HomeMy WebLinkAbout20190924 Ver 1_030121_HYD_PRM_WET_SET_20190626_20190712I I 4hwav North Carolina Department of Transportation p
4t(Ir1 l"% ijwr
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN c `'
(Version 2.08; Released April 2018) FOR NCDOT PROJECTS
WBS Element: SF-030121 TIP No.: 17BP.10.C.9 County(ies): Anson Page 1 of 1
General Project Information
WBS Element:
SF-030121 ITIP Number: 17BP.10.C.9 Project Type: Bridge Replacement Date: 6/14/2019
NCDOT Contact:
Garland Haywood, PE
Contractor / Desi ner:
Dean Lewis
Address:
NCDOT Highway Division 10
716 W Main Street
Albemarle, NC 28001
Address:
HDR Engineering, Inc. of the Carolinas
555 Fayetteville Street, Suite 900
Raleigh, NC 27601
Phone:
704 983-4400
Phone:
919 232-6632
Email:
ha ood ncdot. ov
Email:
dean.lewis hdrinc.com
City/Town:
Marshville
Count ies :
Anson
River Basins :
Yadkin -Pee Dee
CAMA County?
No
Wetlands within Project Limits?
Yes
Project Description
Project Length (lin. miles or feet):
0.21 Surrounding Land Use: I Woodlands/Farmlands
Proposed Project
11111111 Existing Site
Project Built -Upon Area ac.
0.6 ac.
0.5 ac.
Typical Cross Section Description:
Meltonville Church Road (SR 1230): 2 paved lanes (10' each) shoulder width varies from
3' without guardrail to 7' with guardrail.
Meltonville Church Road (SR 1230): 2 paved lanes (10' each) shoulder width varies.
No guardrail within project area.
Annual Avg Daily Traffic (veh/hr/day):
Design/Future: 250 Year: 2039
Existing: 150 Year: 2019
General Project Narrative:
(Description of Minimization of Water
Quality Impacts)
The North Carolina Department of Transportation (NCDOT) has proposed to replace Anson County Structural Pipe #121 on Meltonville Church Road (SR 1230) over Brown
Creek. The existing structure is a triple barrel 96" CMP culvert with wooden headwalls. The proposed structure is a double barrel 12'X8' RCBC buried 1'. This structure has been
designed to minimize environmental impacts using 2:1 slopes w/guardrail. There are scour holes upstream and downstream of the proposed 12'X8' RCBC which will be filled
with rip -rap to minimize future scour. As part of the project an existing 72" RCP at 12+00 -L- will be replaced with a 66" RCP buried 1' to meet minimum cover requirements.
Scour was observed at this site, therefore the upstream and downstream banks of the proposed structure will be reinforced with rip -rap to minimize sccour in the future.
Waterbody Information -.1116
Surface Water Body (1):
Brown Creek
NCDWR Stream Index No.:
13-20
NCDWR Surface Water Classification for Water Body
Primary Classification:
Class C
Supplemental Classification:
None
Other Stream Classification:
None
Impairments:
None
Aquatic T&E Species?
Yes Comments: Carolina Heels litter and Schweinitz's sunflower habitat exists near Brown Creek. NCDOT biologists will conduct a surveyfor thesespecies
NRTR Stream ID:
iBrown Creek
JIBuffer Rules in Effect: N/A
Project Includes Bridge Spanning Water Body?
INo
I Deck Drains Discharge Over Buffer? N/A
IDIssipator Pads Provided in Buffer? N/A
Deck Drains Discharge Over Water Body?
N/A
I (If yes, provide justification in the General Project Narrative)
I
(If yes, describe in the General Project Narrative; if no, justify in the
I General Project Narrative)
(If yes, provide justification in the General Project Narrative)
See Sheet 1 A For Index of Sheets
PL®L®�iAA�®T A
TUATLS
ffAM PWWr & NM E� SHU
�
lzsz
1713P.10.C.9
p�
�
/' •
• �
DIVISION OF HIGHWAYS
grs�s aaoa¢iw xe.eao7•rro. Deernsrcaa
�
�'
Store Rd.l
}
17BP.10.C.9 P.E., R/W, CONSTR.
VWhite
n
�— —
03
Union; Church
"� �I
ANSON COUNTY
003
3 1231 -- Brown Creek '
PROJECT
LOCATION: CULVERT NO. ON SR 1230 OVER BROWN CREEK
PERMIT DRAWING
SHEET 1 OF 7
`���o,
BETWEEN SR 1231 AND SR 1228
�-LOCATION
GL1,55
ti�feo-
��R"'' 1228
TYPE OF WORK: GRADING, DRAINAGE, PAVING, AND STRUCTURE
1230
"'Chur�ri1e
WETLAND AND STREAM IMPACTS
.�
;
�1229;
1225
O
Mount
0J
�I9hF OfA
Olive
Church
t
DETOUR ROUTE
VICINITY MAP
(NOT TO SCALE)
SITSEEE
�
SITE 2
ENLARGED
� � 1
SEE ENLARGED
AREA ON
SHEET 4A
W !� �I
8W �
,� 1_
�yl 14__ g�
AREA ON
SHEET 46
SITE 3
END CONSTRUCTION
END STATE PROJECT 17BP.10.C.9
w\
\
N
B
SEE ENLARGED
AREA ON
—L— STA. 20+94.07
\
_
_ 1s 1s
BEET 46
BEGIN CONSTRUCTION
re TB—
1s 1s
BEGIN STATE PROJECT17BP.10.C.T\
W
\.BL�
— —
---
—---
is is
---- BL-103
—L— STA. 10 + 00.00
s
—�—
—
-- -------------
MELTOWILLE CHURCH RD.
SITE 4
-
TO SR 1226
is
SR 12JO
SEE ENLARGED
L6 RCP —IV
AREA ON
BURIED 1'
SHEET 4B
y
2 @ 12' x 8' RCBC
BURIED 1'
116V
�I
LOCATION SKETCH
HDR Engineering, Inc. of the Carolinas INOOMPLETE PLAN$
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 DO NOT USE FOR R/W ACQUISITION
CLEARING ON THIS PROJECT SHALL BE PERFORMED
N.C.B.E.L.S.
License Number: F-0116 DOCUMENT NOT CONSIDERED FINAL
• •
TO THE LIMITS ESTABLISHED BY METHOD II
UNLESS ALL SIGNATURES COMPLETED
V
GRAPHIC SCALES
DESIGN DATA
PROJECT LENGTH
.I
Prepared for the Office of:
HYDRAULICS ENGINEER
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
50
25 0 50 100
ADT 2019 = 150
ADT 2039 = 250
DIVISION OF HIGHWAYS
Ridge r.,
1000 Birch RidDRaleigh NC, 27610
F "Opp
2018 STANDARD SPECIFICATIONS
DHV = %
LENGTH ROADWAY STATE PROJECT 17BP.10.C.9 = 0.202 MILES
PLANS
a ?;
D %
LENGTH STRUCTURES STATE PROJECT 17BP.10.C.9 = 0.005 MILES
SIGNATURE:
PX.
o
25 12.5 0 25 50
_
T %
RIGHT OF WAY DATE:
DOMINIC M. WAINWRIGHT, P.E.
ROADWAY
DESIGN
PROJECT ENGINEER
V = 55 MPH
TOTAL LENGTH STATE PROJECT 17BP.10.C.9 = 0.207 MILES
_
ENGINEER
ENGINEER
owe
OR TR�MN
PROFILE (HORIZONTAL)
O5
2.5 0 5 10
FUNC CLASS =
LETTING DATE:
ALEXANDER D. SNIDER, P.E.
PROJECT DESIGN ENGINEER
LOCAL RURAL
FEBRUARY 5, 2020
SCOTT COLE
V
SUBREGIONAL TIER
P.E.
SIGNATURE:
PROFILE (VERTICAL)
F.E.
DIVISION ENGINEER
0
0
N
C
u
0
D,
- WETLAND AND STREAM IMPAfiffEENEll
° LEGEND
DENOTES IMPACTS IN
SURFACE WATER
®DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
DETAIL A DETAIL F DETAIL I
LATERAL BASE DITCH DETAIL B CUT DITCH BANK STABILIZATION AT 1S
I— srnle) RIP RAP AT EMBANKMENT IN— Saol.) (Non. s 10 Em.r.le.d
b
Npluml N. to Smle) F—kh
1'min. \ °� Slope —d Ground
Ground 7�7 D �.'N 1°?1. Fill Ground ?� A\°`
Slope Ditch 1.0' 1.5 7 D f F:1
., Min. D= 1.0 Ff. Grad< 1 5 l (rYF)
I.'^ B= 4 Ff. Min. D= Ft. G..mnll.
1,= 5 F1. M"nel a
GEOTEXTILE C
FROM STA. 11+00 RT -L- TO STA. 11+91 RT -L- Nprmniel
FROM STA. 12+06 RT -L- TO STA. 15+43 RT A- Tpp..F—, n li a,r, e p - Icey —
FROM STA. 11+60 RT -L- TO STA. 11 +95 RT -L-
FROM STA. 12+00 RT -L- TO STA. 12+30 RT -L-
FROM STA. 15+25 RT -L- TO STA. 15+56 RT -L-
FROM STA. 15+83 RT -L- TO STA. 15+99 RT -L-
ISITE 2
O
AUDREY & DARLENE
CHAMBER ET AL
SITE 1
DB 65 PG 343 -L-
SITE 2
P1 Sta 12+57A3
E
SEE ENLARGED
AREA ON
BANK STABILIZATION
= 19'41�425'(RT) p'�Qy'
SHEET 4B
CLASS II RIP RAP
D = 9'32'575'
�ati\�°'`
EST. 35 TONS
L = 20625'
-L- P0`
EST. 55 SY GEOTEXTILE
'I'
T = 1Q4J5�
SEE DETAIL
R = 600,
BANK STABILIZATION
V = 45 MPH
WOODS
CLASS II RIP RAP
e = 0A8
BANK STABILIZATION
EST. 65 TONS
Li = 184'
CLASS II RIP RAP
EST. 90 SY GEOTEXTI
E5T. 94 TONS
SEE DETAIL 'I' Yn
EST. 1.32 SY GEOTEXTILE
15
66" PC
BURIED 1'.,„
'
BM°I
ELEV° = 317,23
N 414585 E 1609038
-BL- STA 5+00
N 70-55'19.4' w DIST 264.59
F
RR SPIKE IN 48' OAK
oFpRO
To
BD
�•�1
SITE 1
SEE ENLARGED
*030I21-2 AREA ON
SHEET 4A
O
GRIFFIN LIVING TRUST
DB 732 PG 39
A
7
FROM STA. 11+75
LT -L- TO STA. 15+LT -L- TO STA. 12+12 LT -L- /
FROM STA. 15+18 48 LT -L-
FROM STA. 15+47 RT -L- TO STA. 15+59 RT -L-
FROM STA. 15+72 LT -L- TO STA. 16+30 LT -L-
FROM STA. 15+86 RT -L- TO STA. 15+99 RT -L-
FILL
EXISTING SCOUR HOLE
WITH CLASS II RIP RAP TO AN
APPROXIMATE
ELEV. OF 307.4
30
TO
PREVENT DITCH HEADCUTTING
O
AND
I
FUTURE ROADWAY FAILURE
I' I SEE
DETAIL'G'
WILLIAM & JAMES HARGETT
DB 198 PG 838
BANK STABILIZATION
CLASS II RIP RAP
4F I
EST. 76 TONS -L- PRC Sty.
EST. 107 SY GEOTEXTILE
. I
SEE DETAIL 'I'
I
MAINTAIN EXISTING DITCH; ROADWAY
I
IS BEING SHIFTED TO ALLOW DITCH
I
TO STABILIZE AT A 2:1 SIDE SLOPE
BM-2
ODDS'
•i I
LEV. = 316.70
R ti A
N 4
4346 E 1609666
-BL
STA 8+99 88LT
t
SPIKE IN IT
-RR
F
SITE 3
E
8 T H AD
I AL
TNG
RIP RAP AT EMBANKMENT ,
DITCH OVERFLOW
CLASS I RIP RAP i
ANCE FROM 12'X8'
EST. 37 TONS
SEE DETAIL 'A'
EST. 52 SY GEOTEXTILE -,
SEE DETAIL 'B'
AP AT EMBANKMENT
S I RIP RAP
39 TONS
BANK STABILIZATION
54 SY GEOTEXTILE
CLASS II RIP RAP
DETAIL'B'
EST. 10 TONS
r-T.S�l
EST. 13 SY GEOTEXTILE
AP AT EMBANKMENT
SEE DETAIL 'I'
I RIP RAP
6 TON$6
SY GEOTEXTILEETAIL
B'-L-
PT Sta.13+59J3ta.11+52.88
O
WILLIAM & JAMES HARGETT
DB 198 PG 838
7BASE
TCH
2' LATERAL BASE DITCHP
SEE DETAIL 'D'
EMBANKMENT
SITE 4
RAPEST.
44 TONS
EST. 62 SY GEOTEXTILE
SEE DETAIL 'B'
`1i11I��
GRAPHIC SCALE
`el
F__ _ _ _ _'_ _ 2-8Ly0.
_YURCH RO (SR 1230) 19BST
------------------------------
2' CUT BASE DITCH ^,� SEE DETAIL 'E' S 56' 04' 532E
-L-
P1 Ste 16+8259
P1 Ste 19+57J4
A = Z Jr 00.8' (LT)
0 = Z 10' 18hI (RT)
I BANK STABILIZATION
CLASS II RIP RAP
D = 0' 5Y 14.9
D = 0' 5N 14V
EST. 9 TONS
L = 2944.7,6,
L = 25435'
EST. 12 SY GEOTEXTILE
7ll
T = 1 .`/
T = 127J9'
m SEE DETAIL T
I
R = 6,7104W
45
R = 6,71 QW
45
FILL EXISTING SCOUR HOLE
WITH CLASS II RIP RAP TO AN
V = PH
= A/C
e ll
V = YPH
B = 1/L+
AI
APPROXIMATE ELEV. OF 307.4'
TO PREVENT UNDERCUTTING OF
THE PROPOSED CULVERT
SEE DETAIL 'H'
DETAIL 'G'
CULVERT SCOUR HOLE BACKFILL
(.— -1.)
PROPOSED
ROADWAY
FILL SLOPE
FILL SCOUR HOLE WITH
CLASS II RIP RAP
FLOW
EXISTING GROUND
ALONG CULVERT fL
PROJECT REFERENCE NO. SHEET NO.
17BP.10.C.9 4
RAN SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
I�T�.lpkE E PL.�T�
DO NOT USE FOR / W ACQUISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
F♦ ` HDR Engineering, Inc. of the Carolinas
J !` 555 Fayetleville St, Suite 900 Raleigh, N.C. 27601
N.C.B.E.L.S. License Number: F-0116
PERMIT DRAWING � ���,�,
SHEET 2 OF 7 IledC !^I ICI�I
TO SR 1228 —�
-L- POT Sta.20+94.07
DETAIL 'H'
CULVERT SCOUR HOLE BACKFILL
PROPOSED
I.— Scple)
ROADWAY
FILL SLOPE
E FLOW
EXISTING GROUND
PROPOSED
I
ALONG CULVERT Ct
12'X8' RCBC
BURIED 1'
FILL SCOUR HOLE
CLASS II RIP RAP
D,
- WETLAND AND STREAM IMP
LEGEND
DENOTES IMPACTS IN
SURFACE WATER
®DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
DETAIL A DETAIL F DETAIL I
LATERAL BASE DITCH DETAIL B CUT DITCH RANK STABILIZATION AT 1S
I- Smla) (Notto Sc.16) (N.tt° S 10
h RIP RAP AT EMBANKMENT E °.°IR d
Npbrol INotto Smle) F°m l.ti.
1'min. \ �� Slope G,°und G,...d
Dikh 1
Ground 7�7 D �.'� 1°?1. Fill Ground ?� A\�
Slope Ditch 1.0' D f F:1
B Min. D_-1.0 Ft. Gmd< 1 5 I° r py%
I.'B= 4 Ft. Min. D= Ft. G.°mnll.
6= 5 F1. CM-.l d
GEOTEXTILE FROM STA. 11+00 RT -L- TO STA. 11+91 RT -L- L_"h- . R. (vp,wni,)
FROM STA. 12+06 RT -L- TO STA. 15+43 IT A_ TY dun.,- CL li RI,,R°p - Kid
FROM STA. 11+60 RT -L- TO STA. 11 +95 RT -L-
FROM STA. 12+00 RT -L- TO STA. 12+30 RT -L-
FROM STA. 15+25 RT -L- TO STA. 15+56 RT -L-
FROM STA. 15+83 RT -L- TO STA. 15+99 RT -L-
SITE 1
BANK STABILIZATION
CLASS II RIP RAP
EST. 35 TONS
EST. 55 SY E D TEXTILE
SEE
SDETAIL 'I'
BANK STABILIZATION
CLASS II RIP RAP \
EST. 65 TONS
EST. 90 SY GEOTEXTI
SEE DETAIL
MAINTAJN
1
EXISTING DITCH
BM°I
L
ELEV. = 317,23
xti rJ/
N 414585 E 1609038-
-BL- STA 5+00
j
N 70-55'19.4' w DIST 264.59
F F
RR SPIKE IN 48' OAK
/
IJ'N�FORD Rp
/iWOODS`
TD
p__ -
�ro SPdQGT01T
'F'
DETAIL
SITE 1
SEE ENLARGED
AREA ON
*030121-2
1 /_
SHEET 4A
O /�1
GRIFFIN LIVING TRUST
DB
732 PG 39
0
O
AUDREY & DARLENE
CHAMBER ET AL
DB 65 PG 343
l
-L-
Z2
SEE ENLARGED
PI Sta 12+57.03
E
AREA ON
A = 19'41'42.5 (RT)
A1Qq
SHEET 4B
D = 9 32'57.5'
�e�\�Q`
L = 204J 5'
06J5'
L- PO
T =
R = 600,W
_
vyOODS
V=45MPH
—
P. = 0A8
BANK STABILIZATION
r v 18
CLASS II RIP RAP
_
315 ..
EST. 94 To
EST. 132 �,Y GEOT
.. E. AIL
INV
—INV= .3
—
— 9s�cMP-
4' BAS DITCH OVERFLOW
ANCE FROM 12'X8'
SEE DETAIL 'A'
RIP RAP AT EMBANKMENT le`
CLASS I RIP RAP
—EST. 39 TONS
EST. 54 SY GEOTEXTILE
SEE DETAIL 'B'
RIP RAP AT EMBANKMENT
CLASS I RIP RAP
- EST. 26 TONS
EST. 36 SY GEOTEXTILE
SEE DETAIL 'B' -L-
RIP RAP AT EMBANKME�5�,
CLASS I RIP RAP
EST. 3� TONS
¢ST. 52 SY GEOTEXTILE
SEE DETAIL 'B'
� I
BANK STABILIZATION
CLASS II RIP RAP
EST. 10 TONS
EST.13 SY GEOTEXTILE
SEE DETAIL 'I'
13+59J3 nO
L
WILLIAM & JAMES HARGETT
DB 198 PG 838
FROM STA. 11+LT - TO STA. 12+12 LT - /
FROM STA.15+18 78 LT A-L- TO STA. 1 5 + A
LT -L-
FROM STA. 15+47 RT -L- TO STA. 15+59 RT -L-
FROM STA. 15+72 LT -L- TO STA. 16+30 LT _L_
FROM STA. 15+86 RT -L- TO STA. 15+99 RT -L-
FILL EXISTING SCOUR HOLE
WITH CLASS II RIP RAP
30 O
APPROXIMATE ELEV. OF 307.4'4'
TO PREVENT DITCH HEADCUTTING
AND FUTURE ROADWAY FAILURE
I I SEE DETAIL'G' WILLIAM & JAMES HARGETT
• � �
SY
RANK STABILIZATION DB 198 PG 838
j I CLASS II RIP RAP
ES 1, TONGEOTEXTILE -L- PRC Sty.
SEE DETAIL 'I'
MAINTAIN EXISTING DITCH; ROADWAY
I I IS BEING SHIFTED TO ALLOW DITCH
./I TO STABILIZE AT A 2:1 SIDE SLOPE /
Ai
x
`1i11I.- I�
GRAPHIC SCALE
BM-2
�E I LEV. 316.70 r /
N 44346 E 1609666 /
BL STA 8+99 88LT 20
RR SPIKE IN 12' OAK U
SITE 3 a _ 7� �� 3�
TERAL BASE�DIJ H vi
LASS BP
RIP-RAP 2' T1101L,BASE DITCH
DETAIL 'C'
SEE DETAIL 'D'
RIP RAP AT EMBANKMENT SITE
CLASS I RIP RAP
EST. 44 TONS
EST. 62 SY GEOTEXTILE
SEE DETAIL 'B'
\ BANK STABILIZATION
CLASS II RIP RAP
EST. 9 TONS
EST. 12 SY GEOTEXTILE
SEE DETAIL T
FILL EXISTING SCOUR HOLE
WITH CLASS II RIP RAP TO AN
APPROXIMATE ELEV. OF 307.4'
TO PREVENT UNDERCUTTING OF
THE PROPOSED CULVERT
SEE DETAIL 'H'
PROJECT REFERENCE NO. SHEET NO.
17BP.10.C.9 4
RAN SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
I_T( ompLE E PL"s
W NOT USE FOR / W ACQUISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
F♦ ` HDR Engineering, Inc. of the Carolinas
J !` 555 Fayetleville St, Suite 900 Raleigh, N.C. 27601
N.C.B.E.L.S. License Number: F-0116
PERMIT DRAWING
SHEET 3 OF 7 IledC !^I ICI�I
ntaT TO SR 12W
—315 F
2CUT BASE1TCIi_
SEE DETAIL 'E' S 5604' 53.2' E
1
-L-
P/ Sta 16+8259
P1 Ste 19+57J4
A = 2' Jr 00e (LT)
0 = Z 10' 18e (RT)
D=O'5/'14.9
D=IT5NMV
L = 294.76,
L = 25435'
T = 147.40'
T = 127J9'
R = 6,7/
R = 6,7/
e _ NC PH
V _ NC PH
-L- P0T Sta.20+94.07
DETAIL 'G'
DETAIL 'H'
CULVERT
SCOUR HOLE BACKFILL
CULVERT SCOUR HOLE
BACKFILL
I—. sml,)
PROPOSED INmro Rple)
ROADWAY
PROPOSED
FILL SLOPE
ROADWAY
FILL SLOPE
E FLOW
FLOW
EXISTING GROUND
PROPOSED
PROPOSED I
ALONG CULVERT't
12'X8' RCBC
EXISTING GROUND
12'X8' RCBC
BURIED 1'
ALONG CULVERT fL
BURIED 1'
FILL SCOUR HOLE WITH
FILL SCOUR HOLE WITH
CLASS II RIP RAP
CLASS II RIP RAP
�, t
o<
N L
to "
t\g "
O
0
U
)
i
WETLAND AND STREAM IMPACTS
LEGEND
S DENOTES IMPACTS IN
SURFACE WATER
DENOTES TEMPORARY
/6wy/xz/// IMPACTS IN SURFACE WATER
DETAIL A
LATERAL BASE DITCH
( Not to Scale)
Natural
Ground :1 D lift, Fill
Slope
a Min. D= 1.0 Ft.
Ir.l B= 4 F.
b= 5 Ft.
FROM STA. 12+06 RT -L- TO STA. 15+43 RT -L-
DETAIL B
RIP RAP AT EMBANKMENT
( Not to Scale)
1'mi
Ditch 7E.T.U
min. 1.5'
Grade
FROM STA. 11+60 RT -L- TO STA. 11+95 RT -L-
FROM STA. 12+00 RT -L- TO STA. 12+30 RT -L-
FROM STA. 15+25 RT -L- TO STA. 15+56 RT -L-
FROM STA. 15+83 RT -L- TO STA. 15+99 RT -L-
DETAIL F
CUT DITCH
( Not to Scale)
Front
a< Ditch
Natural A'� �¢< Slope
Groand ?,.� D Flo
Min. D= Ft.
FROM STA. 11+00 RT -L- TO STA. 11+91 RT -L
DETAIL I
BANK STABILIZATION AT JS
( Not to Scale) Natural Bed
Elevation
alural Nafunl
Ground Ground
�:1 or
FlaBer )TYP)
Geotextile
Length= 70 Ft. Channel d
)Variable)
Type of Liner= CL II Rip -Rap - Keyed -In
FROM STA. 11+75 LT -L- TO STA. 12+12 LT -L-
FROM STA. 15+18 LT -L- TO STA. 15+48 LT -L-
FROM STA. 15+47 RT -L- TO STA. 15+59 RT -L-
FROM STA. 15+72 LT -L- TO STA. 16+30 LT -L-
FROM STA. 15+86 RT -L- TO STA. 15+99 RT -L-
BANK STABILIZATION
1-1 ACC II DID DAD
BANK STABILIA
CLASS II F
SEE DE
SPECIAL CUT DITCH
SEE DETAIL 'F'
DETAIL SHEET FOR
SITE I
I" RCP -IV
JRIED 1'
FERAL BASE DITCH
)ETAIL 'A'
RIP RAP AT EMBANKMENT
CLASS I RIP RAP
SEE DETAIL 'B'
' AT EMBANKMENT
RIP RAP
SEE DETAIL 'B'
� f
st
N j
0
5
O
0
L
v t
T
OF WETLAND AND STREAM IMPACTS
LEGEND
S S S DENOTES IMPACTS IN
SURFACE WATER
DENOTES TEMPORARY
/f�(OTS1 IMPACTS IN SURFACE WATER
DETAIL 'H'
CULVERT SCOUR HOLE
BACKFILL
PROPOSED (Nano Scale)
ROADWAY
FILL SLOPE
-WE FLOW
EXISTING GROUND
PROPOSED I
ALONG CULVERT
12'X8' RCBC
BURIED 1'
FILL SCO4HOLEWITIH.
CLASS II RIP RAP
DETAIL C
LATERAL BASE DITCH
( Not to Scale)
Not aral � Fill
Groaad Z•I D 1'� t"rFt• Slope
d
GEOTEXTILE �� B
Min. D= 1 Ft.
Mo.. d = 1 Ft.
'When B is < 6.0' B= 2 Ft.
Type of Liner- Class 'B' Rip -Rap b= 5 Ft.
ZOM STA. 15+87 RT -L- TO STA. 16+50 RT -1
DETAIL I
BANK STABILIZATION
AT JS
( Not to Scala)
Nataral Bed
Elevation
Nataral
Nataral
Grown
Ground
1.5'
2:1 or
Flatter (TYP)
Geotextila
Length- 70 Ft. Channel
(Variable)
d
Type of Liner= CL II Rip Rap - Keyed -In
FROM STA. 11+75 LT -L- TO STA. 12+12 LT -L-
FROM STA. 15+18 LT -L- TO STA. 15+48 LT -L-
FROM STA. 15+47 RT -L- TO STA. 15+59 RT -L-
FROM STA. 15+72 LT -L- TO STA. 16+30 LT -L-
FROM STA. 15+86 RT -L- TO STA. 15+99 RT -L-
BANK STABILIZATION
CLASS II RIP RAP
SEE DETAIL 'I'
4' LATERAL
BASE DITCH
DETAIL 'G'
CULVERT SCOUR HOLE BACKFILL
( Not to Scale)
PROPOSED
ROADWAY
FILL SLOPE
FLU
PROPOSED
12'X8' RCBC I EXISTING GROUND
BURIED 1' ALONG CULVERT CL
FILL SCOUR HOLE WITH
CLASS II RIP RAP
RIP RAP AT EMBANKMENT
CLASS I RIP RAP
SEE DETAIL 'B'
BANK STABILIZATION
CLASS II RIP RAP
SEE DETAIL 'I'
FILL EXISTING SCOUR HOLE
WITH CLASS II RIP RAP
SEE DETAIL 'H'
DETAIL SHEET FOR
FILL EXISTING SCOUR HOLE
WITH CLASS II RIP RAP
SEE DETAIL 'G'
BANK STABILIZATION
CLASS II RIP RAP
SEE DETAIL 'I'
SITE 3
DETAIL A
LATERAL BASE DITCH
(Not to Sjccale)�{
Natural
Ground 2.y D �,� Fill
Slope
B Min. D= 1.0 Ft.
Imo.! B= 4 It.
b= 5 Ft.
:OM STA. 12+06 RT -L- TO STA. 15+43 RT -L-
DETAIL B
RIP RAP AT EMBANKMENT
( Not to Scale)
Ditch
Grade
GEOTEXTILE
FROM STA. 11+60 RT -L- TO STA. 11+95 RT -L-
FROM STA. 12+00 RT -L- TO STA. 12+30 RT -L-
FROM STA. 15+25 RT -L- TO STA. 15+56 RT -L-
STA. 15+83 RT -L- TO STA. 15+99 RT -L-
---SITE 4
2' LATERAL BASE DITCH
W/CLASS B RIP —RAP
RIP RAP AT EMBANKMENT
—CLASS I RIP RAP
SEE DETAIL 'B'
BANK STABILIZATION
CLASS II RIP RAP
SEE DETAIL 'I'
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
11+97 -L- LT & RT
66" RCP, Buried 1'
< 0.01
< 0.01
13
63
Bank Stabilization
0.01
75
2
15+65 -L- LT & RT
2@12'X8' RCBC/Scour Hole
0.05
0.02
68
48
Bank Stabilization
< 0.01
33
3
16+13 -L- LT
Bank Stabillization
< 0.01
< 0.01
41
13
4
16+00 -L- RT
Ditch Relocation
< 0.01
28
TOTALS*:
0.08
0.03
258
124
0
*Rounded totals are sum of actual impacts
NOTES:
2018 Feb