Loading...
HomeMy WebLinkAbout20060080 Ver 1_More Info Received_20060127Malpass & Associates Engineering and Planning 1645 EaQ Arlington Boulevard `.?tito P Cat: ? nvillt. N(. 27858 "l: oe-!252) 756-1! 3k. F ., (252) 756-209,5 email jamie(n)ma[pas sandassociat-: To: NCDENR Letter of Transmittal Date: 1262006 Attention: SAM AGHIMIEN Re: FERGUSON Job No. P-806 NCDWQ-401 DIVISION 2321 CRABTREE BLVD RALEIGH, NC 27604 WE ARE SENDING YOU: ? Attached ? Under separate cover via ? Shop Drawings ? Prints ? Plans ? Samples ? Copy of Letter ? Change Order ? Qr=c?r=o? JAN 2 7 &'.; the following items DENR - WATER QUAi.. WETLANDS AND STORMWATER,;- ? Specifications Date No. 1 125/2006 Ferguson: Wet Detention Worksheet 1 1252006 Ferguson Construction Plan Sheet 4 of 6 THESE ARE TRANSMITTED As Checked Below: ? For Approval ? Approved As Submitted ? Resubmit copies for approval ? For Your Use ? Approved As Noted ? Submit copies for distribution ? As requested ? Returned for corrections ? Return corrected prints ? For review and comment ? ? FOR BIDS DUE ? PRINTS RETURNED AFTER LOAN TO US REMARKS The construction plan has been revised to increase the forebay volume. The Operation and Maintenance agreement will be coming directly to you from the owner. COPY TO: File -9 on SIGNED: If enclosures are not as noted, kindly notify us at once. a gg ?v U JAN `Z 1 N06 Project No. DWQ ZtwAS R i U-AUTV/ ke provided by DWO WE fLWS AND STAB DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. 1. PROJECT INFORMATION (please complete the following information): Project Name : Ferguson Enterprises Inc. Contact Person: Jamie Midgette Phone Number: ( 252 ) 756-1780 For projects with multiple basins, specify which basin this worksheet applies to: Basin Bottom Elevation 69.0 ft. (average elevation of the floor of the basin) Permanent Pool Elevation 74.0 ft. (elevation of the orifice invert out) Temporary Pool Elevation 74.9 ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area 11,150 sq. ft. (water surface area at permanent pool elevation) Drainage Area 6.25 ac. (on-site and off-site drainage to the basin) Impervious Area 4.75 ac. (on-site and off-site drainage to the basin) Permanent Pool Volume 16,629 cu. ft (combined volume of main basin and forebay) Temporary Pool Volume 10,450 cu. ft. (volume detained on top of the permanent pool) Forebay Volume 3,312 cu. ft. SA/DA used 4.0 (surface area to drainage area ratio) Diameter of Orifice 2.5 in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. Applicants Initials 'VI The temporary pool controls runoff from the I inch storm event. 1?t The basin length to width ratio is greater than 3:1. ,1?L1 The basin side slopes are no steeper than 3:1. ?cM A submerged and vegetated perimeter shelf at less than 6:1 is provided. rat Vegetation to the permanent pool elevation is specified. An emergency drain is provided to drain the basin. Try The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). The temporary pool draws down in 2 to 5 days. The forebay volume is approximately equal to 20% of the total basin volume. i'f Sediment storage is provided in the permanent pool. Access is provided for maintenance. A minimum 30-foot vegetative filter is provided at the outlet. /J,2t A site specific operation and maintenance (O&M) plan is provided. !?1 A vegetation management/mowing schedule is provided in the O&M plan. 7yir Semi-annual inspections are specified in the O&M plan. A debris check is specified in the O&M plan to be performed after every storm event. A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. A responsible party is designated in the O&M plan. FOR SWG100 09/97 Page 1 of 1 • Emergency drainage of the basin will be accomplished using pumps. • The vegetative filter at the outlet is replaced with the wetland area and bioretention area. Malpass & Associates Engineering and Planning 1645 FE-.t A.riin(iton €'otilevard =>taite it metiville. NC 27858 `t-'11i?m , (252) 756-1780 Fa y {752} 717 CI-2098 email jainie((r ,maInassandassoc.iates Letter of Transmittal Date: 1252006 Attention: SAM AGHIMIEN Re: HUDSON INDUSTRIAL BUILDING Job No. P-809 O?NR? UJskR To: NCDENR NCDWQ-401 DIVISION 2321 CRABTREE BLVD RALEIGH, NC 27604 WE ARE SENDING YOU: ? Shop Drawings ? Copy of Letter © Attached ? Prints ? Change Order ? Under separate cover via ? Plans ? the following items Samples ? Specifications Coies Date No. Description 1252006 Hudson Industrial Buildin : Wetland Worksheet r 1/242006 Hudson Industrial Buildin : O eration and Maintenance a reement 1 1252006 Hudson Industrial Buildin : Construction Plan sheet 4 of 7 THESE ARE TRANSMITTED As Checked Below: ? For Approval ? Approved As Submitted ? For Your Use ? Approved As Noted ® As requested ? Returned for corrections ? For review and comment ? ? FOR BIDS DUE ? Resubmit copies for approval ? Submit copies for distribution ? Return corrected prints ? PRINTS RETURNED AFTER LOAN TO US REMARKS The construction plan has been revised to show the forebays at the flared end sections. COPY TO: File SIGNED: If enclosures are not as noted, kindly notify us at once. DWQ Project No. JAN 7 2006 DIVISION OF WATER QUALITY - 401 EXTENDED DETENTION (and POCKET*) WETLAND WOP%§kWMATER QUALITY I. PROJECT INFORMATION (please complete the following information): Project Name : Hudson Industrial Buildinq Contact Person: Jamie Midgette Phone Number: ( 252 ) 756-1780 For projects with multiple basins, specify which basin this worksheet applies to: Permanent Pool Elevation 19.0 ft. (elevation of the orifice invert out) Temporary Pool Elevation 19.7 ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area 4,889 sq. ft. (water surface area at permanent pool elevation) Drainage Area 1.9 ac. (on-site and off-site drainage to the basin) Impervious Area 1.12 ac. (on-site and off-site drainage to the basin) Forebay Surface Area 775 sq. ft. (at permanent pool elevation approximately 15%)* Marsh 0"-9" Surface Area 1,765 sq. ft. (at permanent pool elevation approximately 35%)* Marsh 9"-18" Surface Area 1,549 sq. ft. (at permanent pool elevation approximately 35%)* Micro Pool Surface Area 800 sq. ft. (at permanent pool elevation approximately 15%)* Temporary Pool Volume 2,759 cu. ft (volume detained on top of the permanent pool) SAIDA used 2.37 (surface area to drainage area ratio)* Diameter of Orifice 0.875 in (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project A licants Initials The temporary pool controls runoff from the 1 inch rain. ?t The basin side slopes are no steeper than 3:1. A planting plan for the marsh areas with plant species and densities is provided. ,a Vegetation above the permanent pool elevation is specified. An emergency drain is provided to drain the basin. The temporary pool draws down in 2 to 5 days. Sediment storage is provided in the permanent pool. A sediment disposal area is provided. Access is provided for maintenance. A site specific, signed and notarized operation and maintenance agreement is provided. The drainage area (including any offsite area) is delineated on a site plan. 4 Access is provided for maintenance. Plan details for the wetland are provided. Plan details for the inlet and outlet are provided. A site specific operation and maintenance agreement, signed and notarized by the responsible party is provided (see http://h2o.ehnr.state.nc.us/ncwetlands/oandm.doc). * Pocket Wetlands have different design parameters and are only assumed to remove 35% TSS - See pp. 19 and 20 of the NC DENR Stormwater BMP Manual, April 1999. 10% open water, 50% high marsh, 40% low marsh. * Due to the relatively flat topography, the emergency draining of the wetland will have to be accomplished via pumping. WETLAND DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wetland detention basin system is defined as the wetland detention basin, pretreatment including forebays and the vegetated filter if one is provided. Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wetland detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wetland detention basin if the elevation of the marsh areas exceeds the permanent pool elevation (19.0'). This shall be performed by removing the upper 6 inches of soil and stockpiling it. Then the marsh area shall be excavated six inches below design elevations. Afterwards the stockpiled soil should be spread over the marsh surface. The soil should not be stockpiled for more than two weeks. Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wetland detention basin or stream, etc.). 5. Wetland planting densities in the marsh areas should be maintained by replanting/reseeding bare areas as needed. Wetland plants should be encouraged to grow in the marsh areas. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wetland detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: James H. Hudson Title: Owner Address: P.O. Box 2060: Greenville, NC 27858 Phon Signe Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of do hereby certify that \c 4,19.1 // AJ?o? personally appeared before me thisZ? day of and acknowledge the due execution of the forgoing wet [wetland] detention basin maintenance requirements. Witness my hand and official seal, ?jTARY• N% to G d SEAL My commission expires vas Z5Y 20 46 0G 02 08p Ken Malpass 252-756-2098 Malpass & Associates 1645 East Arlington Blvd. Suite D Cire?mville, NC 27858 Fax Cover Sheet DATE: January 27, 2006 TIME: 2:08:34 PM TO: Sam Aghimien PHONE: (919) 733-3574 NCDENR-DWO-401 FAX: (919) 733-6893 FROM: Jamie Midgette PHONE: (252) 756-1780 FAX: (252) 756-2098 RE: FERGUSON ENTERPRISES, INC Number of pages including cover sheet: 2 Please call if you have any questions. Thanks JHIJ-E7-2lUF16 FRI 14:0 TEL:9197336"g3 FJAME:D1,10-IJETLH-HDS P.1 P. i M 02:090 Ken Malpass 252-756-2098 p.2 11'rc*ct No. DWQ-_ (to be provided ?y DWQ_) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET 1) ', Stormyq ter Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agieement. An incomplete submittal paukage will result in a request for additional information and wil I substantially delay final review and approval of the prL ject. 1. PROJECT INFORMATION (please complete the following information): Project Name : Ferguson Enterprises Inc_ _ _ _ - - Contact Person: Jamie Mid&,ette Phone Number: U?521 756-_1.780 For projects with multiple basins, specify which basin this worksheet applies to: Basin Bottom Elevation 69.0 ft. (average elevation of the floor of the basin) Permanent Pool Elevation 74.0 ft. (elevation of the orifice invert out) Temporary Pool Elevation 74.9 ft. (elevation ofthe outlet structure invert in) Permanent Pool Surface Area 11,150_ - sq. fft. (water surface area at pennanent pool elevation) Drainagc Area 6.25 ac. (on-site and off-site drainage to the basin) Impervious Area 4.75 _ ac. (on-site and off site drainage to the basin) Permanent Pool Volume 33,000 cu. ft (combined volume of main basin and R)rebay) Temporary fool Volume 17,000 cu. ft. (volume detained on top of the permanent pool) Forebav Volume 0,000 cu. ft. SA/DA used 4.0 (surface area to drainage area ratio) Diameter of Orifice _ 2.0 in. (draw down orifice diameter) 11. REQUIRED ITEMS CHECKLIST The lbliowing checklist outlines design requirements per the Stormwater Best Management. Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section; 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach afi explanation rif ?vhV. A 1. licants Initials 1'he temporary pool controls runoff from the 1 inch storm event. -% The basin length to width ratio is greater than 3:1 _ The basin side slopes are no steeper than 3:1. A submerged and vegetated perimeter shelf at less than 6:1 is provided. Vegetation to the permanent pool elevation is specified. __An emergency drain is provided to drain the basin. --_The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). i _-__The temporary pool draws down in 2 to 5 days. -z , The forebay volume is approximately equal to 20% of the total basin volume, T' Sediment storage is provided in the permanent pool. Access is provided for maintenance. _ ___A minimum 30-foot vegetative filter is provided at the outlet. o., _ A site specific operation and maintenance (O&M) plan is provided. /! e A vegetation managementlmowing schedule is provided in the O&M plan. Semi-annual inspections are specified in the O&M plan. -- A debris check is specified in the O&M plan to be performed after every storm event. A specific sediment clean-out benchmark is listed (elevation or depth) in O&M Plan. _A responsible party is designated in the O&M plan. F0kM S W G I t,'0 09/97 Page 1 of 1 JOH-2i-2tiDD FPI 14:01 TEL:9197336893 1JAME:DWr-WETLANDS F. 2 Project Name: Ferguson enterprises Project No. DWQ Pond No. SUBMITTED DESIGN: 1 REQUIRED DESIGN: 1/27/2006 elevations` 0 average depth status Bottom of Basin (ft) 69 Permanent Pool (ft) 74 5 ft. depth ok Temporary Pool (ft) 74.9 0.9 ft. depth ok areas Permanent Pool SA (sq ft) 11150 6142 sq. ft. ok Drainage Area (ac) 6.25 r". 1g4_ 8! on avg depth ok Impervious Area (ac) 4.75 76.0 % - volumes Permanent Pool (cu ft) 33000 Temporary Pool (cu ft) 17000 16653 cu. ft. ok Forebay (cu ft) 6000 18.2 % ok other parameters SA/DA 4 2.26 - Orifice Diameter (in) 2 0.07 cfs drawdown - Design Rainfall (in) 1 2.8 day drawdown ok Linear Interpolation of Correct SAIDA * * * 5 ft. Permanent Pool Depth % Impervious SA/DA fron (Avg. Depth) Next Lowest 70 2.07 2.109955157 1.08 Project Impervious 76.0 2.26 129 1.29 Next Highest 80 2.38 2.418340807 1.43 3ft 4 Project Name: Ferguson enterprises Project No. DWQ Pond No. SUBMITTED DESIGN: 1 REQUIRED DESIGN: 1/27/2006 elevations '1 }5 average depth status Bottom of Basin (ft) 69 Permanent Pool (ft) 74 5 ft. depth ok Temporary Pool (ft) 74.9 0.9 ft. depth ok areas Permanent Pool SA (sq ft) 11150 6142 sq. ft. ok Drainage Area (ac) 6.25 based on avg depth ok Impervious Area (ac) 4.75 76.0 % - volumes Permanent Pool (cu ft) 16629 Temporary Pool (cu ft) 10450 16653 cu, ft. check tempo Forebay (cu ft) 3312 19.9 % ok other parameters SA/DA 4 2.26 - Orifice Diameter (in) 2.5 0.11 cfs drawdown - Design Rainfall (in) 1 1.1 day drawdown check drawn Linear Interpolation of Correct SAIDA * * * 5 ft. Permanent Pool Depth % Impervious SA/DA fron (Avg. Depth) Next Lowest 70 2.07 3.563523767 1.08 Project Impervious 76.0 2.26 r", 1.29 Next Highest 80 2.38 3.813179372 1.43 3'ft 4