Loading...
HomeMy WebLinkAbout20061848 Ver 1_Approval Letter_20070105O~O~WAT F9~G r ~_ ~ D '~ Timber Point Properties, LLC 240 Craven Street New Bern, NC 28560 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources January 5, 2007 Alan W. Klimek, P.E. Director Division of Water Quality DWQ Project # 06-1848 Pamlico County Subject Property: Timber Point Subdivision Mason Creek [030413, 27-150-9, SC, SW, HQW, NSW] Approval of 401 Water Quality Certification and Authorization Certificate per the Neuse River Buffer Protection Rules (15A NCAC 2B .0233) with Additional Conditions Dear Sir or Madam: You have our approval, in accordance with the attached conditions and those listed below, to shade 0.1047 acres of open water, shade 0.0247 acres open water, shade 0.0068 acres of coastal wetland, and fi110.0074 acres of 404/wetland, and 180 square feet of Zone 1 Neuse River basin protected riparian buffers and 120 square feet of Zone 2 Neuse River basin protected riparian buffers, for the purpose of constructing the 10-slip community docking facility and wood chip access path in Timber Point. subdivision at the subject property, as described within your application dated July 10, 2006, and received by the N.C. Division of Water Quality (DWQ) on November 27, 2006. After reviewing your application, we have determined that the Division of Water Quality (DWQ) General Water Quality Certification Number 3400 covers these water impacts. This Certification allows you to General Permit No. 198000291 when issued by the US Army Corps of Engineers (USAGE). This letter shall also act as your approved Authorization Certificate for impacts to the protected riparian buffers per 15A NCAC 2B .0233. In addition, you should get or otherwise comply with any other federal, state and local requirements before you go ahead with your project including (but not limited to) erosion and sediment control regulations and CAMA. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or LAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 1501inear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 401 Oversight/Express Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 / Internet: http~J/h2o enr state nc.us/ncwetlands None Carolina ~atura!!y An Equal Opportunity/Affirmative Action Employer- 50% Recycled/]0% Post Consumer Paper Timber Point Properties, LLC Page 2 of 4 January 5, 2007 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount A roved (Units) Plan Location or Reference O en water 0.1047 acres -shade DCM Field Investi ation Re ort O en water 0.0247 acres -shade DCM Field Investi ation Re ort Coastal wetland 0.0068 acres -shade DCM Field Investi ation Re ort 404/Wetland 0.0074 acres -shade DCM Field Investi ation Re ort Buffer -Zone 1 180 s uare feet DCM Field Investi ation Re ort Buffer -Zone 2 120 (s uare feet) DCM Field Investi ation Re ort Sediment and Erosion Control: 2. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 3. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the 404/401 Permit Application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur; 4. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project; 5. Protective Fencing -The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15 NCAC 2H, Section .0500; Timber Point Properties, LLC Page 3 of 4 January 5, 2007 6. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected stream buffers such that it will not re- concentrate before discharging into a stream as identified within 15A NCAC 2B .0259 (5). If this is not possible, it may be necessary to provide stormwater facilities that are considered to remove nitrogen. This may require additional approval from this Office. Deed Notifications -Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or buffers approved for impact under this Certification Approval and Authorization Certificate. A sample deed notification can be downloaded from the 401/Wetlands Unit web site at http://h2o.enr.state.nc.us/ncwetlands. The text of the sample deed notification may be modified as appropriate to suit to this project; 8. Construction Stormwater Permit NCGO10000 Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an NPDES General stormwater permit (NCGO10000) administered by DWQ is automatically issued to the project. This General Permit allows stormwater to be discharged during land disturbing construction activities as stipulated by conditions in the permit. If your project is covered by this permit [applicable to construction projects that disturb one (1) or more acres], full compliance with permit conditions including the sedimentation control plan, self- monitoring, record keeping and reporting requirements are required. A copy of this permit and monitoring report forms may be found at http: //h2o. enr. state. nc. us/su/Forms Documents. htm. ; Certificate of Completion: 9. Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules; and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or LAMA Permit. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. Timber Point Properties, LLC Page 4 of 4 January 5, 2007 This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act and the Neuse riparian buffer protection rule as described within 15A NCAC 2B .0233. If you have any questions, please telephone Cyndi Karoly or Ian McMillan in the Central Office in Raleigh at 919-733-1786 or Kyle Barnes, in the DWQ Washington Regional Office at 252-946-6481. AWK/~m Enclosures: GC 3400 Certification of Completion Sincer ,~ Alan W. Klimek, P.E. cc: Doug Huggett, DCM USACE Washington Regulatory Field Office Kyle Barnes, DWQ Washington Regional Office File Copy Central Files Mike Street, P.O. Box 769, Morehead City, NC 27557 Sean Wallace, 240 Craven Street, New Bern, NC 28560 Filename: 061848TimberPointSD(Paml ico}401_CAMA_NB R