HomeMy WebLinkAbout310519_Plan of Action_20180921y
�01 ,09.039-
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 9/16/2018
1: Structure Name/Identifier (ID): E&B Farms Inc. 4 FN: 31-519
2. Current liquid volume in 25 yr./24,hr. storm storage & structural freeboard
a. current liquid level according to marker 12.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 7.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 16066.4 ff,
e. line c/12 x line d x 7.48 gallons/ft3 70103 gallons
3. Projected volume of waste liquid produced' during draw down period
f. temporary storage period according to structural design
180 days
- g. volume of waste produced according to structural design
39561 ft3
h. current herd # 1200 certified herd #1 1200
actual waste produced = current herd # x line g =
39561 ft'i
certified herd #
i. volume of wash water• according to structural design
Oft3 .
J. excess rainfall over evaporation according to design
25989 ft3
k. (lines h + i + j) x 7.48 x 30 days/line f=
81719 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/24/2018
0.97 Ibs/1000 gal.
m. ((lines e + k)/1000) x line 1 =
147.3 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. -
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00 9/19/2018
II. TOTAL
POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25
YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1..Structure
ID: E&B Farms Inc.(4)
line m = 147.3 lb PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID:
line m =
lb PAN
1
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n.lines 1+2+3+4+5+6= - 147.3lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
pFlzlnn nn KIM I IST FIFI nS TO WHICH PAN CANNOT RF APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t TOTAL PAN, -
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
Brinkley
1
Fescue- Hay
3.51
100.00
351.0
Au . - Jul
Brinkley_ I
p2
Fescue- Hay
3.23
100.00
323.0
Aug. - Jul
Brinkley
3a
Fescue- Hay
2.61
100.00
261.0
Aug. - Jul
Brinkley
3b
Fescue- Hay
1.14
100.00
114.0
Aug. - Jul
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 1049.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 147.3 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 1049.0 lb. PAN
y. Overall PAN balance (w - x) _ -902 lb. PAN
r •
PoA (30 Day) 2/21/00
9/19/2018
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
Waste will be applied agronomically and hydraulically as weather permits.
1
r
r
0
PoA (30 Day) 2/21 /00 9/19/2018