Loading...
HomeMy WebLinkAbout19930098 Ver 1_COMPLETE FILE_19930510MEMO' TO: YWIS 13 DATE: SUBJECT: V4 ty,E STATE 4 MnY 10. Try `7 `Ou?, North Carolina Department of Health, and Natural Resources Environment, 4 Printed on Recycled Paper y K d. ~iy State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27604 James B. Hunt, Jr., Governor April 16, 1993 A. Preston Howard, Jr., P.E. Jonathan B. Howes, Secretary Director Bill Adams U.S. Army Corps of Engineers Post Office Box 1890 Wilmington, N.C. 28402-1890 Dear Mr. Adams: Subject: Proposed fill in Wetlands or Waters Upland diked.and open ocean disposal of dredge spoil Brunswick County Project # 93098, COE # 199301088 Upon review of your request for 401 Water Quality Certification to place fill material in waters which are tributary to Atlantic Ocean for return water from upland diked disposal area and ODMS site located at Sunny Point Terminal in Brunswick County, we have determined that the proposed fill can be covered by General Water Quality Certification No. 2668 issued January 21, 1992. A copy of the General Certification is attached. This Certification may be used in qualifying for coverage under Corps of Engineers' Nationwide Permit No. 16. If you have any questions, please contact John Dorney at 919-733-1786 Sincerely, P/reston Howard, Jr. .E. 93098.Itr Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Wilmington Field Office Wilmington DEM Regional Office Mr. John Dorney Central Files Regional Offices Asheville John,,Parelll DCMMooresville Raleigh Washington Wilmington Winston-Salem 704/251-6208 919/486-1541 7041663-1699 9191571-4700 919/946-6481 919/395-3900 919/896-7007 Pollution Prevention Pays P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 An Equal Opportunity Affirmative Action Employer #.: State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management P.O. Box 29535 Raleigh, North Carolina 27626-0535 WATER QUALITY SECTION FAX # (919) 733-1338 TELECOPY TO: FAX NUMBER:- FROM:--PHONE: Ia ?' 8i NUMBER OF PAGES, INCLUDING THE COVER SHEET: j y_r i _. i i TRANSMISSION REPORT ( APR 15 '93 11:56RM ) ******************************************************************************************** * * * * DATE START REMOTE TERMINAL MODE TIME RESULTS TOTAL DEPT. FILE * TIME IDENTIFICATION PAGES CODE NO. * * * * APR 15 11:54AM 919 251 4744 G3E ST 02'00" OK 04 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * DEPARTMENT OF THE ARMY Wilmington District, Corps of Engineers Post Office Box 1890 Wilmington, North Carolina 28402-1890 Action ID. 199301088 February 4, 1993 PUBLIC NOTICE MILITARY TRAFFIC MANAGEMENT COMMAND, MILITARY OCEAN TERMINAL, SUNNY POINT, Southport, North Carolina 28461-5000, has applied for a Department of the Army (DA) permit TO MAINTAIN ACCESS CHANNELS, CONNECTING CHANNELS AND BASINS AND TO TRANSPORT DREDGE MATERIAL FOR OCEAN DISPOSAL ON THE CAPE FEAR RIVER, MILITARY OCEAN TERMINAL, SUNNY POINT, SOUTHPORT, Brunswick County, North Carolina (Figure 1). The following description of work is taken from data provided by the applicant and from studies by the Planning Division, Environmental Resources Branch, Corps of Engineers. Plans submitted with the application show proposed maintenance excavation to remove recurring shoals lying above the elevation of 36 feet below mean low water (MLW) within the Military Ocean Terminal, Sunny Point (MOTSU) navigation facilities (Figure 2). Excavation is to be accomplished by clamshell dredge, hydraulic pipeline dredge, hopper dredge ember thereof. Materials excavated by?hydraulic dredge are to be ufiiped and retai existing diked upland disposal Area 4 (Figure 3). M xials ex va ed by clamshell or hopper dredge are to be transported by scow or dredge hopper, respectively, for disposal within the U.S. „p Environmental Protection Agency (EPA) designated Wilmington Ocean Dredged Material Disposal Site (ODMDS) (Figure 4). Maintenance dredging at MOTSU is necessary almost on an annual basis and necessitates the removal of approximately one million cubic yards of fine grained silts and clays during each dredging cycle. The north basin is not dredged routinely, but it is maintained along with the other basins when required to meet wharfing needs. Maintenance to be accomplished in April 1993 is not to include the north basin. With a hydraulic pipeline dredge and diked upland disposal, maintenance dredging requires about 90 days to complete. A maintenance dredging cycle takes from 120 to 180 days to complete with a clamshell or hopper dredge using ocean disposal. The Wilmington ODMDS (Figure 4), located in ocean waters (contiguous zone) beyond the three nautical mile limit of the territorial sea, was designated by EPA pursuant to Section 102(c) of the Marine Protection Research and Sanctuaries Act of 1972, as amended, as suitable for the ocean disposal of dredged material. The final rule was promulgated by EPA on July 2, 1987 (CFR Vol 52 No. 127) effective August 3, 1987. The Wilmington ODMDS has an area of -2- about 2.3 square nautical miles. Depths within the ODMDS range from 35 to 46 feet below MLW. Disposal of dredged material in the vicinity of the Wilmington ODMDS has occurred for several decades from the maintenance of the lower portion of the Wilmington Harbor Federal Navigation Project (approximately 800,000 cubic yards per year). Since its designation in 1987, the disposal of dredged material has occurred at the ODMDS from the maintenance of MOTSU and from the continued annual maintenance of the' Wilmington Harbor Federal navigation channel (about 2.0 million cubic yards per year). Future disposal at the ODMDS is planned to continue indefinitely in quantities comparable to those reported from 1987 to the present. The capacity of the ODMDS is large enough to accommodate the dredged material. No significant adverse impacts have been observed in the ODMDS. The MOTSU dredged materials are predominantly fine grained silts and clays. Biological and chemical testing of these sediments, in accordance with the EPA/OCE Evaluation of Dredged Material Proposed For Ocean Disposal (Testing Manual), dated February 1991, has been conducted to determine compliance with EPA Ocean Dumping Regulations and Criteria (40 CPR 220-228). These sediment evaluations are provided in the report Ecological Evaluation of Proposed Dredged Material From Wilmington Harbor North Carolina, December 1992. These test results indicate that the sediments are acceptable for ocean disposal under Section 103 of the Marine Protection Research and Sanctuaries Act of 1973, as amended. EPA concurrence with this determination is being requested and must be received before ocean disposal of dredged material can occur. MOTSU will coordinate with the Wilmington District Corps of Engineers and take all necesary actions to ensure that the materials dredged are appropriately placed within the ODMDS. Those actions will include designation of the transportation route to the disposal site, designation of the specific area within the disposal site to be used for the disposal and the requirement that the transportation vessel have a navigation recorder on board to document the disposal locations. Information relative to the effects of hopper dredges on sea turtles and the occurrence of shortnose sturgeons in the Cape Fear River estuary have been identified. As a result, if hopper dredges are used, vessels will be adequately screened and a minimum of 2S% observer coverage will be maintained to document sea turtle or shortnose sturgeon mortalities. The taking of any sea turtles or shortnose sturgeon resulting in injury or death to the animal. will be immediately reported to the National Marine Fisheries Service (NOAA Fisheries) Southeast Regional Office. -3- The discharge of dredged material in the Wilmington ODMDS will take place outside the 3 nautical mile limit of the territorial sea which is regulated under the Marine Protection Research and Sanctuaries Act of 1977, as amended. A Section 401 Water Quality Certificate under the Clean Water Act of 1977, as amended, is not required. The disposal of MOTSU dredged material in diked disposal Area 4 satisfies the terms and conditions of Nationwide Permit 33, CFR 330.5(a)(16) and N.C. Division of Environmental Management General Water Quality Certification No. 1273, issued on November 10, 1978. The only alternative to MOTSU maintenace dredging is the no action alternative. Dredged material disposal alternatives include ocean disposal, diked upland disposal within existing disposal areas, and confined and . unconfined, open water disposal in the Cape Fear River estuary. No new diked disposal areas are available because of ground water constraints set forth in the North Carolina Ground Water Regulations. Existing diked disposal Area 4 is nearly full. MOTSU plans to use disposal Area 4 as a "critical reserve" disposal area. This area will be used when a national security requirement mandates maintenance dredging be performed as quickly as possible, that is, by hydraulic pipeline dredge. Confined and unconfined, open.water disposal in the Cape Fear River estuary is not consistent with policy set forth in the approved North Carolina Coastal Management Program. State and Federal environmental agencies have strongly opposed such open water disposal by MOTSU. As disposal Area 4 has very little remaining disposal capacity, the MOTSU long-term dredging plans for routine maintenance dredging are for clamshell and/or hopper dredging and ocean disposal. The proposed transportation of this dredged material for disposing of it in ocean waters is being evaluated to determine that the proposal will not unreasonably degrade or endanger human health, welfare or amenities or the marine environment, ecological systems or economic potentialities. In making this determination, the criteria established by the Administrator, EPA, pursuant to Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972, as amended, will be applied. In addition, based on an evaluation. of the potential effect which the failure to utilize the ocean disposal site will have on navigation, economic, and industrial development, and foreign and domestic commerence of the United States, an independent determination will be made of the need to dispose of the dredged material in ocean waters, other possible methods of disposal, and other appropriate locations. The purpose of the work is to maintain adequate depth for MOTSU to perform its transportation functions which are important to national security. Continued shoaling in the MOTSU channels and basins would result in a loss of shipping capacity. Plans showing the work are included with this public notice. M -4- The proposed dredging has been evaluated for adherence to the requirements of Executive Order 11988, Flood Plain Management. The proposed maintenance dredging will not induce development in the flood plain. The proposed dredging will maintain harbor navigability. The proposed action has been evaluated under Executive order 11990, Protection of Wetlands. The work will not require dredging or filling of any wetlands. The proposed action is consistent with the approved Coastal Management Program of the State of North Carolina. A MOTSU maintenance dredging program consistency determination, dated March 18, 1983, is on file with the North Carolina Department of Environment, Health and Natural Resources, Division of Coastal Management. State concurrence with the consistency determination was received on August 12, 1983. Established in the March 1983 consistency determination is a coordination procedure with the North Carolina Division of Marine Fisheries and Division of Coastal Management for those times when dredging is required between April 1 and September 30, the State's designated dredging moratorium. EPA prepared a consistency determination, dated September 26, 1983, for the designation for the-continued use of the Wilmington ODMDS. The North Carolina agreement with site designation consistency determination was received October 20, 1983. Approval of this permit will give Federal authorization for maintenance dredging for a period of time not to exceed 10 years from the date of permit issuance. The permittee will be required to present plans to the District Engineer a minimum of 2 weeks prior to commencement of such maintenance Vork. All maintenance would be performed in accordance with Federal, State, and local permits and regulations governing such activities at the time the maintenance is undertaken. This application is being considered pursuant to Section 10 of the River and Harbor Act of 1899 (33 U.S.C. 403), Section 404 of the Clean Water Act (33 U.S.C. 1344), and Section 103 of the Marine Protection, Research, and Sanctuaries Act of 1972 (33 U.S.C. 1413). Any person may request, in writing within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearing shall state, with particularity, the reasons for holding a public hearing. MOTSU maintenance dredging was addressed in the FEIS Maintenance Dredging-of Basins and Channels, Military Ocean Terminal, Sunny Point, Southport, North Carolina, May 1972, the EA Ocean Dumping, Military Ocean Terminal, Sunny Point, Southport, North Carolina, July 1980, and the EA Clamshell Dredging, Military Ocean Terminal, Sunny Point, Southport, North Carolina, September 1984. The potential effects of the-disposal of dredged -5- material within the Wilmington ODMDS were assessed in the FEIS Savannah, GA, Charleston SC and Wilmington NC Ocean Dredged Material Disposal Sites Designation, October 1983. The District Engineer has consulted the latest published version of the National Register of Historic Places for the presence or absence of registered properties, or properties listed as being eligible for inclusion therein, and this worksite is not registered property or property listed as being eligible for inclusion in the Register. Consultation of the National Register constitutes the extent of cultural resource investigations by the District Engineer, and he is otherwise unaware of the presence of such resources. Presently, unknown archeological, scientific, prehistorical, or historical data may be lost or destroyed by work under the requested permit. The District Engineer, based on available information, is not aware that the proposed activity will affect species, or their critical habitat, designated as endangered or threatened pursuant to the Endangered Species Act of 1973. The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the proposed activity.. and its intended use on the public interest. Evaluation of the probable impacts which the proposed-activity may have on the public interest requires a careful weighing of.all those factors which become relevant in each particular case. The benefits which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. The decision whether to'authorize a proposal, and if so the conditions under which it will be allowed to occur, are therefore determined by the outcome of the general balancing process. That decision should reflect the national concern for both protection and utilization of important resources. All factors which may be relevant to the proposal must be considered including the cumulative effects thereof. Among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards and flood plain values (in accordance with Executive Order 11988), land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. For activities involving the placement of dredged or fill materials in waters of the United States, a. permit.will be denied if the discharge that would be authorized by such permit would not comply with the Environmental Protection Agencies, 404(b)(1) guidelines. Subject to the preceding sentence and any other applicable guidelines or_criteria, a permit will be granted unless the District Engineer determines that it would be contrary to the public interest. -6- The U.S. Army Corps of Engineers (USACE) is soliciting comments from the public; Federal, State and local agencies and officials; Indian Tribes and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the USACE to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment (EA) and/or an Environmental Impact Statement (EIS) pursuant to the National Environmental Policy Act (NEPA). Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Written comments pertinent to the proposed work, as outlined above, will be received in this office, Attention: Mr. Rudolph Schiener, until 4:15 p.m., February 22, 1993, or telephone (919) 251-4629. w r Z h,• .( S Z ? ? - , ?/• • :(its » W Y.?• W e N ??r a (3 ? r • ,?? r ? ?yst W •yii y ? ?\S • z 41 z z;s U ar, /O? H HI O Q 0 z ' • r. .i•.r a:Y .'•'f t V oy a:l? 1 QJ • O 72, #f \ i. W W ,y u y' z W W • 0 6 Q O V Y Z 0 t D ' W C7 O w a. 0 Ha o w :: -•: ? z z z•• > i i 3s •? : ? ?u W I I :ti• •: i E? ,? v ?:?:::; off- : •. • ? ? 0 va?' •:• Z :. 3 ••1> " 111 ? 2 W 1z A2 I2 / R e 0 e Q ? U o • 4 C13 H a.'H a H O x N E -r 0 E-4 04 Z:r W W S-4 o zw N° V W a 0 4 >ao N • ? a z?? " E-4 10 rZ4 0 l z '"? 04 n l+ ? v J Z LLJ Z Z O W a_ O z cr- U) yWy.?? ?J A? W w^` W O CCs ?4: ?:. ? t . rrr r.Si{::tom'{•?. q ?r Tl? V 9 J O V J 0 W W W i W J V O V' W m W x !` tll ? ? a: - •r S O O a Z 3:? _2 1 ~0 1 / Q , ; ; o ? a W `•• O2 1? OS Y C -ri 0 0 • Ug. ld + z 4-A 5. - %.D ON OD I'D a rn V ? 04 cr) ?4 C-4 -:r co O O O O O v 4,.:,. ^? laao _ A C;3 o z •: ? 03 0 0 00 C\ o 41 cn -4 -4 cn I)o 40 V4 M i 47 ` o z -Y'• R yayy o ?•! v O i b4 N r •. ((? r/,?? ZZo %' W (? W Ns CA .7 F. a i 0 O U ? 4? MEMORANDUM L5 P; PRINT NAMES:: .. Review???. TO: John Dorney FnTQ Std Planning Branch 3 s:.y3 ?" ?3 SUBJECT: WETLAND STAFF REPORT AND ***EACH ITEM MUST BE ANSWERED (USE N/A FOR ITCT-APPLICABLE) *** PERMIT YR: 93 PERMIT NO: 0000098 COUNTY: BRUNSWICK APPLICANT NAME: MOTSU DREDGE DISPOSAL PROJECT TYPE: DREDGE DISPOSAL PERMIT-TYPE: IND COE_#: 199301088 DOT__#: RCD_FROM _CDA: COE DATE_FRM CDA: 02/09/93 REG_OFFICE: WIRO RIVER_AND_SUB_BASIN_#:0 3 Ole1'7 STREAM_CLASS : G e- STR_INDEX_NO : 00 le-(-71) WL_IMPACT? : Y/O WL_ TYPE : /I/l?' WL_REQUESTED: r14- WL_ACR_EST?: YIN WL SCORE(#): WATER IMPACTED BY FILL?: &N HYDRO_CNECT?: Y/N1111/a- MITIGATION?: Y/() MITIGATION-TYPE: Nlf, MITIGATION_SIZE:,/A'/Iq IS WETLAND RATING SHEET ATTACHED?: Y/0 RECOMMENDATION (Circle One): 6__,__u ISSUE/COND DENY COMMENTS : t,4,tj c? e-. ? /- /_9 qtr-, (_?Cr_Cr cc: Regional Office Central Files DEPARTMENT OF THE ARMY -? 7 Wilmington District, Corps of Engineer f Post Office Box 1890 i 19 Wilmington, North Carolina 28402-1890 E WETLANDS GROUP Action ID. 199301088 PUBLIC NOTICE MILITARY TRAFFIC MANAGEMENT COMMAND, MILITARY OCEAN' TERMINAL, SUNNY POINT, Southport, North Carolina 28461-5000, has applied for a Department of the Army (DA) permit TO MAINTAIN ACCESS CHANNELS, CONNECTING CHANNELS AND BASINS AND TO TRANSPORT DREDGE MATERIAL FOR OCEAN DISPOSAL ON THE CAPE FEAR RIVER, MILITARY OCEAN TERMINAL, SUNNY POINT, SOUTHPORT, Brunswick County, North Carolina (Figure 1). The following description of work is taken from data provided by the applicant and from studies by the Planning Division, Environmental Resources Branch, Corps of Engineers. Plans submitted with the application show proposed maintenance excavation to remove recurring shoals lying above the elevation of 36 feet below mean low water (MLW) within the Military Ocean Terminal, Sunny Point (MOTSU) navigation facilities (Figure 2). Excavation is to be accomplished by clamshell dredge, hydraulic pipeline dredge, hopper dredge or a combination thereof.. Materials excavated by hydraulic dredge are to be pumped and retained in existing diked upland disposal Area 4 (Figure 3). Materials excavated by clamshell or hopper dredge are to be transported by scow or dredge hopper, respectively, for disposal within the U.S. Environmental Protection Agency (EPA) designated Wilmington Ocean Dredged Material Disposal Site (ODMDS) (Figure 4). Maintenance dredging at MOTSU is necessary almost on an annual basis and necessitates the removal of approximately one million cubic yards of fine grained silts and clays during each dredging cycle. The north basin is not dredged routinely, but it is maintained along with the other basins when required to meet wharfing needs. Maintenance to be accomplished in April 1993 is not to include the north basin. With a hydraulic pipeline dredge and diked upland disposal, maintenance dredging requires about 90 days to complete. A maintenance dredging cycle takes from 120 to 180 days to complete with a clamshell or hopper dredge using ocean disposal. The Wilmington ODMDS (Figure 4), located in ocean waters (contiguous zone) beyond the three nautical mile limit of the territorial sea, was designated by EPA pursuant to Section 102(c) of the Marine Protection Research and Sanctuaries Act of 1972, as amended, as suitable for the ocean disposal of dredged material. The final rule was promulgated by EPA on July 2, 1987 (CFR Vol 52 No. 127) effective August 3, 1987. The Wilmington ODMDS has an area of J A l -2- about 2.3 square nautical miles. Depths within the ODMDS range from 35 to 46 feet below MLW. Disposal of dredged material in the vicinity of the Wilmington ODMDS has occurred for several decades from the maintenance of the lower portion of the Wilmington Harbor Federal Navigation Project (approximately 800,000 cubic yards per year). Since its. designation in 1987, the disposal of dredged material has occurred at the ODMDS from the maintenance of MOTSU and from the continued annual maintenance of the Wilmington Harbor Federal navigation channel (about 2.0 million cubic yards per year). Future disposal at the ODMDS is planned to continue indefinitely in quantities comparable to those reported from 1987 to the present. The capacity of the ODMDS is large enough to accommodate the dredged material. No significant adverse impacts have been observed in the ODMDS. The MOTSU dredged materials are predominantly fine grained silts and clays. Biological and chemical testing of these sediments, in accordance with the EPA/OCE Evaluation of Dredged Material Proposed For Ocean Disposal (Testing Manual), dated February 1991, has been conducted to determine compliance with EPA Ocean Dumping Regulations and Criteria (40 CFR 220-228). These sediment evaluations are provided in the report Ecological Evaluation of Proposed Dredged Material From Wilmington Harbor North Carolina, December 1992. These test results. indicate_,.that..the, sediments.: are,. acceptable.-for-ocean-- disposal under Section 103 of the Marine Protection Research and-Sanctuaries Act of 1973, as amended. EPA concurrence with this determination is being requested and must be received before ocean disposal of dredged material can occur. MOTSU will coordinate with the Wilmington District Corps of Engineers and take all necesary actions to ensure that the materials dredged are appropriately placed within the ODMDS. Those actions will include designation of the transportation route to the disposal site, designation of the specific area within the disposal site to be used for the disposal and the requirement that the transportation vessel have a navigation recorder on board to document the disposal locations. Information relative to the effects of hopper dredges on sea turtles and the occurrence of shortnose sturgeons in the Cape Fear River estuary have been identified. As a result, if hopper dredges are used, vessels will be adequately screened and a minimum of 25% observer coverage will be maintained to document sea turtle or shortnose sturgeon mortalities. The taking of any sea turtles or shortnose sturgeon resulting.in injury or.death to. .the animal will be immediately reported to the National Marine Fisheries Service (NOAA Fisheries) Southeast Regional Office. -3- The discharge of dredged material in the Wilmington ODMDS will take place outside the 3 nautical mile limit of the territorial sea which is regulated under the Marine Protection Research and Sanctuaries Act of 1977, as amended. A Section 401 Water Quality Certificate under the Clean Water Act of 1977, as amended, is not required. The disposal of MOTSU dredged material in diked disposal Area 4 satisfies the terms and conditions of Nationwide Permit 33, CFR 330.5(a)(16) and N.C. Division of Environmental Management General Water Quality Certification No. 1273, issued on November 10, 1978. The only alternative to MOTSU maintenace dredging is the no action alternative. Dredged material disposal alternatives include ocean disposal, diked upland disposal within existing disposal areas, and confined and unconfined, open water disposal in the Cape Fear River estuary. No new diked disposal areas are available because of ground water constraints set forth in the North Carolina Ground Water Regulations. Existing diked disposal Area 4 is nearly full. MOTSU plans to use disposal Area 4 as a "critical reserve" disposal area. This area will be used when a national security requirement mandates maintenance dredging be performed as quickly as possible, that is, by hydraulic pipeline dredge. Confined and unconfined, open-water disposal in the Cape _Fear _River - estuary j s not consistent with policy- set- forth--in- the- -- approved North Carolina Coastal Management Program. State and Federal environmental agencies have strongly opposed such open water disposal by MOTSU. As disposal Area 4 has very little remaining disposal capacity, the MOTSU long-term dredging plans for routine maintenance dredging are for clamshell and/or hopper dredging and ocean disposal. The proposed transportation of this dredged material for disposing of it in ocean waters is being evaluated to determine that the proposal will not unreasonably degrade or endanger human health, welfare or amenities or the marine environment, ecological systems or economic potentialities. In making this determination, the criteria established by the Administrator, EPA, pursuant to Section 102(a) of the„Marine Protection Research and Sanctuaries Act of 1972, as amended, will be applied. In addition, based on an evaluation of the potential effect which the failure to utilize the ocean disposal site will have on navigation, economic, and industrial development, and foreign and domestic commerence of the United States, an independent determination will be made of the need to dispose of the dredged material in ocean waters, other possible methods of disposal, and other appropriate locations. The purpose of the work is to maintain adequate depth for MOTSU to perform its transportation functions which are important to national security. Continued shoaling in the MOTSU channels and basins would result in a loss of shipping capacity. Plans showing the work are included with this public notice. -4- The proposed dredging has been evaluated for adherence to the requirements of Executive Order 11988, Flood Plain Management. The proposed maintenance dredging will not induce development in the flood plain. The proposed dredging will maintain harbor navigability. The proposed action has been evaluated under Executive Order 11990, Protection of Wetlands. The work will not require dredging or filling of any wetlands. The proposed action is consistent with the approved Coastal Management Program of the State of North Carolina. A MOTSU maintenance dredging program consistency determination, dated March 18, 1983, is on file with the North Carolina Department of Environment, Health and Natural Resources, Division of Coastal Management. State concurrence with the consistency determination was received on August 12, 1983. Established in the March 1983 consistency determination is a coordination procedure with the North Carolina Division of Marine Fisheries and Division of Coastal Management for those times when dredging is required between April 1 and September 30, the State's designated dredging moratorium. EPA prepared a consistency determination, dated September 26, 1983, for the designation for the continued use of the Wilmington ODMDS. The North Carolina agreement with site designation. consistency determination was received October 20, 1983. Approval of this permit will give Federal authorization for maintenance dredging for a period of time not to exceed 10 years from the date of permit issuance. The permittee will be required-to present plans to,the District Engineer a.minimum of 2 weeks prior to commencement of such maintenance work. All maintenance would be performed in accordance with Federal, State, and local permits and regulations governing such activities at the time the maintenance is undertaken. This application is." being considered pursuant to Section 10 of the River. and Harbor Act of 1899 (33 U.S.C. 403), Section 404 of the Clean Water Act (33 U.S.C. 1344), and Section 103 of the Marine Protection, Research, and Sanctuaries Act of 1972 (33 U.S.C. 1413). Any person may request, in writing within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearing shall state, with particularity, the reasons for holding a public hearing. MOTSU maintenance dredging was addressed in the FEIS Maintenance Dredaina of Basins and Channels, Military Ocean Terminal, Sunny Point Southport, North Carolina, May 1972, the EA Ocean Dumping, Military Ocean Terminal Sunny Point, Southport, North Carolina, July 1980, and the EA .Clamshell Dredging, Military Ocean Terminal, Sunny Point, Southport, North Carolina, September 1984. The potential effects of the disposal of dredged -5- material within the Wilmington ODMDS were assessed in the FEIS Savannah, GA, Charleston SC, and Wilmington, NC, Ocean Dredged Material Disposal Sites Designation, October 1983. The District Engineer has consulted the latest published version of the National Register of Historic Places for the presence or absence of registered properties, or properties listed as being eligible for inclusion therein, and this worksite is not registered property or property listed as being eligible for inclusion in the Register. Consultation of the National Register constitutes the extent of cultural resource investigations by the District Engineer, and he is otherwise unaware of the presence of such resources. Presently, unknown archeological, scientific, prehistorical, or historical data may be lost or destroyed by work under the requested permit. The District Engineer, based on available information, is not aware that the proposed activity will affect species, or their critical habitat, designated as endangered or threatened pursuant to the Endangered Species Act of 1973. The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the proposed activity; and its intended use on the public interest. Evaluation of the probable impacts which the proposed activity may have on the public interest requires a careful weighing of all those factors which become relevant in each particular case. The benefits which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. The: decision whether to authorize a proposal, and if so the conditions under which it will be allowed to occur, are therefore determined by the outcome of the general balancing process. That decision should reflect the national concern, for both protection and utilization of important resources. All factors which may be relevant to the proposal must be considered including the cumulative effects thereof. Among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards and flood plain values (in accordance with Executive Order 11988), land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. For activities involving the placement of dredged or fill materials in waters of the United States, a permit will be denied if the discharge that would be authorized by such permit would not comply with the Environmental Protection Agencies' 404(b)(1) guidelines. Subject-to the preceding sentence and any other applicable guidelines or criteria, a permit will be granted unless the District Engineer determines that it would be contrary to the public interest. Jz' -6- The U.S. Army Corps of Engineers (USACE) is soliciting comments from the public; Federal, State and local agencies and officials; Indian Tribes and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the USACE to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment (EA) and/or an Environmental Impact Statement (EIS) pursuant to the National Environmental Policy Act (NEPA). Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Written comments pertinent to the proposed work, as outlined above, will be received in this office, Attention: Mr. Rudolph Schiener, until 4:15 p.m'., February 22, 1993, or telephone (919) 251-4629. J Z LLJ Z Z 0 Q LLJ U o Z >- Z D cr- (n J b4 7L (1) n? F"'1 0 cs ?-I -el q 1.4 !r"1 A? ??TTWF?1 43 ct U 0 9 ?J J ° W W W Z W J • U fA O W n J I O V O J_I 3 W m W Y 'Cf H Q? 03 V) O cz fJ CCS Q? Q? TJ as 'r O U O w Y - •: N? ;N6 s. 41 e 0 . `? 03 Cdd :0 ON 00 110 ?a O O ch d• _-4 Y =s cn C-4 -zr co 00000 O, m 00 A <: r 1-4 o z _ °J 0 o 00 cy\ o 4J Cf) -4 M r- 00 ,-+ M l? ;~ o°.' '? f cCS )two rI K 2 W () V. H N '• O o 50 0 v i a v ?_ .i z 7 Q - J J Yi O0 1 3 J 3 I ? O 1 • W l? I ?w \ 's P Y 1-LU W .51 . . `` j f •' • to Q • U • O H H ;. ? .. a w Q o z • ? B A} o ? Q . - I %y' ? ? ? V air, IS , - - . 2 _ 2 2 W ? O N O u r rf:;¢t ti M: $4 FC H CQ ` H W 3 z U4 w v+J oz a CV vi. N ? h a z0 W ac u W u•'' 2? Ij a I ? R I o 0 s a :lie;.: <: ? ? ? • ?? ?? ? 93: : l 4-+ .ar o >« W z A ? rfi x ?-i ca U1 0 E-4 a4 H P4 1-4 O O SO? W U H / g ? h a ' r °w e,,. srn? a A •? Glt.M1vaV. RECEIVED. FEB 19 1993 State of North Carolina Wilmington Regional Office Department of Environment, Health, and Natural Resources DEM Division of Coastal Management 225 North McDowell ScRaleigh, North Carolina 27602 Mr. Jim Gregson NC DEH&NR Div. Environmental Management 127 Cardinal Drive Wilmington, NC 28405 /n, ,1 v ?t - _z R ?q p't FES Ty , 4. -- GF`LI?fV ? REFERENCE: ACTID-93-1088 County: Brunswick Applicant/Sponsor: Military Traffic Management Command Maintenance Dredging and Ocean Disposal, MOTSU Dear Mr. Gregson: The attached U.S. Army Corps of Engineers Public Notice, dated 02/04/93 describing a federal project or permit is being circulated to interested State agencies for comments concerning the proposal's consistency with the North Carolina Coastal Management Program. Please indicate your viewpoint on the proposal and return this form to me before 03/03/93. Sin6erely, / /St4een B. Benton Consistency Coordinator REPLY This office objects to the project as proposed. Comments on this project are attached. This office /-s-u1qpVTT'-she project proposal \ No Comment. au0 Signed ` Date Agency L- EEAA 1,1 U P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293 An Equal Opportunity Affirmative Action Employer M EM TO: IUI.,' ` a4A. R?Yler` ? ? , She ?•- DATE: SUBJECT: North Carolina Department of Environment, Health and Natural Resources ® North Carolina Wildlife Resources Commission 512 N. Salisbury Street, Raleigh, North Carolina 27604-1188, 919-733-3391 Charles R. Fullwood, Executive Director MEMORANDUM TO: Steve Benton Consistency Coordinator FROM: Keith W. Ashley, District 4 Fisheries Biologist NC Wildlife Resources Commission DATE: March 3, 1993 SUBJECT: U.S. Army Corps of Engineers Public Notice No. 93- 1088: The Military Traffic Management Command, Maintenance Dredging within the Military Ocean Terminal at Sunny Point (MOTSU), Southport, Brunswick County, North Carolina. As a staff biologist with the North Carolina Wildlife Resources Commission (NCWRC), I have reviewed the subject Public Notice (PN) and am familiar with habitat values associated with the proposed project area. These comments are provided in accordance with provisions of the Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661 et seq.) and North Carolina General Statutes (G.S. 113-131 et seq.). The applicant, the Military Traffic Management Command, is requesting permit authorization to conduct maintenance dredging of access channels, connecting channels, and navigation basins located on the Cape Fear River within the Military Ocean Terminal at Sunny Point (MOTSU). The work will consist of removing all material lying above the plane of 36 feet below mean low water (MLW). Excavation of the spoil material, which consists primarily of fine grained silts and clays, is to be accomplished by either a clamshell dredge, hydraulic pipeline dredge, hopper dredge or a combination thereof. Spoil material excavated by hydraulic dredge are to be pumped and retained in existing diked upland disposal Area #4 while spoil excavated by clamshell or hopper dredge is to be transported for disposal within the designated Wilmington Ocean Dredged Material Disposal Site (ODMDS). Approximately 800,000 cubic yards of spoil material 14 - MEMO TO: Steve Benton Page 2 DATE: March 3, 1993 will be removed. The proposed work is required to maintain an orderly, efficient, and safe flow of traffic from the ocean to the MOTSU port facilities. The shortnose sturgeon "Acipenser brevirostrum", (Federally endangered), and the American alligator "Alligator mississippiensis" (Federally threatened) may occur within the proposed project area. The sturgeon and alligator have been granted protection by the United States Fish and Wildlife Service under Section 7 of the Federal Endangered Species Act (16 U.S.C. 1531-1543). Striped bass (Morone saxatilis), American shad (Alosa sapidissima), and blueback herring (A. aestivalis) also occur in the river in the vicinity of the proposed project site but on a more seasonal basis (March through May). We have serious concerns about the project as presented. We do not object to the proposed dredging provided an ocean certified hydraulic pipeline dredge is used during the life of the project and silt curtains are employed to minimize impacts from turbidity, and sedimentation during construction and to prevent any adverse impacts to the water quality of the Cape Fear River and adjacent wetlands. We also recommend all dredging operations, and especially the pipeline, (if one is employed) be monitored for sediment plumes or leaks and that operations be shut down if conditions warrant. We also favor disposal of spoil material in approved spoil disposal sites and recommend against beach renourishment. We favor ocean disposal of spoil material at the Wilmington Harbor ODMDS site. Although the highground disposal site (upland disposal Area #4) provides nesting sites for colonial sea birds and waterfowl, we do not object to its use for spoil disposal provided all construction activity is timed to avoid the nesting season. Finally, all maintenance dredging should be conducted between September 1 and January 1 to minimize impacts to Federally listed threatened and endangered species and commercially important juvenile marine organisms. We also support any recommendations made by the North Carolina Division of Marine Fisheries regarding the proposed dredging window schedule. Thank you for the opportunity to review and comment on this Public Notice. If we can provide further assistance, please contact NCWRC Habitat Conservation Program Manager Dennis L. Stewart at 919-528-9886 or 919-733-3633, or Keith W. Ashley, NCWRC District 4 Fisheries Biologist at 919-866-4250. cc: Dennis L. Stewart, Habitat Conservation Program Manager Tom Padgett, District 4 Wildlife Biologist ( 3® / V DEPARTMENT OF THE ARMY Wilmington District, Corps of Enginee. Post Office Box 1890 FEB 9 Wilmington, North Carolina 28402-18110x._ Action ID. 199301088 Yevruary 4, PUBLIC NOTICE MILITARY TRAFFIC MANAGEMENT COMMAND, MILITARY OCEAN TERMINAL, SUNNY POINT, Southport, North Carolina 28461-5000, has applied for a Department of the Army (DA) permit TO MAINTAIN ACCESS CHANNELS, CONNECTING CHANNELS AND BASINS AND TO TRANSPORT DREDGE MATERIAL FOR OCEAN DISPOSAL ON THE CAPE FEAR RIVER, MILITARY OCEAN TERMINAL, SUNNY POINT, SOUTHPORT, Brunswick County, North Carolina (Figure 1). The following description of work is taken from data provided by the applicant and from studies by the Planning Division, Environmental Resources Branch, Corps of Engineers. Plans submitted with the application show proposed maintenance excavation to remove recurring shoals lying above the elevation of 36 feet below mean low water (MLW) within the Military ocean Terminal, Sunny Point (MOTSU) navigation facilities (Figure 2). Excavation is to be accomplished by clamshell dredge, hydraulic pipeline dredge, hopper dredge or a combination thereof.. Materials excavated by hydraulic dredge are to be pumped and retained in existing diked upland disposal Area 4 (Figure 3). Materials excavated by clamshell or hopper dredge are to be transported by scow or dredge hopper, respectively, for disposal within the U.S. Environmental Protection Agency (EPA) designated Wilmington Ocean Dredged Material Disposal Site (ODMDS) (Figure 4). Maintenance dredging at MOTSU is necessary almost on an annual basis and necessitates the removal of approximately one million cubic yards of fine grained silts and clays during each dredging cycle. The north basin is not dredged routinely, but it is maintained along with the other basins when required to meet wharfing needs. Maintenance to be accomplished in April 1993 is not to include the north basin. With a hydraulic pipeline dredge and diked upland disposal, maintenance dredging requires about 90 days to complete. A maintenance dredging cycle takes from 120 to 180 days to complete with a clamshell or hopper dredge using ocean disposal. The Wilmington ODMDS (Figure 4), located in ocean waters (contiguous zone) beyond the three nautical mile limit of the territorial sea, was designated by EPA pursuant to Section 102(c) of the Marine Protection Research and Sanctuaries Act of 1972, as amended, as suitable for the ocean disposal of dredged material. The final rule was promulgated by EPA on July 2, 1987 (CFR Vol 52 No. 127) effective August 3, 1987. The Wilmington ODMDS has an area of A , . „ -2- about 2.3 square nautical miles. Depths within the ODMDS range from 35 to 46 feet below MLW. Disposal of dredged material in the vicinity of the Wilmington ODMDS has occurred for several decades from the maintenance of the lower portion of the Wilmington Harbor Federal Navigation Project (approximately 800,000 cubic yards per year). Since its designation in 1987, the disposal of dredged material has occurred at the ODMDS from the maintenance of MOTSU and from the continued annual maintenance of the Wilmington Harbor Federal navigation channel (about 2.0 million cubic yards per year). Future disposal at the ODMDS is planned to continue indefinitely in quantities comparable to those reported from 1987 to the present. The capacity of the ODMDS is large enough to accommodate the dredged material. No significant adverse impacts have been observed in the ODMDS. The MOTSU dredged materials are predominantly fine grained silts and clays. Biological and chemical testing of these sediments, in accordance with the EPA/OCE Evaluation of Dredged Material Proposed For Ocean Disposal (Testing Manual), dated February 1991, has been conducted to determine compliance with EPA Ocean Dumping Regulations and Criteria (40 CPR 220-228). These sediment evaluations are provided in the report Ecological Evaluation of Proposed Dredged Material From Wilmington Harbor North Carolina. December 1992. These test results indicate that the sediments are acceptable for ocean disposal under Section 103 of the Marine Protection Research and Sanctuaries Act of 1973, as amended. EPA concurrence with this determination is being requested and must be received before ocean disposal of dredged material can occur. MOTSU will coordinate with the Wilmington District Corps of Engineers and take all necesary actions to ensure that the materials dredged are appropriately placed within the ODMDS. Those actions will include designation of the transportation route to the disposal site, designation of the specific area within the disposal site to be used for the disposal and the requirement that the transportation vessel have a navigation recorder on board to document the disposal locations. Information relative to the effects of hopper dredges on sea turtles and the occurrence of shortnose sturgeons in the Cape Fear River estuary have been identified. As a result, if hopper dredges are used, vessels will be adequately screened and a minimum of 25% observer coverage will be maintained to document sea turtle or shortnose sturgeon mortalities. The taking of any sea turtles or shortnose sturgeon resulting in injury or death to the animal will be immediately reported to the National Marine Fisheries Service (NOAA Fisheries) Southeast Regional office. r R -3- The discharge of dredged material in the Wilmington ODMDS will take place outside the 3 nautical mile limit of the territorial sea which is regulated under the Marine Protection Research and Sanctuaries Act of 1977, as amended. A Section 401 Water Quality Certificate under the Clean Water Act of 1977, as amended, is not required. The disposal of MOTSU dredged material in diked disposal Area 4 satisfies the terms and conditions of Nationwide Permit 33, CFR 330.5(a)(16) and N.C. Division of Environmental Management General Water Quality Certification No. 1273, issued on November 10, 1978. The only alternative to MOTSU maintenace dredging is the no action alternative. Dredged material disposal alternatives include ocean disposal, diked upland disposal within existing disposal areas, and confined and . unconfined, open water disposal in the Cape Fear River estuary. No new diked disposal areas are available because of ground water constraints set forth in the North Carolina Ground Water Regulations. Existing diked disposal Area 4 is nearly full. MOTSU plans to use disposal Area 4 as a "critical reserve" disposal area. This area will be used when a national security requirement mandates maintenance dredging be performed as quickly as possible, that is, by hydraulic pipeline dredge. Confined and unconfined, open-water disposal in the Cape Fear River estuary is not consistent with policy set forth in the approved North Carolina Coastal Management Program. State and Federal environmental agencies have strongly opposed such open water disposal by MOTSU. As disposal Area 4has very little remaining disposal capacity, the MOTSU long-term dredging plans for routine maintenance dredging are for clamshell and/or hopper dredging and ocean disposal. The proposed transportation of this dredged material for disposing of it in ocean waters is being evaluated to determine that the proposal will not unreasonably degrade or endanger human health, welfare or amenities or the marine environment, ecological systems or economic potentialities. In making this determination, the criteria established by the Administrator, EPA, pursuant to Section 102(a) of the„Marine Protection Research and Sanctuaries Act of 1972, as amended, will be applied. In addition, based on an evaluation of the potential effect which the failure to utilize the ocean disposal site will have on navigation, economic, and industrial development, and foreign and domestic commerence of the United States, an independent determination will be made of the need to dispose of the dredged material in ocean waters, other possible methods of disposal, and other appropriate locations. The purpose of the work is to maintain adequate depth for MOTSU to perform its transportation functions which are important to national security. Continued shoaling in the MOTSU channels and basins would result in a loss of shipping capacity. Plans showing the work are included with this public notice. A , % , -4- The proposed dredging has been evaluated for adherence to the requirements of Executive order 11988, Flood Plain Management. The proposed maintenance dredging will not induce development in the flood plain. The proposed dredging will maintain harbor navigability. The proposed action has been evaluated under Executive Order 11990, Protection of Wetlands. The work will not require dredging or filling of any wetlands. The proposed action is consistent with the approved Coastal Management Program of the State of North Carolina. A MOTSU maintenance dredging program consistency determination, dated March 18, 1983, is on file with the North Carolina Department of Environment, Health and Natural Resources, Division of Coastal Management. State concurrence with the consistency determination was received on August 12, 1983. Established in the March 1983 consistency determination is a coordination procedure with the North Carolina Division of Marine Fisheries and Division of Coastal Management for those times when dredging is required between April 1 and September 30, the State's designated dredging moratorium. EPA prepared a consistency determination, dated September 26, 1983, for the designation for the continued use of the Wilmington ODMDS. The North Carolina agreement with site designation consistency determination was received October 20, 1983. Approval of this permit will give Federal authorization for maintenance dredging for a period of time not to exceed 10 years from the date of permit issuance. The permittee will be required-to present plans to the District Engineer a_minimum of 2 weeks prior to commencement of such maintenance work. All maintenance would be performed in accordance with Federal, State, and local permits and regulations governing such activities at the time the maintenance is undertaken. This application is... being considered pursuant to Section .10 of the River and Harbor Act of 1899 (33 U.S.C. 403), Section 404 of the Clean Water Act (33 U.S.C. 1344), and Section 103 of the Marine Protection, Research, and Sanctuaries Act of 1972 (33 U.S.C. 1413). Any person may request, in writing within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearing shall state, with particularity, the reasons for holding a public hearing. MOTSU maintenance dredging was addressed in the FEIS Maintenance Dredging of Basins and Channels, Military ocean Terminal, Sunny Point, Southport, North Carolina, May 1972, the EA Ocean Dumping, Military Ocean Terminal Sunny Point, Southport, North Carolina, July 1980, and the EA Clamshell Dredging Military Ocean Terminal, Sunny Point, Southport, North Carolina, September 1984. The.potential effects of the disposal of dredged . , a -5- material within the Wilmington ODMDS were assessed in the FEIS Savannah, GA, Charleston SC and Wilmington NC Ocean Dredged Material Disvosal Sites Designation, October 1983. The District Engineer has consulted the latest published version of the National Register of Historic Places for the presence or absence of registered properties, or properties listed as being eligible for inclusion therein, and this worksite is not registered property or property listed as being eligible for inclusion in the Register. Consultation of the National Register constitutes the extent of cultural resource investigations by the District Engineer, and he is otherwise unaware of the presence of such resources. Presently, unknown archeological, scientific, prehistorical, or historical data may be lost or destroyed by work under the requested permit. The District Engineer, based on available information, is not aware that the proposed activity will affect species, or their critical habitat, designated as endangered or threatened pursuant to the Endangered Species Act of 1973. The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the proposed activity and its intended use on the public interest. Evaluation of the probable impacts which the proposed activity may have on the public interest requires a careful weighing of all those factors which become relevant in each particular case. The benefits which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. The decision whether to authorize a proposal, and if so the conditions under which it will be allowed to occur, are therefore determined by the outcome of the general balancing process. That decision should reflect the national concern for both protection and utilization of important resources. All factors which may be relevant to the proposal must be considered including the cumulative effects thereof. Among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards and flood plain values (in accordance with Executive Order 11988), land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. For activities involving the placement of dredged or fill materials in waters of the United States, a permit will be denied if the discharge that would be authorized by such permit would not comply with the Environmental Protection Agencies, 404(b)(1) guidelines. Subject-to the preceding sentence and any other applicable guidelines or criteria, a permit will be granted unless the District Engineer determines that it would be contrary to the public interest. i . . o -6- The U.S. Army Corps of Engineers (USACE) is soliciting comments from the public; Federal, State and local agencies and officials; Indian Tribes and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the USACE to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment (EA) and/or an Environmental Impact Statement (EIS) pursuant to the National Environmental Policy Act (NEPA). Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Written comments pertinent to the proposed work, as outlined above, will be received in this office, Attention: Mr. Rudolph Schiener, until 4:15 p.m'., February 22, 1993, or telephone (919) 251-4629. N '. = i ?.'? bf O 77yy Z 7 Q ? j:i* = V O _J i 2 J_ 3 I? N S ;•. I W n W ,` I Ow m us M ?,~ . ? v D is, U H H ?? ?O a •svr M t -lam ° ,'? J ((1J??.?sj??v./]j? • O M 7s I ?,? :;l A sru W ? w 0 ' u ILQ Y w Y Y Y t z ? z 0 w 0 W Q w a 3 O H e Z V i1 Z' V 2! P W e' r j 12 E o 0 0 U o cri ao cl w z > x H #C E-4 0 x ?-i A to P4 3: ° O H ,4 H r i H E4 04 ? U A S"'a W ? d ? i [ r i r > 1.4 z 44 0 00 H U w Hxa . 004 P4 N ? z 0 4 H O W a Z lV ° . w W H a O W W D .hr ° ?Q•?` • Z 2 i 90 Z I l P Z w ? Z ~ Q O w °- O ? Z ? Z Q ? J N b.A 'L3 N i-a A a? 0 --j mill q . rl CIS N w Cd U 0 ?9 16 J ° W ' W W J U O J W d' A a? m col O ca. En U Cti C Q? rj J} U s.. v i? 0 U 0 M 4J V-4 r J i V = 3 a _ e ? s 11 1 a s Y a t 00 c?Q ?O ON co%O W %?s 0 Cn .boeh-.1 -4 O _ 4 ;' Qr 00000 v -? ta co s f' : -03 o z a ; is a? 0 C> (30 0% a c.- oo n co It cn e? A u f?f' `V" U O s.i? 'Lfv •id C? QQ M?t?i -???- 111111 -J W () CL 7t O ` a O u v