Loading...
HomeMy WebLinkAbout20140914 Ver 1_W-5107_Bawdy__Quicosin_Swamp Closeout Request_20190712STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Roy COOPER GOVERNOR July 8, 2019 Mr. Tom Steffens 2407 West 5th Street Washington, NC 27889-1000 JAMEs H. TROGDON, III SECRETARY Re: Bawdy & Quicosin Swamp Mitigation Sites, Johnston County, TIP No. W-5107, Action ID No. SAW-2010-01219; DWR Project No. 20140914 Mr. Steffens, As you are aware, the Department has monitored the Bawdy & Quicosin Swamp mitigation sites since their construction in March of 2017. The Bawdy & Quicosin Swamp mitigation sites are located at the intersection of US 70 and US 70 business (Site 3) and Sites 5, 6 and 7 are located at the intersection of US 70 and Davis Mill road. The sites were constructed and planted in March of 2017. The sites provide 350 linear feet of stream relocation and buffer restoration of 18,314 ft2 in Zone 1 and 10,769 ft2 in Zone 2 to offset impacts associated with the W-5107 project. Per the permit requirements, NCDOT was required to visually monitor the vegetative plantings to assess and ensure complete stabilization of the mitigation stream segments for three years or until success criteria were met. During the monitoring period, annual monitoring reports were submitted to the appropriate regulatory agencies via the Environmental Analysis Unit (EAU) website: hges: //connect. ncdot. aov/resources/Environmental/Pages/Permits-and-Mitigation. aspx After three years of vegetation and stream stability monitoring, the Bawdy & Quicosin Swamp stream restoration sites indicates that the planted vegetation is surviving, and the streambanks remain stable at this time. Individual annual monitoring reports are available on EAU's website for 2017-2018. Mailing Address: NC DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL ANALYSIS UNIT 1598 MAIL SERVICE CENTER RALEIGH, NC 27699-1598 Telephone: (919) 707-6000 Fax: (919) 212-5785 Customer Service: 1-877-368-4968 Website: www.ncdot.gov Location: CENTURY CENTER BUILDING A 1020 BIRCH RIDGE DRIVE RALEIGH, NC 27610 A site visit was conducted on June 25th, 2019 with the regulatory agencies and NCDOT personnel present. It was determined at that meeting that the site success criteria had been met and that no further monitoring would be required. During the on -site meeting, NCDOT was requested to provide the 2019 monitoring data with the closeout request letter. The requested information will be included as an attachment to this letter. NCDOT requests that the appropriate resource agencies provide documentation stating that no further monitoring is required and that the site is closed. If you have any questions about this project, please contact Mr. Randy Griffin at (919) 707-6121. Sincerely, DocuSigned by: Gam. for BBBFC9470D9E461... Philip S. Harris, III, P.E., Unit Head Environmental Analysis Unit cc: Ms. Amy Chapman, NCDWR Mr. Monte Matthews, USACOE Mr. Eric Alsmeyer, USACOE Mr. Rob Ridings, NCDWR Mr. Travis Wilson, NCWRC Mr. Todd Bowers, USEPA Mr. Gary Jordan, USFWS Mr. David Harris, P.E., NCDOT-REU Mr. Chad Coggins, NCDOT-DEO 4 Mr. Randy Griffin, NCDOT-EAU