Loading...
HomeMy WebLinkAbout310122_Plan of Action_20180921, Lo(�5()2031 �-z 1-/e 3l-1zZ PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): E&B Farms Inc. 1 FN: 31-122 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm &,structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 9/16/2018 12.0 inches 19.0 inches 7.0 inches 83496 ftZ 364321 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 121352J ft3 h. current herd # 3672 certified herd #1 3672 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/24/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 121352 ft'i Oft3 50750 ft3 214554 gallons 1.80 Ibs/1000 gal. 1042.0 Ibs. PAN PoA (30 Day) 2/21/00 9/19/2018 .i PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): E&B Farms Inc.(2) I FN: 31-122 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 9/16/2018 12.0 inches 19.0 inches 7.0 inches 105716 ft2 461274 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design - 180 days g. volume of waste produced according to structural design 121058.2 ft3 h. current herd # 3672 certified herd # 3672 actual waste produced = current herd # x line g = 121058 ft3 certified herd # i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design 68750 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 236628 gallons 4. Total PAN to be land applied during draw down period I. current waste) analysis dated 7/24/2018 1.43 Ibs/1000 gal. m. ((lines e + k)/1000) x line 1 = 998.0 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 9/19/2018 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES, 30 DAY DRAW DOWN PERIOD (.-TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 9/16/2018 1. Structure Name/Identifier (ID): E&B Farms Inc. 3 FN: 31-122 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker I 13.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 6.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 109512 ft2 e. line c/12 x line d x 7.48 gallons/ft3 409575 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 121058.2 ft3 h. current herd # 3672 certified herd # 3672 actual waste produced = current herd # x line g = 121058 ft'i certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 66220 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 233473 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/24/2018 1.19 Ibs/1000 gal. m. ((lines e + k)/1000) x line 1 = 765.2 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 9/19/2018 r m II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: E&B Farms Inc.(1) line m = 1042.0 lb PAN 2. Structure ID: E&B Farms Inc. (2) 1. line m = 998.0 lb PAN 3. Structure ID: E&B Farms Inc. (3) line m = 765.2 lbPAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6= 2805.2 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PFRInn_ Inn NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window 2900 P1 Small Grain 3.04 50.00 152.0 Oct -March P2 Small Grain 4.30 50.00 215.0 Oct -March P3 Small Grain' 6.72 50.00 336.0 Oct -March P5 Small Grain 5.05 50.00 252.5 Oct -March P6 Small Grain 2.49 50.00 124.5 Oct -March P7 Small Grain 4.34 50.00 217.0 Oct -March P9 Small Grain 2.43 50.00 121.5 Oct -March P11 Small Grain 4.30 50.00 215.0 Oct -March P16 Small Grain 4.02 50.00 201.0 Oct -March P17 Small Grain 3.97 50.00 198.5 Oct -March P18 Small Grain 4.00 50.00 200.0 Oct -March P19 Small Grain 2.95 50.00 147.5 Oct -March P20 Small Grain 3.15 50.00 157.5 Oct -March 2900 P1 Bermuda Hay 3.04 100'.00 304.0 March - Sept P2 Bermuda Hay 4.30 100.00 430.0 March - Sept P3 Bermuda Hay 6.72 100.00 672.0 March - Sept P51 Bermuda Hay 5.05 100.00 505.0 March - Sept P6 Bermuda Hay 2.49 100.00 249.0 March - Sept El P7 Bermuda Hay 4.34 100.00 434.0 March - Sept P9 Bermuda Hay 2.43 100.00 243.0 March - Sept 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 5375.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN 'BALANCE w. Total PAN to be land applied (line n from section II) = 2805.2 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 5375.0 lb. PAN y. Overall PAN balance (w - x) = -2570 lb. PAN PoA (30 Day) 2/21/00 9/19/2018 Line y must -show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Waste will be applied agronomically and hydraulically as weather permits. PoA (30 Day).2/21/00 9/19/2018