August 9, 1993
IN MI-L1 HW-h { iv
Regulatory Branch
Action ID No. 199301747 and State Permit No. 52-93
Mr. John Parker
Division of Coastal Management
North Carolina Department of Environment,
Health and Natural Resources
Post Office Box 27687
Raleigh, North Carolina 27611-7687
Dear Mr. Parker:
Reference the application of Mr. Robert F. Youngblood for a modification
to his Department of the Army (DA) permit which authorizes the construction of
three docks in a manmade boat basin off Bogue Sound, Asbury Beach Subdivison,
Atlantic Beach,rrteret County,"?North Carolina. The proposed modification
involves dock and pier reconfiguration, installation of pilings, construction
of a wooden walkway and maintenance of a basin.
We have reviewed the proposed modification, as presented by Mr. David
Noble's memorandum of July 26, 1993, and we recommend that the following
conditions be included in the State authorization:
a. All work authorized by this permit must be performed in strict
compliance with the permit plans.
b. All excavated materials will be confined landward of the mean high
water (MHW) elevation contour and any regularly or irregularly flooded
vegetated wetlands.
c. No vegetated wetlands will be excavated or filled.
d. Excavation will not exceed three (3) feet below the elevation of mean
low water (MLW).
e. The temporary placement or double handling of excavated or fill
materials within waters or vegetated wetlands is not authorized.
f. No attempt will be made by the permittee to prevent the full and free
use by the public of all navigable waters at or adjacent to the authorized
work. Use of the permitted activity must not interfere with the public's
right to free navigation on all navigable waters of the United States.
AUG 18 10
11 , . _
-2-
g. The permittee will maintain the authorized work in good condition and
in conformance with the terms and conditions of this permit. The permittee is
not relieved of this requirement if he abandons the permitted activity without
having it transferred to a third party.
h. The activity will be conducted in such a manner as to prevent a
significant increase in turbidity outside the area of construction or
construction-related discharge. Increases such that the turbidity in the
waterbody is 25 NTU's or less are not considered significant.
Questions or comments may be addressed to Mr. Scott McLendon, Wilmington
Field Office, Regulatory Branch, telephone (919) 251-4725.
Sincerely,
Copies Furnished:
_1Mr . John Dorney
Water Quality Section
Division of Environmental
Management
North Carolina Department of
Environment, Health and
Natural Resources
Post Office Box 27687
Raleigh, North Carolina 27611-7687
G. Wayne Wright
Chief, Regulatory Branch
Mr. Charles Jones
Morehead City Regional Office
North Carolina Division of
Coastal Management
Post Office Box 769
Morehead City, North Carolina 28557
d STATE 4
? ` co
RECEIVED
MAR 22 1993
Wilmington Regional l1TICA5
DEM
State of North Carolina
Department of Environment, Health, and Natural Resources
512 North Salisbury Street • Raleigh, North Carolina 27604
James B. Hunt, Jr., Governor
March 17, 1993
MEMORANDUM:
TO:
FROM:
SUBJECT:
Applicant:
Project Location:
Proposed Project:
Mr. A. Preston Howard, P.E., Director
Division of Environmental Management
John R. Parker, Jr.
Major Permits Processing Coordinator
Jonathan B. Howes, Secretary
MAR 1995
DIWSIO OF
COASTAL NI;A?AGEU
CAMA/DREDGE & FILL Permit Application Review
Robert Youngblood (Asbury Beach Subdivision)
on a man-made canal off Bogue Sound, on E. Fort Macon Road, in
Atlantic Beach, Carteret County
to construct 3 additional docks
Please indicate below your agency': position or viewpoint on the proposed project and return
this form by April 7, 1993. If you have any questions regarding the proposed project, please
contact David Noble at 919/726-7021. When appropriate, in-depth comments with
supporting data is requested.
REPLY: V This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
SIGNED DATE 0 oh3_'
P.O. ox 27687, Raleigh, North C60rtunity 27611-7687 Telephone 919-733-4984 Fax # 919-733-0513
An Equal Affirmative Action Employer
?P? 35
aka
To: John Dorney
Planning Branch
DIVISION OF ENVIRONMENTAL MANAGEMENT
CAMA MAJOR PERMIT APPLICATION REVIEW
REGIONAL OFFICE STAFF REPORT AND RECOMMENDATIONS
REVIEWER:
WQ SUPERVISOR:
DATE:
GREGSON
ADKINS
April 6, 1993
WETLAND INFORMATION FOR CENTRAL OFFICE TRACKING
PERMIT YR: 93 PERMIT NO.: 93235 COUNTY: Carteret
PROJECT NAME: Robert Youngblood
PROJECT TYPE: Docks PERMIT TYPE: CAMA
COE #: N/A DOT#: N/A
RCD FROM CDA: DCM DATE FROM CDA: March 22, 1993
REG OFFICE: WiRO RIVER AND SUB BASIN#: 030
*STREAM OR ADJACENT WATER BODY: Bogue Sound
CLASS: SA STREAM INDEX #: 20-36-(8.5)
*OPEN OR CLOSED: Closed
WL IMPACT: N/A WL TYPE: N/A
WL REQUESTED: N/A WL ACR EST: N/A
HYDRO CNECT?: N/A WL SCORE: N/A
MITIGATION: N/A MITIGATION TYPE: N/A
WETLANDS GROUP
WATER QUALITY SECTION
MITIGATION SIZE: N/A RATING SHEET ATTACHED?: N/A
RECOMMENDATION: ISSUE
STORMWATER PLAN REQ'D:
IF YES, DATE APPROVED:
PROJECT DESCRIPTION: The applicant proposes to construct three
additional docks.
WATER QUALITY CERT. (401)
CERT. REQ'D: No
IF YES, TYPE:
SEWAGE DISPOSAL
TYPE OF DISPOSAL PROPOSED:
TO BE PERMITTED BY: N/A
IF BY DEM, IS SITE AVAILABLE
N/A
AND PERMIT ISSUANCE PROBABLE: N/A
WATER/WETLAND FILL
AREA OF FILL - WATER: N/A WETLAND: N/A
IS FILL ELIMINATING A SIGNIFICANT USE? N/A
DREDGING
IS DREDGING ACTIVITY EXPECTED TO CAUSE A SIGNIFICANT LOSS
OF RESOURCE? N/A
IS SPOIL DISPOSAL ADEQUATELY ADDRESSED? N/A
MARINA
ARE THE FOLLOWING ADEQUATELY ADDRESSED?
SEWAGE DISPOSAL: N/A MARINA SERVICES: N/A
OXYGEN IN BASIN: N/A CLOSURE OF SHELLFISHING WATERS: N/A
(ATTACH A MARINA USE ATTAINABILITY EVAL.)
93235.Apr
Page Two
RECOMMENDED CONDITIONS OR PERMIT RESTRICTIONS: That the project
be done in such a manner so as to not cause turbidity outside the
immediate construction area to exceed 25 NTU.
cc: Central Files
Wilmington Regional Office Files
DCM-David Noble
John Parker
t
r DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Robert Youngblood (Asbury Beach Subdivision)
2. LOCATION OF PROJECT SITE: E. Fort Macon Rd., Bogue Sound, Atlantic Beach, Carteret Co.
Photo Index - 1989: 158-14 @ 0-10 1984: 34-1472 @ M-14
State Plane Coordinates - X: 2688200 Y: 353100
3. INVESTIGATION TYPE: CAMA (ONLY)
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 3/93
Was Applicant Present - NO
5. PROCESSING PROCEDURE: Application Received - March 4, 1993
Office - Morehead City
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Town of Atlantic Beach
Land Classification From LUP - Conservation
(B) AEC(s) Involved: PT, EW
(C) Water Dependent: YES
(D) Intended Use: Private
(E) Wastewater Treatment: Existing - N/A
Planned - N/A
(F) Type of Structures: Existing - Single-family homes/community boat basin
Planned - 3 additional docks
(G) Estimated Annual Rate of Erosion: -0-
Source - bulkheaded
7. HABITAT DESCRIPTION: [AREA]
DREDGED FILLED OTHER
(A) Vegetated Wetlands
NONE
(B) Non-Vegetated Wetlands 414 sq. ft.
Docks - Boat Basin
(C) Other
NONE
(D) Total Area Disturbed: 414 sq. ft.
(E) Primary Nursery Area: NO
(F) Water Classification: 'SA' Open: NO
8. PROJECT SUMMARY: The applicant proposes to construct 3 additional docks in. the Asbury Beach
Subdivision boat basin.
FIELD INVESTIGATION REPORT:
ROBERT YOUNGBLOOD (ASBURY BEACH SUBDIVISION)
PAGE #2
9. NARRATIVE DESCRIPTION: The applicant's project, known as Asbury Beach
Subdivision, is located on a man-made canal, off Bogue Sound, on E. Fort Macon
Road, in Atlantic Beach, Carteret County.
The applicant received CAMA Major Permit #53-88 in 1988. The applicant dredged
an existing canal to a water depth of -3'/s' MLW and constructed 7 docks. The
applicant originally received a permit for the construction of 10 docks, but, the permit
has subsequently expired. The applicant proposes to construct the 3 previously
permitted docks under this permit application. This will bring the total slips to ten
(10). The 3 proposed docks are 6' x 23' and will serve residents of the subdivision.
10. ANTICIPATED IMPACTS: The proposed docks will occupy 414 sq. ft. of Public
Trust Waters in a man-made boat basin.
The waters of the canal and basin are classified as 'SA' by the Division of
Environmental Management and are closed to shellfishing by the Division of
Environmental Health and Division of Marine Fisheries.
PREPARED BY: W. DAVID NOBLE
DATE: March 17, 1993
Please type or print. Carefully describe all anticipated
development activities, including construction, excava-
tion, filling, paving, land clearing, and stormwater con-
trol. If the requested information is not relevant to your
project, write N/A (not applicable). Items 1-4 and 8-9
must be completed for all projects.
1 APPLICANT
a. Name Robert F. Youngblood
Address P O Box 398
City Atlantic Beaclltate NC
Zip 28512 Day phone 247-4326
X Landowner or Authorized agent
b. Project name (if any) Asbury Beach Subdiv.
c. If the applicant is not the landowner, also give the
owner's name and address.
If you plan to build a marina, also complete and
attach Form DCM-MP-2.
b. Is the proposed activity maintenance of an
existing project, new work, or both?
naw wnrk in existing project
c. Will the project be for community, private, or
commercial use?
private
d. Describe the planned use of the project.
boating facilities
4 LAND AND WATER
CHARACTERISTICS
a. Size of entire tract 15 acres
b. Size of individual lot(s) 50x150
c. Elevation of tract above mean sea level or
National Geodetic Vertical Datum
2 LOCATION OF PROPOSED 11611-811
PROJECT
a. Street address or secondary road number
Fort Macon Rd, Atlantic Beach
b. City, town, community, or landmark
Atlantic Beach
c. County Carteret
d. Is proposed work within city limits or planning
jurisdiction? yes
e. Name of body of water nearest project
Bogue Sound
3 DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
d. Soil type(s) and texture(s) of tract
sand & some mud
e. Vegetation on tract few trees & marsh
f. Man-made features now on tract houses, bulkhead
canal & piers
g. What is the CAMA Land Use Plan Classification of
the site? (Consult the local land use plan.)
Conservation Transitional
x Developed Community
Rural Other
h. How is the tract zoned by local govemment?
RAl
i. How areadjacent waters classified?
SPA
a. Describe all development activities you propose (for j. Has a professional archaeological survey been
example, building a home, motel, marina, bulkhead, carried out for the tract? No If so, by whom?
or pier). B u i l d 3 piers
3/91
5 UPLAND DEVELOPMENT
Complete this section if the project includes any land
development.
a. Type and number of buildings, facilities, or
structures proposed N/A
b. Number of lots or parcels
N/A
c. Density (Give the number of residential units and the
units per acre.) N/A
m. Water supply source
n. If the project is oceanfront development, describe
the steps that will be taken to maintain established
public beach accessways or provide new access.
N/A
d. Size of area to be graded or disturbed o
N/A
e.
If the proposed project will disturb more than one
acre of land, the Division of Land Resources must
receive an erosion and sedimentation control plan at
least 30 days before land disturbing activity begins.
If applicable, has a sedimentation and erosion
control plan been submitted to the Division of Land
Resources? N/A
f. Give the percentage of the tract within 75 feet of
mean high water to be covered by impermeable
surfaces, such as pavement, buildings, rooftops.
N/A
g. List the materials, such as marl, paver stone, asphalt,
or N concrete, to be used for paved surfaces.
h. If applicable, has a stormwater management plan
been submitted to the Division of Environmental
Management? N/A
i. Describe proposed sewage disposal and/or waste
water treatment facilities.
N/A
j. Hffe/Pese facilities received state or local approval?
k. Describe existing sting treatment facilities.
1. Describe location and type of discharges to waters of
the state (for example, surface runoff, sanitary
wastewater, industrial/commercial effluent, "wash
down"). N/A
6 EXCAVATION AND FILL
INFORMATION
a. Describe below the purpose of proposed excavation
or fill activities (excluding bulkheads, which are
covered in Section 7).
Length Width Depth
Access channel
(MLW) or (NWL)
Boat basin
Other (break-
water, iLer,
boat ramp,
rock jetty)
Fill placed in
wetland or below
MHW
Upland fill
areas
b. Amount of material to be excavated from below
water level in cubic yards N/A
c. Type of material
N/A
d. Does the area to be excavated include marshland,
swamps,ro?oother wetlands?
e. High ground excavation, in cubic yards
N/A
If the project is on the oceanfront, what will be the
elevation above mean sea level of the first habitable
floor? N/A
2 3/91
f. Dimensions of spoil disposal area c. Shoreline erosion during preceding 12 months, in
` N/A feet
g. Location of spoil disposal area N/A
h. Do you claim title to the disposal area? N /A
If not, attach a letter granting permission from the
owner.
i.
Will a disposal area be available for future
maintenance?
If so, where?
j. Does the disposal area include any marshland,
swamps, or water areas?
N/A
k. Will the fill material be placed below mean high
water? N/A
1. Amount of fill in cubic yards N/A
m. Type of fill material
N/A
n. Source of fill material N/A
o. Will fill material be placed on marsh or other
wetlands? N/A
p. Dimensions of the wetland to be filled
N/A
q. How will excavated or fill material be kept on site
and ?rAosion controlled?
r. What type of construction equipment will be used
(for example, dragline, backhoe, or hydraulic
dredge)? N/A
s. Will wetlands be crossed in transporting equipment
to project site? n r) If yes, explain steps that will
be taken to lessen environmental impacts.
NIA
7 SHORELINE STABILIZATION
a. Length of bulkhead or riprap N/A
b. Average distance waterw?rd of mean high water or
normal water level N, A
d. Type of bulkhead material NIA
e. Amount of fill, in cubic yards, to be placed below
mean high water N / A
f. Type of fill material
N/A
8 ADDITIONAL INFORMATION
In addition to the completed application form, the follow-
ing items must be submitted:
A copy of the deed (with state application only) or other
instrument under which the applicant claims title to the
affected property. If the applicant is not claiming to be
the owner of said property, then forward a copy of the
deed or other instrument under which the owner claims
title, plus written permission from the owner to carry out
the project.
An accurate work plat (including plan view and cross
sectional drawings) drawn to scale in black ink on an 8
1/2 x 11 white paper. (Refer to Coastal Resources
Commission Rule 7J.0203 for a detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if 18 high
quality copies are provided by applicant. (Contact the
U.S. Army Corps of Engineers regarding that agency's
use of larger drawings.) A site or location map is a part
of plat requirements and it must be sufficiently detailed
to guide agency personnel unfamiliar with the area to the
site. Include county road (SR) numbers, landmarks, and
the like.
A stormwater management plan, if applicable, that
may have been developed in consultation with the
Division of Environmental Management.
A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners. These
individuals have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management and should be advised by the applicant of
that opportunity.
3/91 3
I
Name Deacon Jones
Address P O Box 2280
Smithfield, N C 27577
Name James A. Moss
Address 5716 Louisburg Rd
Raleigh, N C 27604
Name Donald Bryant
Address P O Box
Jackson, N C 27845
A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
pennittee, and issuing dates.
State Permit No. 53-88 3/8/88
Modification to permit - File
No. CESAW-C087-N-016 9 7
A check for $250 made payable to the Department of
Environment , Health, and Natural Resources to cover
the costs of processing the application.
A signed AEC hazard notice for projects in oceanfront
and inlet areas.
A statement on the use of public funds. If the project
involves the expenditure of public funds, attach a state-
ment documenting compliance with the North Carolina
Environmental Policy Act (N.C.G.S. 113A-1 to 10).
9 CERTIFICATION AND PERMISSION j
TO ENTER ON LAND
Any permit issued in response to this application will
allow only the development described in the application.
The project will be subject to conditions and restrictions
contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's ap-
proved Coastal Management Program and will be con-
ducted in a manner consistent with such program.
I further certify that I am authorized to grant, and do in
fact, grant permission to representatives of state and
federal review agencies to enter on the aforementioned
lands in connection with evaluating information related
to this permit application and follow-up monitoring of
project.
This eise 1day of March 19 9 3
x b?-? ?? ; ?rAf?1
Landowner or Au ??d agent
4 3/91
3•
MARSH
r
`a
3`
? I
'
tv
WT)
L LI
?..r w
?j
.? I
C-CL
? Q
1
1-+I7)9 4041
t4 m_..
I -?
I
i DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Robert Youngblood (Asbury Beach Subdivision)
2. LOCATION OF PROJECT SITE: E. Fort Macon Rd., Bogue Sound, Atlantic Beach, Carteret Co.
Photo Index - 1989: 158-14 @ 0-10 1984: 34-1472 @ M-14
State Plane Coordinates - X: 2688200 Y: 353100
3. INVESTIGATION TYPE: CAMA (ONLY)
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 3/93
Was Applicant Present - NO
5. PROCESSING PROCEDURE: Application Received - March 4, 1993
Office - Morehead City
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Town of Atlantic Beach
Land Classification From LUP - Conservation
(B) AEC(s) Involved: PT, EW
(C) Water Dependent: YES
(D) Intended Use: Private
(E) Wastewater Treatment: Existing - N/A
Planned - N/A
(F) Type of Structures: Existing - Single-family homes/community boat basin
Planned - 3 additional docks
(G) Estimated Annual Rate of Erosion: -0-
Source - bulkheaded
7. HABITAT DESCRIPTION: [AREA]
DREDGED FILLED OTHER
(A) Vegetated Wetlands
NONE
(B) Non-Vegetated Wetlands 414 sq. ft.
Docks - Boat Basin
(C) Other
NONE
(D) Total Area Disturbed: 414 sq. ft.
(E) Primary Nursery Area: NO
(F) Water Classification: 'SA' Open: NO
8. PROJECT SUMMARY: The applicant proposes to construct 3 additional docks in the Asbury Beach
Subdivision boat basin.
FIELD INVESTIGATION REPORT:
ROBERT YOUNGBLOOD (ASBURY BEACH SUBDIVISION)
PAGE #2
9. NARRATIVE DESCRIPTION: The applicant's project, known as Asbury Beach
Subdivision, is located on a man-made canal, off Bogue Sound, on E. Fort Macon
Road, in Atlantic Beach, Carteret County.
The applicant received CAMA Major Permit #53-88 in 1988. The applicant dredged
an existing canal to a water depth of -31h' MLW and constructed 7 docks. The
applicant originally received a permit for the construction of 10 docks, but, the permit
has subsequently expired. The applicant proposes to construct the 3 previously
permitted docks under this permit application. This will bring the total slips to ten
(10). The 3 proposed docks are 6' x 23' and will serve residents of the subdivision.
10. ANTICIPATED IMPACTS: The proposed docks will occupy 414 sq. ft. of Public
Trust Waters in a man-made boat basin.
The waters of the canal and basin are classified as 'SA' by the Division of
Environmental Management and are closed to shellfishing by the Division of
Environmental Health and Division of Marine Fisheries.
PREPARED BY: W. DAVID NOBLE
DATE: March 17, 1993
Please type or print. Carefully describe all anticipated
development activities, including construction, excava-
tion, filling, paving, land clearing, and stormwater con-
trol. If the requested information is not relevant to your
project, write N/A (not applicable). Items 1-4 and 8-9
must be completed for all projects.
1 APPLICANT
a. Name Robert F. Youngblood
Address P O Box 398
City Atlantic BeaclState NC
Zip 28512 Day phone
247-4326
X Landowner or Authorized agent
b. Project name (if any) Asbury Beach Subdiv.
c. If the applicant is not the landowner, also give the
owner's name and address.
If you plan to build a marina, also complete and
attach Form DCM-MP-2.
b. Is the proposed activity maintenance of an
existing project, new work, or both?
nPw work in xi nca project
c. Will the project be for community, private, or
commercial use?
private
d. Describe the planned use of the project.
boating facilities
4 LAND AND WATER
CHARACTERISTICS
a. Size of entire tract 15 acres
2 LOCATION OF PROPOSED
PROJECT
a. Street address or secondary road number
Fort Macon Rd, Atlantic Beach
b. City, town, community, or landmark
Atlantic Beach
b. Size of individual lot(s) 50x150
c. Elevation of tract above mean sea level or
National Geodetic Vertical Datum
1'6"-8"
d. Soil type(s) and texture(s) of tract
sand & some mud
e. Vegetation on tract few trees & marsh
f. Man-made features now on tract -houses, bulkhead
canal & iers
What is the LAMA Land Use Plan Classification of
the site? (Consult the local land use plan.)
c. County Carteret 9.
d. Is proposed work within city limits or planning
jurisdiction? yes
e. Name of body of water nearest project
Bogue Sound
3 DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
Conservation Transitional
x Developed Community
Rural Other
h. How is the tract zoned by local government?
RA1
i. How are adjacent waters classified?
s,A
a. Describe all development activities you propose (for j. Has a professional archaeological survey been
example, building a home, motel, marina, bulkhead, carried out for the tract? No If so, by whom?
or pier). Build 3 piers
3/91 1
r ?
5 UPLAND DEVELOPMENT
Complete this section if the project includes any land
development.
a. Type and number of buildings, facilities, or
structuresproposed N/A
b. Number of lots or parcels N/A
c. Density (Give the number of residential units and the
units per acre.) N/A
d. Size of area to be graded or disturbed
N/A
e. If the proposed project will disturb more than one
acre of land, the Division of Land Resources must
receive an erosion and sedimentation control plan at
least 30 days before land disturbing activity begins.
If applicable, has a sedimentation and erosion
control plan been submitted to the Division of Land
Resources? N/A
f. Give the percentage of the tract within 75 feet of
mean high water to be covered by impermeable
surfaces, such as pavement, buildings, rooftops.
N/A
g. List the materials, such as marl, paver stone, asphalt,
or N co . rrete, to be used for paved surfaces.
h. If applicable, has a stormwater management plan
been submitted to the Division of Environmental
Management? N/A
i. Describe proposed sewage disposal and/or waste
water treatment facilities.
N/A
j. Hffe/ these facilities received state or local approval?
k. Describe existing treatment facilities.
1. Describe location and type of discharges to waters of
the state (for example, surface runoff, sanitary
wastewater, industrial/commercial effluent, "wash
down"). N/A
m. Water supply source
n. If the project is oceanfront development, describe
the steps that will be taken to maintain established
public beach accessways or provide new access.
N/A
o. If the project is on the oceanfront, what will be the
elevation above mean sea level of the first habitable
floor? N/A
6 EXCAVATION AND FILL
INFORMATION
a. Describe below the purpose of proposed excavation
or fill activities (excluding bulkheads, which are
covered in Section 7).
Length Width Depth
Access channel
(MLW) or (NWL)
Boat basin
Other (break-
water, pier,
boat ramp,
rock jetty)
Fill placed in
wetland or below
MHW
Upland fill
areas
b. Amount of material to be excavated from below
water level in cubic yards N/A
c. Type of material
N/A
d. Does the area to be excavated include marshland,
swamps,N or other wetlands?
e. High ground excavation, in cubic yards
N/A
2 3/91
r
f. Dimensions of spoil disposal area c. Shoreline erosion during preceding 12 months, in
N/A feet
g. Location of spoil disposal area N/A
h. Do you claim title to the disposal area? N/A
If not, attach a letter granting permission from the
owner.
d. Type of bulkhead material N/A
e. Amount of fill, in cubic yards, to be placed below
mean high water N / A
f. Type of fill material
N/A
i. Will a disposal area be available for future
maintenance? N/A
If so, where? 8 ADDITIONAL INFORMATION
j. Does the disposal area include any marshland,
swamps, or water areas?
N/A
In addition to the completed application form, the follow-
ing items must be submitted:
k. Will the fill material be placed below mean high
water? N/A
1. Amount of fill in cubic yards N/A
m. Type of fill material N/A
n. Source of fill material N/A
o. Will fill material blaced on marsh or other
wetlands? N/A
p. Dimensions of the wetland to be filled
N/A
q. How will excavated or fill material be kept on site
arW75psion controlled?
T. What type of construction equipment will be used
(for example, dragline, backhoe, or hydraulic
dredge)? N/A
s. Will wetlands be crossed in transporting equipment
to project site? gyp- If yes, explain steps that will
be taken to lessen environmental impacts.
N/A
7 SHORELINE STABILIZATION
a. Length of bulkhead or riprap N/A
b. Average distance waterwsrd of mean high water or
normal water level N j A
A copy of the deed (with state application only) or other
instrument under which the applicant claims title to the
affected property. If the applicant is not claiming to be
the owner of said property, then forward a copy of the
deed or other instrument under which the owner claims
title, plus written permission from the owner to carry out
the project.
An accurate work plat (including plan view and cross
sectional drawings) drawn to scale in black ink on an 8
1/2 x 11 white paper. (Refer to Coastal Resources
Commission Rule 7J.0203 for a detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if 18 high
quality copies are provided by applicant. (Contact the
U.S. Army Corps of Engineers regarding that agency's
use of larger drawings.) A site or location map is a part
of plat requirements and it must be sufficiently detailed
to guide agency personnel unfamiliar with the area to the
site. Include county road (SR) numbers, landmarks, and
the like.
A stormwater management plan, if applicable, that
may have been developed in consultation with the
Division of Environmental Management.
A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners. These
individuals have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management and should be advised by the applicant of
that opportunity.
3/'91 3
r
Name Deacon Jones
Address P O Box 2280
Smithfield, N C 27577
Name James A. Moss
Address 5716 Louisburg Rd
Raleigh, N C 27604
Name
Donald Bryant
Address P O Box
Jackson, N C 27845
A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
permittee, and issuing dates.
State Permit No. 53-88 3/8/88
Modification to permit - File
No. CESAW-C087-N-016 9/7/90
A check for $250 made payable to the Department of
Environment , Health, and Natural Resources to cover
the costs of processing the application.
A signed AEC hazard notice for projects in oceanfront
and inlet areas.
A statement on the use of public funds. If the project
involves the expenditure of public funds, attach a state-
ment documenting compliance with the North Carolina
Environmental Policy Act (N.C.G.S. 113A-1 to 10).
9 CERTIFICATION AND PERMISSION
TO ENTER ON LAND
Any permit issued in response to this application will
allow only the development described in the application.
The project will be subject to conditions and restrictions
contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's ap-
proved Coastal Management Program and will be con-
ducted in a manner consistent with such program.
I further certify that I am authorized to grant, and do in
fact, grant permission to representatives of state and
federal review agencies to enter on the aforementioned
lands in connection with evaluating information related
to this permit application and follow-up monitoring of
project.
ThiVise 1 day of March 19 9 3
Landowner or Au d agent
4 3/91
j.
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Robert Youngblood (Asbury Beach Subdivision)
2. LOCATION OF PROJECT SITE: E. Fort Macon Rd., Bogue Sound, Atlantic Beach, Carteret Co.
Photo Index - 1989: 158-14 @ 0-10 1984: 34-1472 @ M-14
State Plane Coordinates - X: 2688200 Y: 353100 7GR_
3. INVESTIGATION TYPE: CAMA (ONLY) MAR 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 3/93
Was Applicant Present - NO WETLA.. oCPTi(1Af
5. PROCESSING PROCEDURE: Application Received - March 4, 1993
Office - Morehead City
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Town of Atlantic Beach
Land Classification From LUP - Conservation
(B) AEC(s) Involved: PT, EW
(C) Water Dependent: YES
(D) Intended Use: Private
(E) Wastewater Treatment: Existing - N/A
Planned - N/A
(F) Type of Structures: Existing - Single-family homes/community boat basin
Planned - 3 additional docks
(G) Estimated Annual Rate of Erosion: -0-
Source - bulkheaded
7. HABITAT DESCRIPTION: [AREA]
DREDGED FILLED OTHER
(A) Vegetated Wetlands
NONE
(B) Non-Vegetated Wetlands 414 sq. ft.
Docks - Boat Basin
(C) Other
NONE
(D) Total Area Disturbed: 414 sq. ft.
(E) Primary Nursery Area: NO
(F) Water Classification: 'SA' Open: NO
8. PROJECT SUMMARY: The applicant proposes to construct 3 additional docks in the Asbury Beach
Subdivision boat basin.
A
FIELD INVESTIGATION REPORT:
ROBERT YOUNGBLOOD (ASBURY BEACH SUBDIVISION)
PAGE #2
9. NARRATIVE DESCRIPTION: The applicant's project, known as Asbury Beach
Subdivision, is located on a man-made canal, off Bogue Sound, on E. Fort Macon
Road, in Atlantic Beach, Carteret County.
The applicant received CAMA Major Permit #53-88 in 1988. The applicant dredged
an existing canal to a water depth of -31/2' MLW and constructed 7 docks. The
applicant originally received a permit for the construction of 10 docks, but, the permit
has subsequently expired. The applicant proposes to construct the 3 previously
permitted docks under this permit application. This will bring the total slips to ten
(10). The 3 proposed docks are 6' x 23' and will serve residents of the subdivision.
10. ANTICIPATED IMPACTS: The proposed docks will occupy 414 sq. ft. of Public
Trust Waters in a man-made boat basin.
The waters of the canal and basin are classified as 'SA' by the Division of
Environmental Management and are closed to shellfishing by the Division of
Environmental Health and Division of Marine Fisheries.
------------------
PREPARED BY: W. DAVID NOBLE
DATE: March 17, 1993
Please type or print. Carefully describe all anticipated
development activities, including construction, excava-
tion, filling, paving, land clearing, and stormwater con-
trol. If the requested information is not relevant to your
project, write N/A (not applicable). Items 1-4 and 8-9
must be completed for all projects.
1 APPLICANT
a. Name Robert F. Youngblood
Address P O Box 398
City Atlantic Beacl'State N
Zip 28512 Day phone
247-4326
X Landowner or Authorized agent
b. Project name (if any) Asbury Beach Subdiv.
If you plan to build a marina, also complete and
attach Form DCM-MP-2.
b. Is the proposed activity maintenance of an
existing project, new work, or both?
nPw wnrk in existing project
c. Will the project be for community, private, or
commercial use?
private
d. Describe the planned use of the project.
boating facilities
c. If the applicant is not the landowner, also give the
owner's name and address.
4 LAND AND WATER
CHARACTERISTICS
a. Size of entire tract 15 acres
2 LOCATION OF PROPOSED
PROJECT
a. Street address or secondary road number
Fort Macon Rd, Atlantic Beach
b. City, town, community, or landmark
Atlantic Beach
b. Size of individual lot(s) 50x150
c. Elevation of tract above mean sea level or
National Geodetic Vertical Datum
116it-811
d. Soil type(s) and texture(s) of tract
sand & some mud
e. Vegetation on tract few trees & marsh
f. Man-made features now on tract houses, bulkhead
c. County Carteret g.
d. Is proposed work within city limits or planning
jurisdiction? yes
e. Name of body of water nearest project
Bogue Sound
3 DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
canal & piers
What is the CAMA Land Use Plan Classification of
the site? (Consult the local land use plan.)
Conservation Transitional
x Developed Community
Rural Other
h. How is the tract zoned by local government?
RA1
i. How are adjacent waters classified?
S,A
a. Describe all development activities you propose (for j. Has a professional archaeological survey been
example, building a home, motel, marina, bulkhead, carved out for the tract? No If so, pier). Build 3 piers
by whom?
3/91
5 UPLAND DEVELOPMENT
Complete this section if the project includes any land
development.
a. Type and number of buildings, facilities, or
structures proposed N/A
b. Number of lots or parcels N/A
c. Density (Give the number of residential units and the
units per acre.) N/A
d. Size of area to be graded or disturbed
N/A
e.
If the proposed project will disturb more than one
acre of land, the Division of Land Resources must
receive an erosion and sedimentation control plan at
least 30 days before land disturbing activity begins.
If applicable, has a sedimentation and erosion
control plan been submitted to the Division of Land
Resources? N / A
f. Give the percentage of the tract within 75 feet of
mean high water to be covered by impermeable
surfaces, such as pavement, buildings, rooftops.
N/A
g. List the materials, such as marl, paver stone, asphalt,
or concrete, to be used for paved surfaces.
h. If applicable, has a stormwater management plan
been submitted to the Division of Environmental
Management? N/A
i. Describe proposed sewage disposal and/or waste
water treatment facilities.
N/A
j. Hffe/ these facilities received state or local approval?
k. Describe existing treatment facilities.
1. Describe location and type of discharges to waters of
the state (for example, surface runoff, sanitary
wastewater, industrial/commercial effluent, "wash
down"). N/A
m. Water supply source
n. If the project is oceanfront development, describe
the steps that will be taken to maintain established
public beach accessways or provide new access.
o. If the project is on the oceanfront, what will be the
elevation above mean sea level of the first habitable
floor? N/A
6 EXCAVATION AND FILL
INFORMATION
a. Describe below the purpose of proposed excavation
or fill activities (excluding bulkheads, which are
covered in Section 7).
Length Width Depth
Access channel
(MLW) or 0, WL)
Boat basin
Other (break-
water, Qier,
boat ramp,
rock jetty)
Fill placed in
wetland or below
MHW
Upland fill
areas
b. Amount of material to be excavated from below
water level in cubic yards N/A
c. Type of material N / A
d. Does the area to be excavated include marshland,
swamps, or other wetlands?
N/A
e. High ground excavation, in cubic yards
N/A
2 3/91
f. Dimensions of spoil disposal area
N/A
g. Location of spoil disposal area N/A
h. Do you claim title to the disposal area? N/A
If not, attach a letter granting permission from the
owner.
i.
Will a disposal area be available for future
maintenance? N/A
If so, where?
j. Does the disposal area include any marshland,
swamps, or water areas?
N/A
k. Will the fill material be placed below mean high
water? N/A
1.. Amount of fill in cubic yards N/A
m. Type of fill material N/A
n. Source of fill material N/A
o.
p. Dimensions of the wetland to be filled
N/A
q. How will excavated or fill material be kept on site
and rAosion controlled?
r. What type of construction equipment will be used
(for example, dragline, backhoe, or hydraulic
dredge)? N / A
s. Will wetlands be crossed in transporting equipment
to project site? n n_ If yes, explain steps that will
be taken to lessen environmental impacts.
7 SHORELINE STABILIZATION
a. Length of bulkhead or riprap N/A
b. Average distance wate N arAd of mean high water or
normal water level
Will fill material be placed on marsh or other
wetlands? N/A
c. Shoreline erosion during preceding 12 months, in
feet N/A
d. Type of bulkhead material N/A
e. Amount of fill, in cubic yards, to be placed below
meanhigh water N/A
f. Type of fill material
N/A
8 ADDITIONAL INFORMATION
In addition to the completed application form, the follow-
ing items must be submitted:
A copy of the deed (with state application only) or other
instrument under which the applicant claims title to the
affected property. If the applicant is not claiming to be
the owner of said property, then forward a copy of the
deed or other instrument under which the owner claims
title, plus written permission from the owner to carry out
the project.
An accurate work plat (including plan view and cross
sectional drawings) drawn to scale in black ink on an 8
1/2 x 11 white paper. (Refer to Coastal Resources-
Commission Rule 7J.0203 for a detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if 18 high
quality copies are provided by applicant. (Contact the
U.S. Army Corps of Engineers regarding that agency's
use of larger drawings.) A site or location map is a part
of plat requirements and it must be sufficiently detailed
to guide agency personnel unfamiliar with the area to the
site. Include county road (SR) numbers, landmarks, and
the like.
A stormwater management plan, if applicable, that
may have been developed in consultation with the
Division of Environmental Management.
A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners. These
individuals have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Management and should be advised by the applicant of
that opportunity.
3/91
Name Deacon Jones
Address P O Box 2280
Smithfield, N C 27577
Name James A. Moss
Address 5716 Louisburg Rd
Raleigh, N C 27604
Name Donald Bryant
Address P O Box
Jackson. N C 27845
A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
pennittee, and issuing dates.
State Permit No. 53-88 3/8/88
Modification to permit - File
No. CESAW-C -N-01 9/7/90
A check for $250 made payable to the Department of
Environment, Health, and Natural Resources to cover
the costs of processing the application.
A signed AEC hazard notice for projects in oceanfront
and inlet areas.
A statement on the use of public funds. If the project
involves the expenditure of public funds, attach a state-
ment documenting compliance with the North Carolina
Environmental Policy Act (N.C.G.S. 113A-1 to 10).
9 CERTIFICATION AND PERMISSION
TO ENTER ON LAND
Any permit issued in response to this application will
allow only the development described in the application.
The project will be subject to conditions and restrictions
contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's ap-
proved Coastal Management Program and will be con-
ducted in a manner consistent with such program.
I further certify that I am authorized to grant, and do in
fact, grant permission to representatives of state and
federal review agencies to enter on the aforementioned
lands in connection with evaluating information related
to this permit application and follow-up monitoring of
project.
This is e 1 i day of March 19 9 3
1Y,
Landowner or A!7ed agent
4 3/91
,
MftaS?+
I,TNf
V
3
3 _
10.4
kb !!?
U4 ?-' --
?z
N?
9
i d
00 Uhl 4-.
IT CC H ?
I?'I
_i
:Z2 ?Fb
I?
1
QV c?
-L-It-09 qory
?t71
? h
? ti