Loading...
HomeMy WebLinkAbout20190924 Ver 1_PCN Form Submission_20190712DWR IDIOM n of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 21nitial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r^ No Change only if needed. BIMS # Assigned * Version#* 20190924 1 Is a payment required for this project?* r No payment required r Fee received Reviewing Office* r Fee needed - send electronic notification Mooresville Regional Office - (704) 663-1699 Select Project Reviewer* Donna Fbod:eads\drhood Information for Initial Review 1a. Name of project: Replace Culvert No. 121 over Brown Creek on SR 1230 (Meltonville Church Road) 1a. Who is the Primary Contact?* Larry Thompson, Environmental Supervisor II, NCDOT Division 10 1b. Primary Contact Email:* Ihompson@ncdot.gov Date Submitted 7/12/2019 Nearest Body of Water Brown creek Basin Yadkin-PeeDee Water Classification C Site Coordinates Latitude: 34.881346 Longitude: -80.301771 1c. Primary Contact Phone:* (704)983-4400 FA.Processing Information U County (or Counties) where the project is located: Anson Is this project a public transportation project?* r Yes r No Is this a NCDOT Project?* r Yes r No (NCDOT only) T.I.P. or state project number: 17BP.10.C.9 WBS # (?) 17BP.10.C.9 1a. Type(s) of approval sought from the Corps: W Section 404 Permit (wetlands, streams and waters, Clean Water Act) F Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What types) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) F' Regional General Permit (RGP) F' Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? f Yes r No Nationwide Permit (NWP) Number: 03 - Maintenance NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: rJ 401 Water Quality Certification - Regular F Non-404 Jurisdictional General Permit F Individual Permit le. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: F 401 Water Quality Certification - Express F Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment SR 1230 - Culvert - Division 10 - STIR - YID 104.pdf 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r^ Yes r No B. Applicant Information 1d. Who is applying for the permit? W Owner F Applicant (other than owner) le. Is there an Agent/Consultant for this project? r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: North Carolina Department of Transportation 2b. Deed book and page no.: N/A 2c. Responsible party: N/A 2d.Address Street Address 716 W Main St. Address Line 2 qry Sate / Province / Region Albemarle NC Rstal / Zip Code (ountry 28001 Stanly 2e. Telephone Number: 2f. Fax Number: (704)983-4400 (704)982-3146 65.88KB * r Yes r No r Yes r No 2g. Email Address:* Ithompson@ncdot.gov C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (d appropriate) N/A 1c. Nearest municipality/town: Marshville / Peachland 2. Project Identification 2a. Property Identification Number: 2b. Property size: N/A 0.6 2c. Project Address Street Address SR 1230 (Meltonville Church Road) Address Line 2 CRY State / Province / Region Marshville NC Postal / Zip Code Obuntry 28103 Stanly 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Brown creek 3b. Water Resources Classification of nearest receiving water:* C 3c. What river basin(s) is your project located in?* Yadkin-PeeDee 3d. Please provide the 12-digit HUC in which the project is located. 030401040102 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Land use in the project vicinity consists primarily of agriculture, forests and single family residential homes. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Fig_2_17BP_10_C_9_USGS_topo_map.pdf 256.75KB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) 17BP.10.C.9_Soil Map.pdf 175.78KB 4f. List the total estimated acreage of all existing wetlands on the property: 0.10 4g. List the total estimated linear feet of all existing streams on the property: 1,088 4h. Explain the purpose of the proposed project:* To replace Anson County Culvert #121 on SR 1230 (Meltonville Church Road) over Brown Creek. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The existing structure is a triple barrel 96" CMP culvert with wooden headwalls. The proposed structure is a double barrel 12'XS' RCBC buried 1 foot. This structure has been designed to minimize environmental impacts using 2:1 slopes with guardrail. There are scour holes upstream and downstream of the proposed 12'XS' RCBC which will be filled with rip -rap to minimize future scour. As part of the project an existing 72" RCP will be replaced with a 66" RCP buried 1' to meet minimum cover requirements. Also, the upstream and downstream banks of the proposed structure will be reinforced with rip -rap to minimize future scour. Standard construction equipment will be used including trucks, bulldozers, and cranes. 4j. Please upload project drawings for the proposed project. 030121 _HYD_PRM_WET_SET_20190626.pdf 2.67MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: N/A 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Sara Easterly Agency/Consultant Company: HDR Other: 5d1. Jurisdictional determination upload 17BP.10.C.9 SA Stream Form.pdf 113.15KB 17BP.10.C.9 SB Stream Form.pdf 121.69KB 17BP.10.C.9 SC Stream Form.pdf 116.28KB 17BP.10.C.9 WA_WB-Up.pdf 90.76KB 17BP.10.C.9 WA-Wet.pdf 89.91KB 17BP.10.C.9 WB-Wet.pdf 91.43KB 6. Future Project Plans r Unknown 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? No D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): r Wetlands 7 Streams -tributaries r Buffers r Open Waters r Pond Construction 3. Stream Impacts u 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact * 3d. S. name* 3e. Stream Type * 3f. Type of 3g. S. width * 3h. Impact ❑ M Jurisdiction* length* S1 ' " 66RCP, Buried 1 Permanent Other SC, UT to Brown Creek Intermittent Corps P 3 13 Average (feet) (linear feet) S2 66" RCP, Buried 1' Tem ora p rY Other SC, UT to Brown Creek Intermittent Cor p s 3 63 Average (feet) (linear feet) S3 Bank Stabilization Permanent Bank Stabilization SC, UT to Brown Creek Intermittent Corps3 75 Average (feet) (linear feet) S4 2 12'XB' RCBC/Scour Hole @ Permanent Other Brown Creek Perennial Corps P s 15 68 Average (feet) (linear feet) S5 2@12'XB'RCBC/Scour Hole Temporary Other Brown Creek Perennial Corps 15 48 Average (feet) (linear feet) S6 Bank Stabilization Permanent Bank Stabilization J Brown Creek Perennial Corps P 15 33 Average (feet) (linear feet) S7 Bank Stabilization Permanent Bank Stabilization J SA, UT to Brown Creek Intermittent Corps P 10 41 Average (feet) (linear feet) S8 Bank Stabilization Tem ora P ry Bank Stabilization SA, UT to Brown Creek Intermittent Corps P 10 13 Avenge(feet) (linear fed) H Ditch Relocation Permanent Other SB, UT to Brown Creek Intermittent Cor s P 6 28 Ave age (feet) (linearfee ) 31. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 258 31. Total temporary stream impacts: 124 31. Total stream and ditch impacts: 382 3j. Comments: Permanent existing channel impacts at Site 1 (SC, UT to Brown Creek) are expected to be 88 feet, 75 feet of which are from bank stabilization. Temporary impacts at Site 1 are 63 feet. Total permanent impacts at Site 2 (Brown Creek) are 101 feet with 33 feet of those permanent impacts coming from bank stabilization. There Will be 48 feet of temporary impacts at Site 2. Site 3 (SA, UT to Brown Creek) will have 41 feet of permanent impacts from bank stabilization and 13 feet of temporary impacts from bank stabilization. Site 4 (SB, UT to Brown Creek) will have 28 feet of permanent impacts from ditch relocation. E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: This structure has been designed to minimize environmental impacts using 2:1 slopes with guardrail. There are scour holes upstream and downstream of the proposed 12'X8' RCBC which will be filled with rip -rap to minimize future scour. As part of the project an existing 72" RCP will be replaced with a 66" RCP buried 1' to meet minimum cover requirements. Also, the upstream and downstream banks of the proposed structure will be reinforced with rip -rap to minimize future scour. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: NCDOT Best Management Practices for bridge and culvert replacement will be followed as well as Sediment and Erosion Control measures. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2c. If yes, mitigation is required by (check all that apply): r DWR W Corps 2d. If yes, which mitigation option(s) will be used for this project? r" Mitigation bank W Payment to in -lieu fee r Permittee Responsible program Mitigation 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. r Yes r No 4b. Stream mitigation requested: (linear feet) 109 4d. Buffer mitigation requested (DWR only): (square feet) N/A 4f. Non -riparian wetland mitigation requested: (acres) N/A 4c. If using stream mitigation, what is the stream temperature: warm 4e. Riparian wetland mitigation requested: (acres) N/A 4g. Coastal (tidal) wetland mitigation requested: (acres) WA 4h. Comments 109 linear feet of stream mitigation Will be provided using an in -lieu fee program. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No If no, explain why: This project is in the Yadkin -Pee Dee River basin. No buffer rules exist for this river basin. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No Comments: See attached G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* f- Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? * r Yes r No Comments:* A MCDC was prepared for the project. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. This is a pipe and culvert replacement project. No additional development will result from this project. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?* r Yes r No Se. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5g(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? r Yes r No If you answered "Yes" to 5g(1), did you discover any signs of bat use? r Yes r No r Unknown 5h. Does this project involve the construction/installation of a wind turbine(s)?* r Yes r No r Unknown 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No If yes, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on the property. 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS IPAC Consultation Documentation Upload 17BP.10.C.9_SelfCertification_Letter_20190620.pdf 1.44MB NHP Project_Report_ TIP_ 17bp10c9_19150_19150.pdf 709.94KB 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* National Marine Fisheries Service (NMFS) Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* The State Historic Preservation Office (SHPO) 7c. Historic or Prehistoric Information Upload 18-12-0027NoSurveypdf.pdf 3.64MB AR18-12-0027NoSitesPresent.pdf 2.89MB 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA designated 100-year floodplain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: The project meets FEMA requirements by matching the existing 100-YR Base Flood Elevation. 8c. What source(s) did you use to make the floodplain determination?* NC Flood Mapping Miscellaneous Comments Please note NLEB is not listed for Anson County per the USFWS county list updated June 27,2018. Also, the field visit for 17BP.10.C.9 was conducted on November 1, 2018, just one day outside the optimal survey window of October 31 for SchweiniL, s sunflower (Helianthus schweinitai). There were no stems of Helianthus noted during the site visit. Surveys for Carolina Heelsplitter (Lasmigona decorata) have been requested; however may be deemed unnecessary. Miscellaneous attachments not previously requested. Fig_3_17BP_10_C_9_JS_features _map.pdf 583.42KB Signature * W By checking the box and signing below, I certify that: . I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); . I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Larry Thompson Signature -e-ram0-1-w Date 7/12/2019