 1 of 1 Line 4 - N 109.()^- — . . . . ......... ......... ........... ........... ............ ........ .... ...... ........... . .... .......... ........... .................. �l 69.000-f -1 F. @ e3 1 v1.vv 1131M 15 20 25 30 35 40 45 50 FF 60 65 71D 75 80 Reach (ft) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 4 0.24 104.90 105.60 0.38 0.19 0.19 105.28 105.79 j 105.79 0.77 2.06 3.35 3.55 Project File: No. Lines: 5 Run Date: 6/18/2019 Storm Sewers Line Profile (Line 5) - OUTFALL 1 Page 1of1 Line 5 - OUTFALL I El e+ (0) 1 1 v.vv 110.00 106.C-v - - - 106.00 1 v.2.30 102.00 SIP 9G.00 94.00 9D.00 10 20 30 40 50 00 70 00 9D 100 110 120 130 Reach (ft) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q 10 Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 5 5.68 97.50 102.10 0.53 0.92 0.92 98.03 103.02 103.02 10.16 5.01 -1.50 2.75 Project File: No. Lines: 5 Run Date: 6/18/2019 Storm Sewers CaIOEESIGN & ENGINEERING, PLLC CLIENT -FOCUSED • COMPREHENSIVE • COST-EFFECTIVE MISC DATA: 2537E. LYON STATION RD, STE 102 PO BOX 361 CREEDMOOR, NC 27522 919-625-7368 -NOAA RAINFALL CHARTS NOAA Atlas 14, Volume 2, Version 3 ' Location name: Siler City, North Carolina, USA*; Latitude: 35.7229*, Longitude:-79.4702* Elevation: 628.82 ft** *source ESRI Maps'w **source USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 0.417 0.494 0.573 0.627 0.686 0.724 0.759 0.787 0.817 0.837 5-min (0.381-0.457) (0.452-0.542) (0.523-0.629) (0.571-0.686) (0.622-0.750) (0.654-0.792) (0.682-0.830) (0.704-0.862) (0.724-0.895) (0.736-0.918) 0.666 0.790 0.917 1.00 1.09 1.15 1.21 1.25 1.29 1.32 10-min (0.608-0.730) (0.722-0.868) (0.838-1.01) (0.913-1.10) (0.991-1.20) 1 (1.04-1.26) 1 (1.08-1.32) 1 (1.15-1.42) 11 (1.16-1.45) 15-min 0.832 (0.761-0.913) 0.994 (0.908-1.09) 1.16 1 (1.06-1.27) 1.27 1 (1.16-1.39) 1.39 1 (1.26-1.52) 1.46 1 (1.32-1.60) 1.52 1 (1.37-1.67) 1.57 1.63 1 (1.44-1.78) 1.65 (1.45-1.81) 30-min 1.14 (1.04-1.25) 1.37 1 (1.25-1.51) 1.65 1 (1.51-1.81) 1.84 1 (1.67-2.01) 2.05 1 (1.86-2.25) 2.20 1 (1.99-2.41) 2.33 1 (2.10-2.55) 2.45 2.59 1 (2.29-2.84) 2.68 (2.36-2.94) 60-min 1.42 (1.30-1.56) 1.72 1 (1.57-1.89) 2.11 1 (1.93-2.32) 2.39 1 (2.18-2.62) F 2.98 1 (2.69-3.26) 11 3.22 (2.89-3.52) 3.44 1 (3.07-3.76) 3.71 1 (3.29-4.07) 3.91 1 (3.44-4.29) 2-hr 1.70 (1.55-1.88) 2.07 1 (1.89-2.28) 2.56 1 (2.33-2.82) 2.92 1 (2.65-3.22) 3.38 1 (3.05-3.72) 3.72 1 (3.34-4.09) 4.06 1 (3.62-4.46) 4.38 1 (3.88-4.82) 4.80 1 (4.21-5.28) 5.12 1 (4.45-5.65) 1.82 2.21 2.75 3.15 3.67 4.07 4.47 4.86 5.39 5.81 3-hr (1.66-2.00) (2.02-2.43) 1 (2.51-3.02) 1 (2.87-3.45) 1 (3.32-4.02) 1 (3.66-4.46) 1 (3.98-4.89) 1 (4.31-5.33) 1 (4.72-5.91) (5.02-6.38) 6-hr 0 EGG a 7. (5.3616.56) (5. 6774.35) (6. 83.98) 2.60 3.14 3.93 4.55 5.40 6.07 6.77 7.50 8.51 9.32 12-hr (2.38-2.84) 1 (2.89-3.45) 1 (3.60-4.31) 1 (4.15-4.98) 1 (4.88-5.88) 1 (5.45-6.60) 1 (6.01-7.35) 1 (6.58-8.13) (7.34-9.23) (7.92-10.1) 6 (7. 6 9420) (8. 4--10.4) (9.60-11.4) 2-day 3.51 (3.29-3.76) 4.22 (3.96-4.53) 5.25 (4.92-5.63) 6.04 (5.64-6.48) 7.11 (6.62-7.64) 7.95 (7.38-8.54) A(8.15-9.49) 8.82 9.70 (8.95-10.5) 10.9 (10.0-11.8) 11.9 (10.8-12.9) 3-day 3.72 (3.49-3.99) 4.47 (4.19-4.80) 5.53 (5.18-5.93) 6.36 (5.94-6.82) 7.48 1 (6.96-8.02) 8.37 (7.75-8.97) 9.27 1 (8.56-9.96) 10.2 (9.40-11.0) 11.5 (10.5-12.4) 12.5 (11.4-13.5) 4-day 3.94 (3.69-4.22) 4.72 (4.42-5.06) 5.82 (5.44-6.23) 6.68 (6.23-7.15) 7.85 (7.29-8.41) 8.78 (8.13-9.40) 9.72 (8.98-10.4) 10.7 (9.85-11.5) 12.1 (11.0-13.0) 13.1 (11.9-14.2) 7-day 4.52 (4.26-4.83) 5.40 (5.07-5.76) 6.56 (6.16-7.00) 7.49 (7.02-7.99) 8.75 (8.18-9.35) 9.76 (9.08-10.4) 10.8 (9.99-11.5) 11.8 (10.9-12.7) 13.3 (12.2-14.3) 14.5 (13.2-15.6) 10tlay 5.15 6.12 7.35 8.32 9.63 10.7 11.7 12.8 14.2 15.3 (4.86-5.48) (5.77-6.52) 1 (6.92-7.83) 1 (7.82-8.87) (9.01-10.3) 1 (9.94-11.4) 1 (10.9-12.5) (11.8-13.6) 1 (13.1-15.2) 1 (14.1-16.5) 20tlay 6.92 8.16 9.64 10.8 12.4 13.6 14.9 16.2 17.9 19.3 (6.54-7.31) (7.73-8.62) 1 (9.11-10.2) 1 (10.2-11.4) 1 (12.8-14.4) (13.9-15.8) 1 (16.6-19.1) (17.8-20.6) 30tlay 8.57 10.1 11.7 13.0 14.7 16.0 17.2 18.5 20.2 21.6 (8.17-9.02) (9.60-10.6) 1 (11.1-12.3) 1 (12.3-13.7) 1 (15.1-16.8) (16.2-18.2) 1 (17.4-19.6) 1 (18.9-21.4) 1 (20.1-22.9) 45tlay 10.9 12.8 14.6 16.1 17.9F 19.3 20.7 22.1 23.9 25.3 (10.4-11.5) (12.2-13.4) 1 (13.9-15.3) 1 (15.3-16.8) (17.0-18.8) (18.3-20.3) A (19.6-21.8) 1 (22.5-25.2) (23.7-26.7) 60tlay 13.1 15.2 17.2 18.7 20.7 22.2 23.6 25.0 26.8 28.1 (12.5-13.7) (14.6-16.0) (16.5-18.0) (17.9-19.6) (19.7-21.7) (21.1-23.2) (22.4-24.8) (23.7-26.2) (25.3-28.2) (26.5-29.7) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90 % confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAAAtlas 14 document for more information. Back to Top c .�u 25 5 0 PF graphical PD5-based depth -duration -frequency {DDT} curves Latitude: 35.7229', Longitude:-79.4702' E 1= 1= E E -0 -0-0 -0 -0 -0 -0 -0-0 u'S 61A Q O A rh Lb A �" 1 f+l A f� V fM1 6 OO O LA 6rl rl m lG '-I N rn r km Duration 30 25 a r 20 0 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NQAA Atlas 14, Volume 2, Version 3 Created {GMTY Thu May 2 22:44:24 2019 Back to Top Average recurrence interval (years) — 1 2 5 10 25 50 100 200 500 1000 Duration — 5-min — 2-day — 10-min — 3-day 15-min — 4-day — 3Dfnin — 7-day — 6D�rnin — 1 0-day — 2fir — 20-day — "r — 30-day — 8-rr — 45-day — 12-hr — 60-day — 24-hr Maps & aerials Small scale terrain � Siler City J. 5ltF.R ❑ zr .YUM J }11.Rp 0.R7 L. ii a 3km mi Large scale terrain l i Winston-Salem • • Durham � Greenshoral Raleigh ' Rocky Mi NORTH CAROLIAA •' 'Charlotte Fayetteville; Je e 1001km ' 1 i,;AL a n,I IT T 11 a ,. Large scale map inston-TalerrvGreensboro Durham oRoky Mr Raleigh Y I+rth Carolina art Otte F W ettevi I l e .r 1001km 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questionsidnoaa.aov Disclaimer NOAA Atlas 14, Volume 2, Version 3 ' Location name: Siler City, North Carolina, USA*; Latitude: 35.7229*, Longitude:-79.4702* Elevation: 628.82 ft** *source ESRI Maps'w **source USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval (years) Duration 1 100 1 2 5 10 25 50 00 200 500 1000 9.10-min 0.0) (8.45410.3) (8.69$ 0.7) (8.80 4.00 4.74 5.50 6.02 6.56 6.92 7.24 7.48 7.75 7.91 (3.65-4.38) 1 (4.33-5.21) 1 (5.03-6.04) 1 (5.48-6.59) (5.95-7.18) 1 (6.25-7.57) (6.50-7.91) (6.70-8.20) (6.87-8.49) 1 (6.95-8.67) 15-min 1 2-5. (4.62-5.56) 5.54 (5.02-6.06) (�3) 6.10 (5.48-6.6. 6.30 (5.63-6.90) 6.50 (5.76-7.12) 6.62 (5.82-7.26) �) (� (3.35-4.02) 54 �3) (� 4.20-5. i i� 4.90 (4.38-5.37) 5.17 (4.59-5.67) 5.36 (4.71-5.87) AEG 11 (3.074476) 1 (3.29 4..07) (3.44 4129) 0.852 1.03 1.28 1.46 1.69 1.86 2.03 2.19 2.40 2.56 2-hr (0.777-0.939) (0.944-1.14) 1 (1.17-1.41) 1 (1.33-1.61) 1 (1.53-1.86) 1 (1.67-2.05) (1.81-2.23) (1.94-2.41) (2.11-2.64) (2.22-2.82) 0.606 1 F 0.736 1 F 0.914 1.05 1.22 1.36 1.49 1.62 1.80 1.93 3-hr (0.554-0.666) (0.673-0.810) (0.834-1.00) (0.954-1.15) 1 (1.22-1.48) (1.33-1.63) 1 (1.43-1.77) 1 (1.57-1.97) 1 (1.67-2.12) 0.365 0.443 0.551 0.633 0.744 0.830 0.917 1.00 1.13 1.22 6-hr (0.335-0.401) (0.407-0.485) (0.504-0.603) (0.578-0.692) (0.673-0.811) (0.746-0.904) (0.818-0.999) (0.887-1.10) (0.979-1.23) (1.05-1.33) 0.215 0.261 0.326 0.378 0.448 0.504 0.562 0.622 0.706 0.774 12-hr (0.198-0.236) (0.240-0.286) (0.299-0.357) (0.344-0.413) (0.405-0.488) (0.452-0.548) (0.499-0.610) (0.546-0.675) (0.609-0.766) (0.657-0.839) 0.125 0.150 0.188 0.218 0.258 0.290 0.322 0.356 0.402 0.439 24-hr (0.116-0.134) (0.141-0.161) (0.176-0.202) (0.203-0.234) (0.240-0.277) (0.268-0.311) (0.298-0.347) (0.328-0.383) (0.368-0.434) (0.400-0.474) 0.073 0.088 0.109 0.126 0.148 0.166 0.184 0.202 0.227 0.247 2-day (0.068-0.078) (0.082-0.094) (0.102-0.117) (0.118-0.135) (0.138-0.159) (0.154-0.178) (0.170-0.198) (0.186-0.218) (0.208-0.246) (0.226-0.268) 0.052 0.062 0.077 0.088 0.104 0.116 0.129 0.142 0.160 0.174 3-day (0.048-0.055) (0.058-0.067) (0.072-0.082) (0.082-0.095) (0.097-0.111) (0.108-0.125) (0.119-0.138) (0.130-0.153) (0.146-0.172) (0.158-0.188) 0.041 0.049 0.061 0.070 0.082 0.091 0.101 0.112 0.126 0.137 4-day (0.038-0.044) (0.046-0.053) (0.057-0.065) (0.065-0.074) (0.076-0.088) (0.085-0.098) (0.093-0.109) (0.103-0.120) (0.115-0.135) (0.124-0.147) 0.027 0.032 0.039 0.045 0.052 0.058 0.064 0.071 0.079 0.086 7-day (0.025-0.029) (0.030-0.034) (0.037-0.042) (0.042-0.048) (0.049-0.056) (0.054-0.062) (0.059-0.069) (0.065-0.076) (0.073-0.085) (0.079-0.093) 10tlay 0.021 0.026 0.031 0.035 0.040 0.044 0.049 0.053 0.059 0.064 (0.020-0.023) (0.024-0.027) (0.029-0.033) (0.033-0.037) (0.038-0.043) (0.041-0.047) (0.045-0.052) (0.049-0.057) (0.055-0.063) (0.059-0.069) 20tlay 0.014 0.017 0.020 0.023 0.026 0.028 0.031 0.034 0.037 0.040 (0.014-0.015) (0.016-0.018) (0.019-0.021) (0.021-0.024) (0.024-0.027) (0.027-0.030) (0.029-0.033) (0.031-0.036) (0.035-0.040) (0.037-0.043) 30tlay 0.012 0.014 0.016 0.018 0.020 0.022 0.024 0.026 0.028 0.030 (0.011-0.013) (0.013-0.015) (0.015-0.017) (0.017-0.019) (0.019-0.021) (0.021-0.023) (0.023-0.025) (0.024-0.027) (0.026-0.030) (0.028-0.032) 45tlay 0.010 0.012 0.014 0.015 0.017 0.018 0.019 0.020 0.022 0.023 (0.010-0.011) (0.011-0.012) (0.013-0.014) (0.014-0.016) (0.016-0.017) (0.017-0.019) (0.018-0.020) (0.019-0.022) (0.021-0.023) (0.022-0.025) 60tlay 0.009 0.011 0.012 0.013 0.014 0.015 0.016 0.017 0.019 0.020 (0.009-0.009) (0.010-0.011) (0.011-0.013) (0.012-0.014) (0.014-0.015) (0.015-0.016) (0.016-0.017) (0.016-0.018) (0.018-0.020) (0.018-0.021) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90 % confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAAAtlas 14 document for more information. Back to Top PF graphical PDS-based intensity -duration -frequency (IDF) curves Latitude: 35.7229", Longitude:-79.4702" 100-000 _ ......:. ........................... . rf ORS C_ C_ G G C_ - - 7, 7, 1., }, 7, 7, y, }, 1.,E E E E E A rh A a � fl u'S O 111 Q OO �"� f+l A r6 V M1 O O O Ln O Duration O rl •i m lG '-I N rn r km 100000 r 10-000 G ZI L+ 1-000 c v G 0.001 1 ' ' ' ' ' ' ' ' a 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NQAA Atlas 14, Volume 2, Version 3 Created (GMT): Thu May 2 22:45:20 2019 Back to Top Average recurrence interval (years) — 1 2 5 10 25 50 100 200 500 1000 Duration — 5-min — 2-day — 10-min — 3-day 15-min — 4-day — 3Dfnin — 7-day — 6D�rnin — 1 0-day — 2fir — 24-day — "r — 30-day — 8-rr — 45-day — 12-hr — 60-day — 24-hr Maps & aerials Small scale terrain � Siler City J. 5ltF.R ❑ zr .YUM J }11.Rp 0.R7 L. ii a 3km mi Large scale terrain l i Winston-Salem • • Durham � Greenshoral Raleigh ' Rocky Mi NORTH CAROLIAA •' 'Charlotte Fayetteville; Je e 1001km ' 1 i,;AL a n,I IT T 11 a ,. Large scale map inston-TalerrvGreensboro Durham oRoky Mr Raleigh Y I+rth Carolina art Otte F W ettevi I l e .r 1001km 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questionsidnoaa.aov Disclaimer Ca�OEESIGN & ENGINEERING, PLLC CLIENT -FOCUSED • COMPREHENSIVE • COST-EFFECTIVE 2537E. LYON STAT/ON RD, STE 102 PO BOX 361 CREEDMOOR, NC 27522 919-625-7368 NCDOT HYDRAULIC. CALCULATIONS: - DRIVEWAY PIPE RUNOFF - DRIVEWAY PIPE SIZING - UGS DISCHARGE RATES AT NORTH FIR AVENUE -OUTFACE (P-5) DISCHARGE RATES AT NORTH FIR AVENUE 8 Hydrology Report Hydraflow Express Extension for AUtodeskS AutoCADO Civil 31DO by Autodesk, Inc. SILER SQUARE - DRIVEWAY PIPE Tuesday, Jun 18 2019 Hydrograph type = Rational Peak discharge (cfs) = 0.396 Storm frequency (yrs) = 10 Time interval (min) = 1 Drainage area (ac) = 0.070 Runoff coeff. (C) = 0.78 Rainfall Inten (in/hr) = 7.246 Tc by User (min) = 5 OF Curve = 2019-05-20 Siler City NC - Siler SRl9cd fad@W = 1.00 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 Runoff Hydrograph 10-yr frequency Hydrograph Volume = 119 (cuft); 0.003 (acft) Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 0 5 10 Time (min) — Runoff Hyd - Qp = 0.40 (cfs) Culvert Report Hydraflow Express Extension for AUtodeskS AutoCADO Civil 31DO by Autodesk, Inc. Tuesday, Jun 18 2019 SILER SQUARE - DRIVEWAY PIPE Invert Elev Dn (ft) = 109.00 Calculations Pipe Length (ft) = 70.00 Qmin (cfs) = 0.40 Slope (%) = 0.36 Qmax (cfs) = 0.40 Invert Elev Up (ft) = 109.25 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 15.0 Shape = Circular Highlighted Span (in) = 15.0 Qtotal (cfs) = 0.40 No. Barrels = 1 Qpipe (cfs) = 0.40 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 0.52 Culvert Entrance = Groove end projecting (C) Veloc Up (ft/s) = 2.35 Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 HGL Dn (ft) = 109.75 HGL Up (ft) = 109.50 Embankment Hw Elev (ft) = 109.58 Top Elevation (ft) = 112.00 Hw/D (ft) = 0.26 Top Width (ft) = 42.00 Flow Regime = Inlet Control Crest Width (ft) = 20.00 Elev (ft) 113.00 112.00 loom 110m SILER SQUARE - DRIVEWAY PIPE Hw Depth (ft) 3.75 2.75 IFNI 0.75 -0.25 1 N.04 i i i i i i i i i i i i i i i i i i i-1.25 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 S0 85 96 CircalarCulvert HGL Embank Reach (ft) 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk@ Civil 3D& 2019 by Autodesk, Inc. v202O PRE-DEV BLDG A -COST-DEV BLDG A PRE-DEV BLDG BPOST-DEV BLDG B r r 5 - BLDG A - UGS ROUTE 6 - BLDG B - UGS ROUTE Legend Hid. Origin Description 1 SCS Runoff PRE-DEV BLDG A 2 SCS Runoff POST-DEV BLDG A 3 SCS Runoff PRE-DEV BLDG B 4 SCS Runoff POST-DEV BLDG B 5 Reservoir BLDG A- UGS ROUTE 6 Reservoir BLDG B - UGS ROUTE Project: 2019-06-17 SILER PRE -POST - INCREASE ONLY.gpw Tuesday, 06 / 18 / 2019 Hydrograph Return Period Recap Hydra w Hydrographs Extension for Autodesk@ Civil 3D@ 2019 by Autodesk, Inc. v2020 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 0.125 0.197 ------- 0.313 0.412 0.549 0.662 ------- PRE-DEV BLDG A 2 SCS Runoff ------ 0.438 0.531 ------- 0.666 0.773 0.917 1.030 ------- POST-DEV BLDG A 3 SCS Runoff ------ 0.238 0.375 ------- 0.594 0.782 1.044 1.257 ------- PRE-DEV BLDG B 4 SCS Runoff ------ 0.833 1.009 ------- 1.265 1.470 1.742 1.957 ------- POST-DEV BLDG B 5 Reservoir 2 0.122 0.142 ------- 0.293 0.702 ------- BLDG A- UGS ROUTE 6 Reservoir 4 0.231 0.303 ------- 0.592 i ------- BLDG B - UGS ROUTE Proj. file: 2019-06-17 SILER PRE -POST - INCREASE ONLY.gpw Tuesday, 06 / 18 / 2019 Hydrograph Summary Repo rtH ydraflow Hydrographs Extension for Autodesk@ Civil 3D@ 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.412 1 718 827 ------ ------ ------ PRE-DEV BLDG A 2 SCS Runoff 0.773 1 717 1,869 ------ ------ ------ POST-DEV BLDG A 3 SCS Runoff 0.782 1 718 1,571 ------ ------ ------ PRE-DEV BLDG B 4 SCS Runoff 1.470 1 717 3,551 ------ ------ ------ POST-DEV BLDG B 5 Reservoir M11 1 722 1,867 2 105.46 493 BLDG A - UGS ROUTE 6 Reservoir WS2 _9% 722 3,550 4 101.51 930 BLDG B - UGS ROUTE 2019-06-17 SILER PRE -POST - INCREASE Tuesday, 06 / 18 / 2019 Hydrograph Summary Repo rtH ydraflow Hydrographs Extension for Autodesk@ Civil 3D@ 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.549 1 718 1,107 ------ ------ ------ PRE-DEV BLDGA 2 SCS Runoff 0.917 1 717 2,228 ------ ------ ------ POST-DEV BLDG A 3 SCS Runoff 1.044 1 718 2,103 ------ ------ ------ PRE-DEV BLDG B 4 SCS Runoff 1.742 1 717 4,233 ------ ------ ------ POST-DEV BLDG B 5 Reservoir �.� 1 721 2,226 2 105.87 551 BLDG A - UGS ROUTE 6 Reservoir 1 720 4,232 4 101.97 995 BLDG B - UGS ROUTE 2019-06-17 SILER PRE -POST - INCREASE Tuesday, 06 / 18 / 2019 Hydrograph Summary Repo rtH ydraflow Hydrographs Extension for Autodesk@ Civil 3D@ 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.662 1 718 1,339 ------ ------ ------ PRE-DEV BLDG A 2 SCS Runoff 1.030 1 717 2,512 ------ ------ ------ POST-DEV BLDG A 3 SCS Runoff 1.257 1 718 2,544 ------ ------ ------ PRE-DEV BLDG B 4 SCS Runoff 1.957 1 717 4,773 ------ ------ ------ POST-DEV BLDG B 5 Reservoir Iowa, 1 719 2,510 2 105.96 557 BLDG A - UGS ROUTE 6 Reservoir 1 718 4,772 4 102.01 1,003 BLDG B - UGS ROUTE 2019-06-17 SILER PRE -POST - INCREASE Tuesday, 06 / 18 / 2019 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodeskg Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 06 / 18 / 2019 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (NIA) 1 63.8568 12.6000 0.8882 -------- 2 73.1817 12.7000 0.8750 -------- 3 0.0000 0.0000 0.0000 -------- 5 79.8313 13.1000 0.8465 -------- 10 77.3185 12.7000 0.8111 -------- 25 64.6079 11.1000 0.7420 -------- 50 58.1851 10.2000 0.6990 -------- 100 50.8258 9.0000 0.6516 -------- File name: 2019-05-20 NOAA IDF - SILER CITY.IDF Intensity = B / (Tc + D)^E Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 5.00 4.00 3.35 2.89 2.55 2.28 2.07 1.89 1.74 1.62 1.51 1.42 2 5.92 4.76 4.00 3.46 3.06 2.74 2.49 2.28 2.11 1.96 1.83 1.72 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.88 5.60 4.74 4.13 3.66 3.30 3.01 2.77 2.56 2.39 2.24 2.11 10 7.52 6.14 5.23 4.57 4.07 3.68 3.36 3.10 2.88 2.69 2.53 2.39 25 8.22 6.72 5.74 5.04 4.51 4.10 3.77 3.49 3.25 3.05 2.88 2.73 50 8.68 7.12 6.10 5.37 4.83 4.40 4.05 3.77 3.53 3.32 3.14 2.98 100 9.10 7.46 6.41 5.66 5.11 4.67 4.32 4.02 3.78 3.57 3.38 3.22 Tc = time in minutes. Values may exceed 60. D HOME\SILER SCHOOL 5-20\CIVIL-18-023\Desian\Stormwater\Hvdraflow\2019-05-20 NOAA PCP - SILER CITY.DCD Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.99 3.61 0.00 4.51 5.23 6.19 6.95 7.74 SCS 6-Hr 2.19 2.65 0.00 3.30 3.79 4.45 4.97 5.49 Huff-1 st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Line Profile (Line 5) - OUTFALL 1 Page 1of1 Line 5 - OUTFALL I El e+ (0) 1 1 v.vv 110.00 106.C-v - - - 106.00 1 v.2.30 102.00 SIP 9G.00 94.00 9D.00 10 20 30 40 50 00 70 00 9D 100 110 120 130 Reach (ft) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q 10 Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 5 5.68 97.50 102.10 0.53 0.92 0.92 98.03 103.02 103.02 10.16 5.01 -1.50 2.75 Project File: No. Lines: 5 Run Date: 6/18/2019 Storm Sewers Line Profile (Line 5) - OUTFALL 1 Page 1of1 Line 5 - OUTFALL I El e+ (ft) 1 1 v.vv 110.00 106.C-v - - - - 106.00 ............ 9G.00 . v v 94.00 10 20 30 40 50 60 70 so 9D 100 110 120 130 req-lfn Reach (ft) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q 25 Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 5 L6.31 97.50 102.10 0.58 0.97 0.97 98.08 103.07 103.07 10.00 5.22 -1.50 2.75 Project File: -- No. Lines: 5 Run Date: 6/18/2019 Storm Sewers Line Profile (Line 5) - OUTFALL 1 Page 1of1 Line 5 - OUTFALL I El e+ (0) 1 1 v.vv 110.00 106.C-v - - - - 106.00 1 v2.30 102.00 ............ vv.v0 -.00 94.00 9D.00 10 20 30 40 50 00 70 00 9D 100 110 120 130 Reach (ft) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q50 Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) i (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 5 6.73 - - 97.50 102.10 0.58 1.00 1.00 98.08 103.10 103.10 10.67 5.36 -1.50 2.75 Project File: FNo. Lines: 5 Run Date: 6/18/2019 Storm Sewers