Loading...
HomeMy WebLinkAbout310385_Plan of Action_20180921;0 16 6 2-0 �P�_ �-Z (-t8 3t,j&.5 PLAN.OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 -DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Earnest Kennedy (Hivari) I FN: 31-385 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 8.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 11.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 49216 Ift2 e. line c/12 x line d x 7.48 gallons/ft3 337458 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 42067.1 ft3 h. current herd # 1276 certified herd #1 1276 actual waste produced = current herd # x line g = 42067 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/1/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 ft3 30172.3 ft3 90058 gallons 1.08 Ibs/1000 gal. 461.7 lbs. PAN PoA (30 Day) 2/21/00 9/19/2018 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Earnest Kennedy (Hillari) line m = 461.7 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 461.7lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN pGRlnn nn NnT I IAT mm nA TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # - p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t TOTAL PAN BALANCE FOR FIELD (lbs.) column r x,s u. application window' 6192 2, H1 Small Grain 2.72 50.00 136.0 Sept. -April 61921 2, H2 Small Grain 2.95 50.00 147.5 Sept. - April 6192 2, H3 Small Grain 4.23 50.00 211.5 Sept. -April 6192 2, H4 Small Grain 1.53 50.00 76.5 Sept. -April 6192 2, H5 Small Grain 2.53 50.00 126.5 Sept. - April 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 698.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 461.7 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 698.0 lb. PAN y. Overall PAN balance (w - x) _ -236 lb. PAN PoA (30 Day) 2/21/00 9/19/2018 "4 PoA (30 Day) 2/21/00 9/19/2018