HomeMy WebLinkAbout310364_Plan of Action_20180921C y Z► ►,& �_Olb 01DO 3 y+ PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 9/16/2018 1. Structure Name/Identifier (ID): Z. Korne a -Korne a Acres 31-364 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 5.01 inches 19.0 inches 14.0 inches 64428 ffz 562242 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 80705 ft3 h. current herd # 2448 certified herd # 2448 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/31/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 80705 ft' 53018 ft3 38480 ft3 214680 gallons 1.46 Ibs/1000 gal. 1134.3 Ibs. PAN II. TOTAL POUNDS -OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Z. Kornegay-Kornegay Acres 31-364 line m = 1134.3 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines1+2+3+4+5+6= ' , 1134.3lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD- DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD- o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 4568 1-Jan Small Grain 1.91 50.00 95.5 Oct -March 45681 2 Small Grain 2.15 50.00 107.5 Oct -March 4568 3 Small Grain 2.16 50.00, 108.0 Oct -March 4568 4 Small Grain 3.58 50.00 179.0 Oct -March 4568 5 Small Grain 2.04 50.00 102.0 Oct -March 4568 6 Small Grain 2.07 50.00 103.5 Oct -March 4568 7 Small Grain 2.92 50.00 146.0 Oct -March 4568 1-Jan Bermuda 1.91 50.00 95.5 March - Oct 4568 2 Bermuda 2.15 50.00 107.5 March - Oct 4568 3 Bermuda 2.16 50.00 108.0 March - Oct 4568 4 Bermuda 3.58 50.00 179.0 March - Oct 4568 5 Bermuda 2.04 50.00 102.0 March - Oct 4568 6 Bermuda 2.07 50.00 103.5 March - Oct 4568 7 Bermuda 2.92 50.00 146.0 March - Oct 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1683.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 1134.3 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 1683.0 lb. PAN y. Overall PAN'balance (w - x) = -549 lb. PAN PoA (30 Day) 2/21/00 Iry Line y must show as a deficit. If line y-does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Waste will be applied agronomically and hydraulically as weather permits. PoA (30 Day) 2/21/00