Loading...
HomeMy WebLinkAbout310519_Plan of Action_20180921y �01 ,09.039- PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 9/16/2018 1: Structure Name/Identifier (ID): E&B Farms Inc. 4 FN: 31-519 2. Current liquid volume in 25 yr./24,hr. storm storage & structural freeboard a. current liquid level according to marker 12.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 7.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 16066.4 ff, e. line c/12 x line d x 7.48 gallons/ft3 70103 gallons 3. Projected volume of waste liquid produced' during draw down period f. temporary storage period according to structural design 180 days - g. volume of waste produced according to structural design 39561 ft3 h. current herd # 1200 certified herd #1 1200 actual waste produced = current herd # x line g = 39561 ft'i certified herd # i. volume of wash water• according to structural design Oft3 . J. excess rainfall over evaporation according to design 25989 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 81719 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/24/2018 0.97 Ibs/1000 gal. m. ((lines e + k)/1000) x line 1 = 147.3 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. - (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 9/19/2018 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1..Structure ID: E&B Farms Inc.(4) line m = 147.3 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 1 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= - 147.3lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN pFlzlnn nn KIM I IST FIFI nS TO WHICH PAN CANNOT RF APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t TOTAL PAN, - BALANCE FOR FIELD (lbs.) column r x s u. application window' Brinkley 1 Fescue- Hay 3.51 100.00 351.0 Au . - Jul Brinkley_ I p2 Fescue- Hay 3.23 100.00 323.0 Aug. - Jul Brinkley 3a Fescue- Hay 2.61 100.00 261.0 Aug. - Jul Brinkley 3b Fescue- Hay 1.14 100.00 114.0 Aug. - Jul 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1049.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 147.3 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 1049.0 lb. PAN y. Overall PAN balance (w - x) _ -902 lb. PAN r • PoA (30 Day) 2/21/00 9/19/2018 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Waste will be applied agronomically and hydraulically as weather permits. 1 r r 0 PoA (30 Day) 2/21 /00 9/19/2018