HomeMy WebLinkAboutSW1190501_NBMS_SUPPLEMENT 7_15_19_7/15/2019SUPPLEMENT-EZ COVER PAGE
LOAD SUPPLEMENT FORMS
PROJECT INFORMATION
1
Project Name
2
Pro ect Area ac
3
Coastal Wetland Area
4
Surface Water Area (a
North Buncombe Middle School
2.506
5 Ils this project High or Low Density? High
6 1 Does this proiect use an off -site SCM? No
COMPLIANCE WITH 02H .1003(
7
Width of vegetated setbacks provided feet
30'
8
Will the vegetated setback remain vegetated?
Yes
9
Ils BUA other that as listed in .1003 4 c-d out of the setback?
no
10
I Is streambank stabilization proposed on this project?
no
NUMBER AND TYPE OF SCMS:
11
Infiltration System
0
12
Bioretention Cell
1
13
Wet Pond
0
14
Stormwater Wetland
0
15
Permeable Pavement
0
16
Sand Filter
0
17
Rainwater Harvesting RWH
0
18
Green Roof
0
19
Level Spreader -Filter Strip LS-FS
0
20
Disconnected Impervious Surface (DIS)
0
21
Treatment Swale
0
22
Dry Pond
0
23
StormFilter
0
24
Silva Cell
0
25
Bay -filter
0
26
1 Filterra
0
LOAD SUPPLEMENT FORMS
DESIGNER CERTIFICATION
27
Name and Title:
Travis Maxwell
28
Organization:
Brooks Engineeering Associates
29
Street address:
17 Arlington Street
30
City, State, Zip:
Asheville, N.C. 28801
31
1Phone numbers :
828-232-1331
32
Email:
tmaxwelKDbrooksea.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or
supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and
that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent
with the information provided here.
0
AIIIII11jj////
CAI?
�V'SSI �Ll
_ = SEAL
025514
'fNGNE�¢�
I
/'/tf 1111111\\i
6�r�
Signature of Designer
� ��1���
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
1
3
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
AREA INFORMATION
Entire Site
1
4
Type of SCM
Bioretention Cell
Bioretention Cell
5
Total BUA in promect (sq ft
545172 sf
69985 sf
6permitting)
New BUA on subdivided lots (subject to
s ft
7permitting)
New BUA outside of subdivided lots (subject to
s
29585 sf
8
Offsite - total area (sq ft
9
Offsite BUA (sq ft
10
Breakdown of new BUA outside subdivided lots:
Parking (sq ft
114729 sf
24626 sf
Sidewalk (sq ft
23888 sf
1004 sf
Roof (sq ft
352996 sf
Roadway s ft
49724 sf
Future (sq ft
Other, please specify in the comment box
below (sq ft
11
New infiltrating permeable pavement on
subdivided lots (sq ft
sf
12
New infiltrating permeable pavement outside of
subdivided lots (sq ft
sf
13permitting)
Exisitng BUA that will remain (not subject to
s ft
531671 sf
40400 sf
14
Existinci BUA that is already permitted (sq ft
15
Existing BUA that will be removed (sq ft
13501 sf
13501 sf
16
Percent BUA
43%
64 0
17
Design storm inches
1 in
1 in
18
IDesign volume of SCM cu ft
1297 cf
1297 cf
19
lCalculation method for design volume
simple
simple
ADDITIONAL INFORMATION
20
Please use this space to provide any additional information about the
drainage area(s):
DRAINAGE AREA INFORMATION
Entire Site
1
4
Type of SCM
5
Total BUA from project (sq ft)
6
1995 rules
SL 2006-246
2008 rules
2017 rules
7
New BUA on subdivided lots (subject to
permitting) (sq ft)
1995 rules
SL 2006-246
2008 rules
2017 rules
New BUA outside of subdivided lots (subject
to permitting) (sf)
1995 rules
SL 2006-246
2008 rules
8
2017 rules
9
Offsite - total area (sq ft)
1995 rules
SL 2006-246
2008 rules
2017 rules
10
Offsite BUA (sq ft)
1995 rules
SL 2006-246
2008 rules
2017 rules
11
IDesign storm (inches)
1995 rules
SL 2006-246
2008 rules
2017 rules
12
Breakdown of new BUA:
Parking (sq ft
Sidewalk (sq ft
Roof (sq ft
Roadway s ft
Future (sq ft
Other, please specify in the comment box
below (sq ft
13
New infiltrating permeable pavement on
subdivided lots (sq ft
14
New infiltrating permeable pavement outside of
subdivided lots (sq ft
15permitting)
Exisitng BUA that will remain (not subject to
s ft
16
Existina BUA that is already permitted (sq ft
17
Existing BUA that will be removed (sq ft
18
Percent BUA
19
Design volume of SCM cu ft
20
Calculation method for design volume
ADDITIONAL INFORMATION
21
Please use this space to provide any additional
information about the drainage area(s):
BIORETENTION CELL
Drainage area number
Design volume of SCM (cu ft)
IGFNFRAI MDC FROM n2H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
71
6
Does the SCM have retaining walls, gabion walls or other engineered side
slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion (10-
year storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the design
volume?
What is the method for dewatering the SCM for maintenance?
Yes
Drawdown Orifice
9
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement complywith General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)?
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
16
1 Does the SCM follow the device specific MDC?
Yes
17
lWas the SCM designed by an NC licensed professional?
Yes
BIORETENTION
CELL MDC FROM 02H .1052
18
SHWT elevation (fmsl)
LOWER THAN
2192
19
Bottom of the bioretention cell (fmsl)
2193.00
20
Ponding depth of the design storm (inches)
12 in
21
Surface area of the bioretention cell (square feet)
3114 sf
22
Design volume of the bioretention cell (cubic feet)
2917 cf
23
Is the bioretention cell used for peak attenuation?
Yes
24
Depth of peak attenuation over planting surface (in)
25
Height of peak attenuation outlet above the planting surface (in)
26
Infiltration rate of the in situ soil (inch/hour)
1 in/hr
27
Diameter of the underdrain pipes (if applicable)
6 in
28
Does the design include Internal Water Storage (IWS)?
Yes
29
if so, elevation of the top of the IWS (fmsl)
2196.5
30
Elevation of the planting surface (fmsl)
2198
31
What type of vegetation will be planted? (grass, trees/shrubs, other)?
Grass
32
Media depth (inches)
24 in
33
Percentage of medium to coarse washed sand by volume
85%
34
Percentage of fines (silt and clay) by volume
10%
35
Percentage of organic matter by volume
5%
36
Type of organic material
mulch
37
Phosphorus Index (P-Index) of media (unitless)
10
38
Will compaction be avoided during construction?
Yes
39
Will cell be maintained to a one inch/hour standard?
Yes
40
Depth of mulch, if applicable (inches)
N/A
41
Type of mulch, if applicable
N/A
42
How many clean out pipes are being installed?
4
43
Type of pretreatment that will be used:
gravel & grass
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
44 bioretention cell(s):
Bioretention 4 9:29 AM 7/15/2019