July 8, 2019
Mr. Tom Steffens
2407 West 5th Street
Washington, NC 27889-1000
JAMEs H. TROGDON, III
SECRETARY
Re: Bawdy & Quicosin Swamp Mitigation Sites, Johnston County, TIP No. W-5107, Action
ID No. SAW-2010-01219; DWR Project No. 20140914
Mr. Steffens,
As you are aware, the Department has monitored the Bawdy & Quicosin Swamp mitigation sites
since their construction in March of 2017. The Bawdy & Quicosin Swamp mitigation sites are
located at the intersection of US 70 and US 70 business (Site 3) and Sites 5, 6 and 7 are located
at the intersection of US 70 and Davis Mill road. The sites were constructed and planted in
March of 2017. The sites provide 350 linear feet of stream relocation and buffer restoration of
18,314 ft2 in Zone 1 and 10,769 ft2 in Zone 2 to offset impacts associated with the W-5107
project. Per the permit requirements, NCDOT was required to visually monitor the vegetative
plantings to assess and ensure complete stabilization of the mitigation stream segments for three
years or until success criteria were met.
During the monitoring period, annual monitoring reports were submitted to the appropriate
regulatory agencies via the Environmental Analysis Unit (EAU) website:
hges: //connect. ncdot. aov/resources/Environmental/Pages/Permits-and-Mitigation. aspx
After three years of vegetation and stream stability monitoring, the Bawdy & Quicosin Swamp
stream restoration sites indicates that the planted vegetation is surviving, and the streambanks
remain stable at this time. Individual annual monitoring reports are available on EAU's website
for 2017-2018.
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
ENVIRONMENTAL ANALYSIS UNIT
1598 MAIL SERVICE CENTER
RALEIGH, NC 27699-1598
Telephone: (919) 707-6000
Fax: (919) 212-5785
Customer Service: 1-877-368-4968
Website: www.ncdot.gov
Location:
CENTURY CENTER BUILDING A
1020 BIRCH RIDGE DRIVE
RALEIGH, NC 27610
A site visit was conducted on June 25th, 2019 with the regulatory agencies and NCDOT
personnel present. It was determined at that meeting that the site success criteria had been met
and that no further monitoring would be required. During the on -site meeting, NCDOT was
requested to provide the 2019 monitoring data with the closeout request letter. The requested
information will be included as an attachment to this letter. NCDOT requests that the
appropriate resource agencies provide documentation stating that no further monitoring is
required and that the site is closed. If you have any questions about this project, please contact
Mr. Randy Griffin at (919) 707-6121.
Sincerely,
DocuSigned by:
Gam.
for BBBFC9470D9E461...
Philip S. Harris, III, P.E., Unit Head
Environmental Analysis Unit
cc: Ms. Amy Chapman, NCDWR
Mr. Monte Matthews, USACOE
Mr. Eric Alsmeyer, USACOE
Mr. Rob Ridings, NCDWR
Mr. Travis Wilson, NCWRC
Mr. Todd Bowers, USEPA
Mr. Gary Jordan, USFWS
Mr. David Harris, P.E., NCDOT-REU
Mr. Chad Coggins, NCDOT-DEO 4
Mr. Randy Griffin, NCDOT-EAU