Loading...
HomeMy WebLinkAbout20011549 Ver 1_Stormwater Info_20020814WITHERS & RAVENEL ENGINEERS I PLANNERS I SURVEYORS vii MacKenan Drive CARY, NORTH CAROLINA, 27511 (919) 469-3340 FAX (919) 467-6oo8 To: NC DIVISION OF WATER QUALITY 4o1 WETLANDS UNIT 2321 CRABTREE BLVD, SUITE 250 RALEIGH, NC 276o4 WE ARE SENDING YOU ? Shop Drawings ? Copy of Letter ® Attached ? Prints ? Change order COPIES DATE NO. DESCRIPTION 1 8/9/02 COVER LETTER 1 8/9/01 STORM WATER MANAGEMENT PLAN 1 8/12/02 0&M AGREEMENT i i i i THESE ARE TRANSMITTED as checked below: ? For approval ? Approved as submitted ? For your use ? Approved as noted ? As requested ? Returned for corrections ? For review and comment ? ? FOR BIDS DUE 20 ? PRINTS RETURNED AFTER LOAN TO US REMARKS: COPY TO: FILE SIGNED: KEN JESNECK, PE if enclosures are not as noted, kindly notify us at once. ? Resubmit ? Submit ? Return copies for approval copies for distribution corrected prints LETTER OF T° ° NSWTTAL DATE 8/14/02 JOB No. 201113.0 ATTENTJON TODD ST JOHN PHONE # 733-9584 RE: LONG LAKE SUBDIVISION DWQ PERMIM ol-i549 s ` a il s: ? Under separate cover via j R-rr TIOIU ® Plans ? Samples ? Specifications ? Diskette ? WITHERS RAVEN EL ENGINEERS I PLANNERS I SURVEYORS August 14, 2002 Mr. Todd St. John North Carolina Department of Environment and Natural Resources Division of Water Quality 2321 Crabtree Boulevard Raleigh, North Carolina 27604-226o Re: Storm Water Management Plan Long Lake Subdivision DWQ Project Number 01-1549 W&R Project 201113.0 Mr. St. John: Please find the attached Storm Water Management Plan, Phases 2 and 3, for the Long Lake Subdivision. This submittal is in response to the conditions of the April 18, 2002, 401 Water Quality Certification, Additional Conditions. The plans, Operation and Maintenance Agreement, and supporting calculations are included with this submittal f% --structural management practices. The overall phasing plan has been revised so that the structures match the identification system imposed by the City of Raleigh for their stormwater management program. Several modifications to the phasing plan as presented in the previous submittal are incorporated into this submittal. The first change includes the splitting of the constructed wetlands in Tract 1 into two smaller constructed wetlands. This change resulted from the City of Raleigh not allowing any grading within their greenway easement. The revised wetland configuration (Pond A) and the new constructed wetland (Pond C) will replace the original wetland previously approved. The other two structural devices in this submittal are those described in the correspondence dated April 2, 2002. No changes are being proposed to Phases 3, 4, or 5 at this time. Phase 6 remains basically the same, except that one of the structural devices will be placed in Tract 7. All the preliminary design data will remain the same. A Phase 7 has been added due to the addition of anther tract within the overall development.` The Phase 7 device will be a dry detention pond designed to capture the first runoff from the first inch of precipitation and releasing the detained water over 48 to 96 hours through the 50 foot Neuse River Buffer. We trust that attached plans will be sufficient to complete the review and approval of the Phases 2 and 3 Storm Water Management Plan provided for this site. Please advise should you have any questions or comments. INC. K:\oi\o1-110\01113\DWQ-POND S\081402.TST.doc \ 111 MacKenan Drive i Cary, North Carolina 27511 1 tel: 919.469.3340 1 fax: 919.467.6oo8 i www.withersravenel.com Sincerely, LONG LAKE SUBDIVISION POND A - TRACT 1, PHASE 1 OPERATION AND MAINTENANCE AGREEMENT The constructed wetland basin system is defined as the wetland basin, pretreatment including forebays and the vegetated filter if one is provided. Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wetland detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice on the skimmer of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wetland detention basin system semi-annually or when depth is reduced to what is shown in the diagram below. Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wetland detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the accumulated sediment depth reads 0.5 feet in the main pond, the sediment shall be removed. If the elevation of the marsh areas exceeds the permanent pool elevation, the sediment should be removed to design levels. This shall be accomplished by removing and stockpiling the upper 6 inches of soil. Then the marsh area shall be excavated six inches below design elevations. Afterwards, the stockpiled soil should be spread over the marsh surface. The soil should not be stockpiled for more than two weeks. When the accumulated sediment depth reads 1.0 feet in the forebay and micro-pool, the sediment shall be removed. CONSTRUCTED WETLAND DIAGRAM V Permanent (Normal) Pool Elevation 390' Sediment 7evaov al El . 389' ___ Sediment Removal Elevation 389' n 388' ------ ---------------------------------' Bottom tio I Bottom Elevation FOREBAY & MICRO-POOL MAIN POND Page 1 of 2 LONG LAKE SUBDIVISION POND C - TRACT 1, PHASES 3 & 4 OPERATION AND MAINTENANCE AGREEMENT 5. Wetland planting densities in the marsh areas should be maintained by replanting bare areas as needed. Wetland plants should be encouraged to grow in the marsh areas. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wetland detention basin system shall be maintained in good working order. 8. Level spreaders or other structures that provide diff use flow shall be maintained every six months. All accumulated sediment and debris shall be removed from the structure, and a level elevation shall be maintained across the entire flow spreading structure. Any down gradient erosion must be repaired and/or replanted as necessary. I acknowledge and agree by my signature below that I am responsible for the performance of the eight maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: A L At4 C ? VOu- Title: e-? 2 v l_A N Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, z:- &" Gv v??" , a Notary Public for the State of ALA Cary /'4 t , County of do hereby certify that tin r? personally appeared before me this day of +? c u.,?L and acknowledge the due execution of the forgoing wet [wetland] detention basin maintenance requirements. Witness my hand and official seal, .?`%EN L®1,•F•`' i14 0 TA? all A'11i ?? ?F?. mss C0UN'T%( ' 11100 %% SEAL My commission expires --2 7- 0 Page 2 of 2 Address: Pulte Home Corporation 401 Harrison Oaks Blvd, Ste 250 Cary, NC 27513 .. f- LONG LAKE SUBDIVISION POND C - TRACT 1, PHASES 3 & 4 OPERATION AND MAINTENANCE AGREEMENT The constructed wetland basin system is defined as the wetland basin, pretreatment including forebays and the vegetated filter if one is provided. Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wetland detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice on the skimmer of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wetland detention basin system semi-annually or when depth is reduced to what is shown in the diagram below. Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wetland detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the accumulated sediment depth reads 0.5 feet in the main pond, the sediment shall be removed. If the elevation of the marsh areas exceeds the permanent pool elevation, the sediment should be removed to design levels. This shall be accomplished by removing and stockpiling the upper 6 inches of soil. Then the marsh area shall be excavated six inches below design elevations. Afterwards, the stockpiled soil should be spread over the marsh surface. The soil should not be stockpiled for more than two weeks. When the accumulated sediment depth reads 1.0 feet in the forebay and micro-pool, the sediment shall be removed. CONSTRUCTED WETLAND DIAGRAM 0 Permanent (Normal) Pool Elevation 396' Sediment 7evaov al El . 395' ,? __r_ Sediment Removal Elevation 395' Bottom tion 394' _----- _ ion 394.5' 1 FOREBAY & MICRO-POOL MAIN POND Page 1 of 2 i WO .. V, LONG LAKE SUBDIVISION POND A - TRACT 1, PHASE 1 OPERATION AND MAINTENANCE AGREEMENT 5. Wetland planting densities in the marsh areas should be maintained by replanting bare areas as needed. Wetland plants should be encouraged to grow in the marsh areas. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wetland detention basin system shall be maintained in good working order. 8. Level spreaders or other structures that provide diffuse flow shall be maintained every six months. All accumulated sediment and debris shall be removed from the structure, and a level elevation shall be maintained across the entire flow spreading structure. Any down gradient erosion must be repaired and/or replanted as necessary. I acknowledge and agree by my signature below that I am responsible for the performance of the eight maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party..( Print name: A l," 'c-'- ?rl U- Title: '?:>c P- of LA(Ij Address: Pulte Home Corporation 401 Harrison Oaks Blvd, Ste 250 Cary, NC 27513 Phor Sign, Date Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, '?-- ; le, Z 14L , a Notary Public for the State of "U, County of yu k , do hereby certify that Cll r'r C # ?? personally appeared before me this day of QL S uJf , .Z 00 d- , and acknowledge the due execution of the forgoing wet [wetland] detention basin maintenance requirements. Witness my hand and official seal, fte 0, C 'c ,UAW1 ? SEAL My commission expires 1-2 --2 7 - "? Page 2of2 LONG LAKE SUBDIVISION POND D - TRACT 1, PHASE 2 OPERATION AND MAINTENANCE AGREEMENT 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface 6. All components of the dry detention basin system shall be maintained in good working order. 7. Level spreaders or other structures that provide diffuse flow shall be maintained every six months. All accumulated sediment and debris shall be removed from the structure, and a level elevation shall be maintained across the entire flow spreading structure. Any down gradient erosion must be repaired and/or replanted as necessary. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system Tr responsible party. Print name: " A L W C- I t,l, dlp? Address: Pulte Home Corporation 401 Harrison Oaks Blvd, Ste 250 Cary, NC 27513 Phor Sign, Date Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of County of w, Y( <-- , do hereby certify that Al., C ,9: ?? personally appeared before me this day of o oa- , and acknowledge the due execution of the forgoing wet [wetland] detention basin maintenance requirements. Witness my hand and official seal, o. ys pUBtIC ??''' • N•.•e••*- .??p 0 U N 11 SEAL My commission expires L I) -,1 7- o y Page 2 of 2 LONG LAKE SUBDIVISION POND D - TRACT 1, PHASE 2 OPERATION AND MAINTENANCE AGREEMENT The extended dry detention basin system is defined as the dry detention basin, pre-treatment including forebays and the vegetated filter if one is provided. Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the dry detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice on the skimmer of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the dry detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading. When the sediment depth reads 1 ft in the main pond, the sediment shall be removed. When the sediment depth reads 1 ft in the forebay, the sediment shall be removed. BASIN DIAGRAM Top of Dam Elevation 386.5 ft Riser Crest Elevation 384.4 ft Sediment Removal El. 382 ft ---- ---_-____ Sediment Removal Elevation 382 ft 75% Bottom Ele tion 381 ft --------------------------------------------- ----- Bottom Elevation FOREBAY MAIN POND 25 Page 1 of 2 LONG LAKE SUBDIVISION POND E - TRACT 2, PHASE 2 OPERATION AND MAINTENANCE AGREEMENT The constructed wetland basin system is defined as the wetland basin, pretreatment including forebays and the vegetated filter if one is provided. Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wetland detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice on the skimmer of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wetland detention basin system semi-annually or when depth is reduced to what is shown in the diagram below. Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wetland detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the accumulated sediment depth reads 0.5 feet in the main pond, the sediment shall be removed. If the elevation of the marsh areas exceeds the permanent pool elevation, the sediment should be removed to design levels. This shall be accomplished by removing and stockpiling the upper 6 inches of soil. Then the marsh area shall be excavated six inches below design elevations. Afterwards, the stockpiled soil should be spread over the marsh surface. The soil should not be stockpiled for more than two weeks. When the accumulated sediment depth reads 1.0 feet in the forebay and micro-pool, the sediment shall be removed. CONSTRUCTED WETLAND DIAGRAM V Permanent (Normal) Pool Elevation 384.25' Sediment Re oval El. 383' --------------- - Sediment Removal Elevation 383.25' Bottom El vation 382' --------------------------------------------- *----- FOREBAY & MICRO-POOL E MAIN POND Page 1 of 2 LONG LAKE SUBDIVISION POND E - TRACT 2, PHASE 2 OPERATION AND MAINTENANCE AGREEMENT 5. Wetland planting densities in the marsh areas should be maintained by replanting bare areas as needed. Wetland plants should be encouraged to grow in the marsh areas. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wetland detention basin system shall be maintained in good working order. 8. Level spreaders or other structures that provide diff use flow shall be maintained every six months. All accumulated sediment and debris shall be removed from the structure, and a level elevation shall be maintained across the entire flow spreading structure. Any down gradient erosion must be repaired and/or replanted as necessary. I acknowledge and agree by my signature below that I am responsible for the performance of the eight maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: t / 1 UA fj ?- tr1? 1. L ra 2. Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, _6; ee" zo „I? , a Notary Public for the State of ko, Ill r"'u County of (Jo, do hereby certify that , Nn L g ly personally appeared before me this _ day of 14 yJ 2 0()0- , and acknowledge the due execution of the forgoing wet [wetland] detention basin maintenance requirements. Witness my hand and official seal, 0 .M•••'• TAN y i y • V?I.IC C D UNS( SEAL My commission expires jj -2 7- 0 Page 2 of 2 Address: Pulte_Home Corporation 401 Harrison Oaks Blvd, Ste 250 Cary, NC 27513 Project Name: Long Lake Project No. DW Q pond C SUBMITTED DESIGN: REQUIRED DESIGN. elevations 2.3 average depth status Bottom of Basin (ft) Permanent Pool (ft) ' 396 396 ft. depth check depth Temporary Pool (ft) 398 2 ft. depth ok areas Permanent Pool SA (sq ft) 5342 5195 sq. ft. ok Drainage Area (ac) 7.52 Impervious Area (ac) 2.73 36.3 % - Forebay (ft2) 0% check forebt Low Marsh (ft2) 0.0% check mars{ Micropool (ft2) 0% check forebi High Marsh (ft2) 0.0% check marsl 0% volumes Temporary Pool (cu ft) 12232 0 cu. ft. ok other parameters SA/DA 1.59 - Orifice Diameter (in) 0.00 cfs drawdown - Design Rainfall (in) #DIV/0! day drawdown #DIV/0! Linear Interpolation of Correct SAIDA*** 396 ft. Permanent Pool Depth % Impervious SA/DA from Table Next Lowest 30 1.34 Project Impervious 36.3 1.59 Next Highest 40 1.73 WITHERS & RAVENEL J PHASES 2 AND 3 OF THE STORMWATER MANAGEMENT PLAN SUPPORTING DESIGN CALCULATIONS LONG LAKE SUBDIVISION Raleigh, North Carolina Prepared For: PULTE HOME CORPORATION 4o1 Harrison Oaks Boulevard, Suite 250 Cary, North Carolina 27513 Prepared By: WITHERS & RAVENEL, INC iii MacKenan Drive Cary, North Carolina 27511 August 2002 ?,••' (? CARD j W&R Project No. 201113 j'iStpjp'?•p? 18 f Kenneth? ° ,dd?dd pr?e S}?' ??bbe V, POND A Long Lake Subdivision Tract s Protect Name: Long Lake Subdivision - Tract 1 City/State: Raleigh, NC Project #: 201113.2 Date: 14-Aug-02 Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant Rmmnval FffiriPnrv in the Pipdmnnt % Impervious Cover Permanent Pool Dept 3.0 4.0 5.0 6.0 h (feet) 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 5, April 1999 POND A (Constructed Wetland) Pervious (ac) Impervious (ac) Total Area (ac) Pervious Area 6.17 0 6.17 Impervious 0 6.05 6.05 Totals 6.17 6.05 12.22 % Impervious Surface Area = Surface Area of Permanent Pool: 49.5 % Assumed depth = 3 feet SA/DA ratio = 2.04 % From Table 1.1 Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100 SA = 0.250 acres 10878 sq. ft. Normal pool elevation = 390 feet Surface area provided = 0.25 acres 10890 sq. ft. 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(1) where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.496 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 0.505 acre-ft 21983 cu. ft. Elevation for required storage = 391.76' Runoff storage provided = 0.505 ac-ft Riser structure crest elevation = 392 feet Runoff storage provided = 0.579 ac-ft 25221 cu. ft. 0\01\01-110\01113\HH\SWMP\Pulte Stormwater Calcs Wetlands jun02.xls LONG LAKE SUBDIVISION - TRACT 1 POND A - PONDPACK OUTPUT FOR WETLAND DESIGN Job File: K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND A_TRACTI-WETLAND.PPW Rain Dir: I:\ENGFILE\HAESTAD\PPW RAINFALL DATA\WAKE CO\ -------------------------- -------------------------- JOB TITLE -------------------------- -------------------------- LONG LAKE SUBDIVISION - TRACT 1 POND A - Extended Detention Wetland Raleigh, North Carolina W&R Project #201113.2 The Modified Rational Method was used to determine peak discharge rates for the 2-year, 10-year and 100-year design storm events for the Raleigh/Durham, North Carolina area and size the detention storage for the dry detention pond due to the small drainage area (±12.2 acres). The Modified Rational Method is an extension of the rational method for rainfalls with durations greater than the time of concentration. The method was modified so that the concepts of the rational method (peak discharge) could be used to develop hydrographs for storage routing. The Modified Rational Method within PondPack calculates the storage volume for hydrographs of rainfalls of various durations to determine the critical duration for the design storm as the one requiring the greatest detention storage volume. This critical duration is used to calculate the discharge rate and volume of water that is routed through the pond structure. The hydrograph developed maintains the calculated volume and adjusts the peak discharge rate accordingly. Thus, the peak discharge for the Modified Rational Method is less than the calculated Rational Method. The rainfall data used in this design was taken from the Intensity-Duration-Frequency Table for the Raleigh area published in the City of Raleigh Stormwater Management Design Manual. The post-development time of concentration was set at 5 minutes to account for the piped drainage system. Pond A is an extended detention wetland that is designed to capture the volume of runoff from the first 1-inch of rainfall and slowly release it over a 48 to 72 hour period. In addition, the wetland is designed to pass the 100-year design storm through the riser/barrel outlet structure of the pond. Pond A Design Highlights: Normal Pool Elevation = 390' Required Surface Area = 0.250 acres (10,878 sq. ft.) Surface Area Provided = 0.251 acres (10,940 sq. ft.) Required Storage Volume = 0.505 ac-ft Storage Volume Provided = 0.579 ac-ft at 392' Top of Dam = 395' Calculated Freeboard for the 10-yr design storm = 2.39 ft Calculated Freeboard for the 100-yr design storm = 2.29 ft Outlet Structure: • 48" RCP Riser structure with crest at 392' ¦ 24" RCP Barrel; 32 linear feet; Inverts at 386.64' and 386' ¦ 2.5" Circular Orifice at 390' for extended draw-down LONG LAKE SUBDIVISION - TRACT 1 POND A - PONDPACK OUTPUT FOR WETLAND DESIGN Table of Contents ********************r* MASTER SUMMARY t***********rt****r*t* Watershed....... Mod. Rational Grand Summary ........ 1.01 Master Network Summary ............. 1.02 ********************** RAINFALL DATA *********************** 2-yr IDF Table.. 2-yr I-D-F Table ........................ 2.01 10-yr IDF Table 10-yr I-D-F Table ........................ 2.01 100-yr IDF Table 100-yr I-D-F Table ........................ 2.02 ********************** TC CALCULATIONS ********************* AREA POND A..... Tc Calcs ........................... 3.01 *********************** POND VOLUMES *********************** POND A.......... Vol: Elev-Area ..................... 4.01 ******************** OUTLET STRUCTURES ********************* OUTLET.......... Outlet Input Data .................. 5.01 Composite Rating Curve ............. 5.04 *********************** POND ROUTING *********************** POND A.......... Pond E-V-Q Table ................... 6.01 ****************** RATIONAL METHOD CALCS ******************* AREA POND A..... C and Area ......................... 7.01 AREA POND A..... Rational Peak Qs ................... 7.02 AREA POND A..... 2-yr Mod. Rational Storm Calcs ..... 7.03 AREA POND A..... 10-yr Mod. Rational Storm Calcs .... 7.04 AREA POND A..... 100-yr Mod. Rational Storm Calcs ... 7.05 LONG LAKE SUBDIVISION - TRACT 1 POND A - PONDPACK OUTPUT FOR WETLAND DESIGN Type.... Mod. Rational Grand Summary Page 1.01 Name.... Watershed File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND A_TRACTI_WETLAND.PPW ************************************************************************ ************************************************************************ * * * MODIFIED RATIONAL METHOD * ---- Grand Summary For All Storm Frequencies ---- * * ************************************************************************ ************************************************************************ Q = CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600) ..... Area = ......... 12.220 acres ............ ....... Tc ............. = .0833 ......... hrs .......... ........... ................ ......... ............ ....... ............. ................... VOLUMES Freq. Adjusted Duration I Qpeak Allowable Inflow Storage years 'CT ---------------- hrs --------- in/hr ------------ cfs ------- cfs I ---------- -- ac-ft --------- ac-ft ---------- 2 .597 .7167 2.1783 16.01 10.00 .948 .618 10 .597 .9167 2.5597 18.82 13.00 I 1.426 .888 100 .597 1.1500 3.2090 23.59 14.00 2.242 1.529 LONG LAKE SUBDIVISION - TRACT 1 POND A - PONDPACK OUTPUT FOR WETLAND DESIGN Type.... Master Network Summary Page 1.02 Name.... Watershed File.... K:\01\01-110\01113\H&H\SWMP\PPW WETLANDS\POND A TRACTI WETLAND.PPW MASTER DESIGN STORM SUMMARY Default Network Design Storm File, ID RAL_IDF.IDQ Raleigh IDF Rainfall Return Event Type IDF File IDF ID ------------ 2-yr --------------- I-D-F Table -------- -- RAL IDF ------ 2-yr I -------- DF Table 10-yr I-D-F Table RAL_IDF 10-yr IDF Table 100-yr I-D-F Table RAL_IDF 100-yr IDF Table MASTER NETWORK SUMMARY Modified Rational Me thod Network (*Node=Outfall; +Node =Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=L eft&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event ac-ft Trun hrs cfs ft ac-ft ----------------- ---- AREA POND A AREA ------ ---------- -- 2 .948 --------- - .0833 ------- 16.01 -------- ------------ AREA POND A AREA 10 1.425 .0833 18.82 AREA POND A AREA 100 2.242 .0833 23.59 *OUTFALL JCT 2 .661 .7300 13.67 *OUTFALL JCT 10 1.135 .9100 18.68 *OUTFALL JCT 100 1.948 1.0900 23.59 POND A IN POND 2 .948 .0900 16.01 POND A IN POND 10 1.425 .0900 18.82 POND A IN POND 100 2.241 .0900 23.59 POND A OUT POND 2 .661 .7300 13.67 392.49 .738 POND A OUT POND 10 1.135 .9100 18.68 392.61 .777 POND A OUT POND 100 1.948 1.0900 23.59 392.71 .811 LONG LAKE SUBDIVISION - TRACT 1 POND A - PONDPACK OUTPUT FOR WETLAND DESIGN Type.... I-D-F Table Page 2.01 Name.... 2-yr IDF Table Tag: 2-yr Event: 2 yr File.... I:\ENGFILE\HAESTAD\PPW RAINFALL DATA\WAKE CO\RAL_IDF.IDF Title... 2-yr Storm from City of Raleigh IDF Table Storm... 2-yr IDF Table Tag: 2-yr Rainfall-Intensity-Duration Curve Time, hrs Intens., in/hr .0833 .1670 .2500 .3330 .5000 .6670 .8330 1.0000 1.5000 2.0000 3.0000 6.0000 12.0000 24.0000 5.7600 4.7600 4.0400 3.4700 2.7000 2.2800 1.9400 1.7000 1.2200 .9500 .7100 .4400 .2600 .1500 Type.... I-D-F Table Name.... 10-yr IDF Table Tag: 10-yr Event: 10 yr File.... I:\ENGFILE\HAESTAD\PPW RAINFALL DATA\WAKE CO\RAL_IDF.IDF Title... 10-yr Event Table from City of Raleigh IDF Table Storm... 10-yr IDF Table Tag: 10-yr Rainfall-Intensity-Duration Curve Time, hrs Intens., in/hr .0833 7.5000 .1670 6.1300 .2500 5.2500 .3300 4.6400 .5000 3.7100 .6670 3.1500 .8330 2.7100 1.0000 2.4100 1.5000 1.7400 2.0000 1.3700 3.0000 1.0200 6.0000 .6500 12.0000 .3900 24.0000 .2200 LONG LAKE SUBDIVISION - TRACT 1 POND A - PONDPACK OUTPUT FOR WETLAND DESIGN Type.... I-D-F Table Page 2.02 Name.... 100-yr IDF Table Tag: 100-yr Event: 100 yr File.... I:\ENGFILE\HAESTAD\PPW RAINFALL DATA\WAKE CO\RAL_IDF.IDF Title... 100-yr Event from City of Raleigh IDF Table Storm... 100-yr IDF Table Tag: 100-yr Rainfall-Intensity-Duration Curve Time, hrs Intens., in/hr .0833 .1670 .2500 .3330 .5000 .6670 .8330 1.0000 1.5000 2.0000 3.0000 6.0000 12.0000 24.0000 9.7200 8.4000 7.2400 6.4700 5.2800 4.4800 3.8800 3.5000 2.5300 2.0000 1.5000 .9600 .5700 .3300 LONG LAKE SUBDIVISION - TRACT 1 POND A - PONDPACK OUTPUT FOR WETLAND DESIGN Type.... Tc Calcs Name.... AREA POND A Page 3.01 File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND A_TRACTI_WETLAND.PPW ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined Description: Tc = 5 minutes Segment #1 Time: .0833 hrs ------------------------------------------------------------------------ ------------------------- ------------------------- Total Tc: .0833 hrs Calculated Tc < Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs ------------------------- ------------------------- LONG LAKE SUBDIVISION - TRACT 1 POND A - PONDPACK OUTPUT FOR WETLAND DESIGN Type.... Vol: Elev-Area Name.... POND A Page 4.01 File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND A TRACTI_WETLAND.PPW Elevation Planimeter Area Al+A2+sgr(Al*A2) Volume Volume Sum (ft) (sq.in) (acres) ----------- (acres) ----------------- (ac-ft) --------- (ac-ft) ------------- ----------- 390.00 ----------- ----- .2500 .0000 .000 .000 391.00 ----- .2950 .8166 .272 .272 392.00 ----- .3190 .9208 .307 .579 393.00 ----- .3420 .9913 .330 .910 394.00 ----- .3900 1.0972 .366 1.275 395.00 .4260 1.2236 .408 1.683 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Areal*Area2)) where: ELI, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for ELI, EL2, respectively Volume = Incremental volume between ELI and EL2 LONG LAKE SUBDIVISION - TRACT 1 POND A - PONDPACK OUTPUT FOR WETLAND DESIGN Type.... Outlet Input Data Name.... OUTLET Page 5.01 File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND A_TRACTI_WETLAND.PPW REQUESTED POND WS ELEVATIONS: Min. Elev.= 390.00 ft Increment = .10 ft Max. Elev.= 395.00 ft ********************************************** OUTLET CONNECTIVITY ---> Forward Flow Only (Upstream to DnStream) <--- Reverse Flow Only (DnStream to Upstream) <---> Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft Stand Pipe RI ---> CV 392.000 395.000 Orifice-Circular OR ---> CV 390.000 395.000 Culvert-Circular CV ---> TW 386.640 395.000 TW SETUP, DS Channel LONG LAKE SUBDIVISION - TRACT 1 POND A - PONDPACK OUTPUT FOR WETLAND DESIGN Type.... Outlet Input Data Name.... OUTLET Page 5.02 File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND A_TRACTI_WETLAND.PPW OUTLET STRUCTURE INPUT DATA Structure ID = RI Structure Type = Stand Pipe ----------------- # of openings ------------- = 1 ------ Invert Elev. = 392.00 ft Diameter = 4.0000 ft Orifice Area = 12.5664 sq.ft Orifice Coeff. _ .600 Weir Length = 12.57 ft Weir Coeff. = 3.100 K, Submerged = .000 K, Reverse = 1.000 Kb,Barrel = .000000 (per ft of full flow) Barrel Length = .00 ft Mannings n = .0000 Structure ID = OR Structure Type = Orifice-Circular ------------------------------------ # of Openings = 1 Invert Elev. = 390.00 ft Diameter = .2083 ft Orifice Coeff. _ .600 LONG LAKE SUBDIVISION - TRACT 1 POND A - PONDPACK OUTPUT FOR WETLAND DESIGN Type.... Outlet Input Data Page 5.03 Name.... OUTLET File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND A TRACTI_WETLAND.PPW OUTLET STRUCTURE INPUT DATA Structure ID = CV Structure Type = Culvert-Circular ----------------- No. Barrels ------------- = 1 ------ Barrel Diameter = 2.0000 ft Upstream Invert = 386.64 ft Dnstream Invert = 386.00 ft Horiz. Length = 32.00 ft Barrel Length = 32.01 ft Barrel Slope = .02000 ft/ft OUTLET CONTROL DATA... Mannings n = .0130 Ke = .5000 Kb = .012411 Kr = .5000 HW Convergence = .001 INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c = .03980 Inlet Control Y = .6700 T1 ratio (HW/D) = 1.150 T2 ratio (HW/D) = 1.297 Slope Factor = -.500 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 388.94 ft ---> Flow = 15.55 cfs At T2 Elev = 389.23 ft ---> Flow = 17.77 cfs Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES ... Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs LONG LAKE SUBDIVISION - TRACT 1 POND A - PONDPACK OUTPUT FOR WETLAND DESIGN Type.... Composite Rating Curve Name.... OUTLET Page 5.04 File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND A_TRACTI_WETLAND.PPW ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Notes -------- -------- ------ -- Converge ------- ---- --- ----------- Elev. Q TW El ev Error ft cfs ft +/-ft Contributing Structures - -------- 390.00 ------- .00 ------ Free -- ----- Outfall -------- (no Q: ----------------- RI,OR,CV) 390.10 .01 Free Outfall OR,CV (no Q: RI) 390.20 .05 Free Outfall OR,CV (no Q: RI) 390.30 .07 Free Outfall OR,CV (no Q: RI) 390.40 .09 Free Outfall OR,CV (no Q: RI) 390.50 .10 Free Outfall OR,CV (no Q: RI) 390.60 .12 Free Outfall OR,CV (no Q: RI) 390.70 .13 Free Outfall OR,CV (no Q: RI) 390.80 .14 Free Outfall OR,CV (no Q: RI) 390.90 .15 Free Outfall OR,CV (no Q: RI) 391.00 .16 Free Outfall OR,CV (no Q: RI) 391.10 .16 Free Outfall OR,CV (no Q: RI) 391.20 .17 Free Outfall OR,CV (no Q: RI) 391.30 .18 Free Outfall OR,CV (no Q: RI) 391.40 .19 Free Outfall OR,CV (no Q: RI) 391.50 .19 Free Outfall OR,CV (no Q: RI) 391.60 .20 Free Outfall OR,CV (no Q: RI) 391.70 .21 Free Outfall OR,CV (no Q: RI) 391.80 .21 Free Outfall OR,CV (no Q: RI) 391.90 .22 Free Outfall OR,CV (no Q: RI) 392.00 .23 Free Outfall OR,CV (no Q: RI) 392.10 1.46 Free Outfall RI,OR,C V 392.20 3.72 Free Outfall RI,OR,C V 392.30 6.64 Free Outfall RI,OR,CV 392.40 10.10 Free Outfall RI,OR,C V 392.50 14.03 Free Outfall RI,OR,C V 392.60 18.36 Free Outfall RI,OR,CV 392.70 23.08 Free Outfall RI,OR,C V 392.80 28.09 Free Outfall RI,OR,CV 392.90 33.37 Free Outfall RI,CV (no Q: OR) 393.00 35.35 Free Outfall RI,CV (no Q: OR) 393.10 35.70 Free Outfall RI,CV (no Q: OR) 393.20 36.05 Free Outfall RI,CV (no Q: OR) 393.30 36.39 Free Outfall RI,CV (no Q: OR) 393.40 36.73 Free Outfall RI,CV (no Q: OR) 393.50 37.06 Free Outfall RI,CV (no Q: OR) 393.60 37.40 Free Outfall RI,CV (no Q: OR) 393.70 37.73 Free Outfall RI,CV (no Q: OR) LONG LAKE SUBDIVISION - TRACT 1 POND A - PONDPACK OUTPUT FOR WETLAND DESIGN Type.... Composite Rating Curve Name.... OUTLET Page 5.05 File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND A_TRACTl_WETLAND.PPW ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Elev. Q ft cfs -------- 393.80 ------- 38.06 393.90 38.38 394.00 38.70 394.10 39.02 394.20 39.34 394.30 39.65 394.40 39.96 394.50 40.27 394.60 40.58 394.70 40.88 394.80 41.19 394.90 41.48 395.00 41.78 Notes ------ -- Converge ------ ----- -- ------------ TW El ev Error ft +/-ft Contributing Structures ------ Free -- ----- Outfall ------- RI,CV ----- (no -- Q: ------------ OR) Free Outfall RI,CV (no Q: OR) Free Outfall RI,CV (no Q: OR) Free Outfall RI,CV (no Q: OR) Free Outfall RI,CV (no Q: OR) Free Outfall RI,CV (no Q: OR) Free Outfall RI,CV (no Q: OR) Free Outfall RI,CV (no Q: OR) Free Outfall RI,CV (no Q: OR) Free Outfall RI,CV (no Q: OR) Free Outfall RI,CV (no Q: OR) Free Outfall RI,CV (no Q: OR) Free Outfall RI,CV (no Q: OR) LONG LAKE SUBDIVISION - TRACT 1 POND A - PONDPACK OUTPUT FOR WETLAND DESIGN Type.... Pond E-V-Q Table Page 6.01 Name.... POND A File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND A TRACTI_WETLAND.PPW LEVEL POOL ROUTING DATA HYG Dir = K:\01\01-110\01113\H&H\SWMP\PPW WETLANDS\ Inflow HYG file = NONE STORED - POND A IN 2-yr Outflow HYG file = NONE STORED - POND A OUT 2-yr Pond Node Data = POND A Pond Volume Data = POND A Pond Outlet Data = OUTLET No Infiltration INITIAL CONDITIONS --------- Starting ------------ WS Elev = -------- 390.00 ----- ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0100 hrs Elevation Outflow Storage Area Infilt. Q Total 2S/t + 0 ft cfs ac-ft acres cfs ---- cfs ------------ cfs ---------- ------------- 390.00 ------------ .00 -------- .000 ------------ .2500 ------- .00 .00 .00 390.10 .01 .025 .2543 .00 .01 61.04 390.20 .05 .051 .2587 .00 .05 123.16 390.30 .07 .077 .2631 .00 .07 186.30 390.40 .09 .103 .2676 .00 .09 250.53 390.50 .10 .130 .2720 .00 .10 315.84 390.60 .12 .158 .2766 .00 .12 382.24 390.70 .13 .186 .2811 .00 .13 449.73 390.80 .14 .214 .2857 .00 .14 518.30 390.90 .15 .243 .2903 .00 .15 588.02 391.00 .16 .272 .2950 .00 .16 658.85 391.10 .16 .302 .2974 .00 .16 730.54 391.20 .17 .332 .2997 .00 .17 802.80 391.30 .18 .362 .3021 .00 .18 875.61 391.40 .19 .392 .3045 .00 .19 949.02 391.50 .19 .423 .3069 .00 .19 1023.01 391.60 .20 .453 .3093 .00 .20 1097.58 391.70 .21 .485 .3117 .00 .21 1172.73 391.80 .21 .516 .3141 .00 .21 1248.44 391.90 .22 .547 .3166 .00 .22 1324.76 392.00 .23 .579 .3190 .00 .23 1401.68 392.10 1.46 .611 .3213 .00 1.46 1480.39 392.20 3.72 .643 .3235 .00 3.72 1560.67 LONG LAKE SUBDIVISION - TRACT 1 POND A - PONDPACK OUTPUT FOR WETLAND DESIGN Type.... Pond E-V-Q Table Page 6.02 Name.... POND A File.... K:\01\01-110\01113\H&H\SWMP\PPW WETLANDS\POND A TRACTI WETLAND.PPW LEVEL POOL ROUTING DATA HYG Dir = K:\01\01-110\01113\H&H\SWMP\PPW WETLANDS\ Inflow HYG file = NONE STORED - POND A IN 2-yr Outflow HYG file = NONE STORED - POND A OUT 2-yr Pond Node Data = POND A Pond Volume Data = POND A Pond Outlet Data = OUTLET No Infiltration INITIAL CONDITIONS -------- Starting ------------- WS Elev = -------- 390.00 ---- ft - Starting Volume = .000 ac- ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0100 hrs Elevation Outflow Storage Area Infilt. Q Total 2S/t + O ft cfs - ac-ft -------- ---- acres ----- cfs ----------- cfs -------- - cfs - -------- ------------ 392.30 ------------ 6.64 .676 --- .3258 .00 -- - 6.64 - 1642.15 392.40 10.10 .709 .3281 .00 10.10 1724.74 392.50 14.03 .741 .3304 .00 14.03 1808.34 392.60 18.36 .775 .3327 .00 18.36 1892.92 392.70 23.08 .808 .3350 .00 23.08 1978.44 392.80 28.09 .842 .3373 .00 28.09 2064.78 392.90 33.37 .875 .3397 .00 33.37 2151.98 393.00 35.35 .910 .3420 .00 35.35 2236.45 393.10 35.70 .944 .3467 .00 35.70 2320.13 393.20 36.05 .979 .3513 .00 36.05 2404.94 393.30 36.39 1.014 .3561 .00 36.39 2490.86 393.40 36.73 1.050 .3608 .00 36.73 2577.95 393.50 37.06 1.086 .3656 .00 37.06 2666.18 393.60 37.40 1.123 .3704 .00 37.40 2755.58 393.70 37.73 1.161 .3753 .00 37.73 2846.15 393.80 38.06 1.198 .3801 .00 38.06 2937.86 393.90 38.38 1.237 .3851 .00 38.38 3030.78 394.00 38.70 1.275 .3900 .00 38.70 3124.89 394.10 39.02 1.314 .3935 .00 39.02 3220.02 394.20 39.34 1.354 .3971 .00 39.34 3316.00 394.30 39.65 1.394 .4006 .00 39.65 3412.81 394.40 39.96 1.434 .4042 .00 39.96 3510.52 394.50 40.27 1.475 .4078 .00 40.27 3609.08 LONG LAKE SUBDIVISION - TRACT 1 POND A - PONDPACK OUTPUT FOR WETLAND DESIGN Type.... Pond E-V-Q Table Page 6.03 Name.... POND A File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND A TRACTI_WETLAND.PPW LEVEL POOL ROUTING DATA HYG Dir = K:\01\01-110\01113\H&H\SWMP\PPW WETLANDS\ Inflow HYG file = NONE STORED - POND A IN 2-yr Outflow HYG file = NONE STORED - POND A OUT 2-yr Pond Node Data = POND A Pond Volume Data = POND A Pond Outlet Data = OUTLET No Infiltration INITIAL CONDITIONS Starting WS Elev = 390.00 ft Starting Volume = .000 ac- ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0100 hrs Elevation Outflow Storage Area Infilt. Q Total 2S/t + O ft cfs ac-ft acres - cfs ----------- cfs ------------ cfs ---------- ------------ 394.60 ------------- 40.58 -------- 1.516 ---- --- ---- .4114 .00 40.58 3708.52 394.70 40.88 1.557 .4150 .00 40.88 3808.83 394.80 41.19 1.599 .4187 .00 41.19 3909.99 394.90 41.48 1.641 .4223 .00 41.48 4012.05 395.00 41.78 1.683 .4260 .00 41.78 4115.01 LONG LAKE SUBDIVISION - TRACT 1 POND A - PONDPACK OUTPUT FOR WETLAND DESIGN Type.... C and Area Name.... AREA POND A Page 7.01 File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND A_TRACTI WETLAND.PPW RATIONAL C COEFFICIENT DATA ......................................................................... ......................................................................... Area C x Area Soil/Surface Description C acres acres -------------------------------- -------- ---------- ---------- Impervious Area .9500 6.050 5.748 Pervious Area .2500 6.170 1.543 WEIGHTED C & TOTAL AREA ---> .5966 12.220 7.290 ......................................................................... ......................................................................... LONG LAKE SUBDIVISION - TRACT 1 POND A - PONDPACK OUTPUT FOR WETLAND DESIGN Type.... Rational Peak Q's Name.... POST QPEAK Page 7.02 File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND A_TRACTI_WETLAND.PPW SUMMARY OF RATIONAL METHOD PEAK DISCHARGES Q = CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600) Rational Storms: RAL IDF.IDQ Raleigh IDF Tag ----- Freq ------ File ------ ------ IDF Curve ----------- ----- 100-yr 100 RAL_ID F.IDF 100-yr IDF Table Tc = .0833 hrs Tag Freq C C adj ---------- C -------- I ----------- Area Peak Q (years) factor final in/hr acres cfs ----- 1-yr ------ 1 ----- .597 ------ 1.000 ---------- I .597 -------- 4.6080 -----------? 12.220 ---------- 33.87 10-yr 10 .597 1.000 .597 7.5000 12.220 55.13 100-yr 100 .597 1.000 .597 ---------- 9.7200 -------- 12.220 ----------- 71.45 LONG LAKE SUBDIVISION - TRACT 1 POND A - PONDPACK OUTPUT FOR WETLAND DESIGN Type.... Mod. Rational Storm Calcs Page 7.03 Name.... AREA POND A Tag: 2-yr Event: 2 yr File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND A_TRACTI_WETLAND.PPW Storm... 2-yr IDF Table Tag: 2-yr MODIFIED RATIONAL METHOD ---- Summary for Single Storm Frequency ---- Q = CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600) RETURN ------- FREQUENCY: ---------- 2 yr 'C' ---------- Adjustment ----------- = 1.000Allowable ------------------- Q = 10.00 ---------- cfs --------- Hydrograph Storm Duration, Td = .7167 hrs Tc = .0833 hrs Hydrograph File: ................. 2-yr .......... ........... ........ ........... ......... .......... ....... .......... .......... ........... ........ ........... ................... VOLUMES Wtd. Adjusted Duration Intens. Area Qpeak Inflow Storage 'C' 'C' hrs in/hr acres cfs ac-ft - ac-ft --------- ------- .597 ---------- .597 ---------- .0833 ----------- 5.7600 -------- 12.220 -------- -- 42.34 I -- ------ .292 - .223 .597 .597 .1667 4.7640 12.220 35.02 .482 .379 .597 .597 .2500 4.0400 12.220 29.70 .614 .476 .597 .597 .3333 3.4685 12.220 25.50 .702 .530 .597 .597 .5000 2.7000 12.220 19.85 .820 .579 .597 .597 .6667 2.2808 12.220 16.77 .924 .614 ************************************************************ Storage Maximum .597 .597 .7167 2.1783 12.220 16.01 I .948 .618 **************************************************************************** .597 .597 .8333 1.9395 12.220 14.26 .982 .603 .597 .597 1.0000 1.7000 12.220 12.50 I 1.033 .585 .597 .597 2.0000 .9500 12.220 6.98 Qpeak < Qallow LONG LAKE SUBDIVISION - TRACT 1 POND A - PONDPACK OUTPUT FOR WETLAND DESIGN Type.... Mod. Rational Storm Calcs Page 7.04 Name.... AREA POND A Tag: 10-yr Event: 10 yr File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND A_TRACTI_WETLAND.PPW Storm... 10-yr IDF Table Tag: 10-yr MODIFIED RATIONAL METHOD ---- Summary for Single Storm Frequency ---- Q = CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600) RETURN ------- FREQUENCY: ---------- 10 yr 'C' Adjustment = 1.000Allowable ---------------------------------------- Q = 13.00 ----------- cfs -------- Hydrograph Storm Duration, Td = .9167 hrs Tc = .0833 hrs Hydrograph File: ................. 10-yr ......... ........... ........ ............ .......... ......... ...... ........... ......... ........... ........ ............ ................... VOLUMES Wtd. Adjusted Duration Intens. Area Qpeak Inflow Storage 'C' 'C' hrs in/hr acres cfs ac-ft ---------- ac-ft --- ----- ------ .597 ----------- .597 --------- .0833 ----------- 7.5000 -------- 12.220 --------- -- 55.13 .380 - .290 .597 .597 .1667 6.1355 12.220 45.10 I .621 .487 .597 .597 .2500 5.2500 12.220 38.59 .797 .618 .597 .597 .3333 4.6218 12.220 33.98 I .936 .712 .597 .597 .5000 3.7100 12.220 27.27 1.127 .814 .597 .597 .6667 3.1511 12.220 23.16 1.276 .873 .597 .597 .8333 2.7094 12.220 19.92 I 1.372 .879 ************************************************************ Storage Maximum .597 .597 .9167 2.5597 12.220 18.82 1.426 .888 **************************************************************************** .597 .597 1.0000 2.4100 12.220 17.72 1.464 .882 .597 .597 2.0000 1.3700 12.220 10.07 Qpeak < Qallow LONG LAKE SUBDIVISION - TRACT 1 POND A - PONDPACK OUTPUT FOR WETLAND DESIGN Type.... Mod. Rational Storm Calcs Page 7.05 Name.... AREA POND A Tag: 100-yr Event: 100 yr File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND A_TRACTI_WETLAND.PPW Storm... 100-yr IDF Table Tag: 100-yr MODIFIED RATIONAL METHOD ---- Summary for Single Storm Frequency ---- Q = CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600) RETURN ------- FREQUENCY: ---------- 100 yr --------- 'C' Adjustment = ------------------ 1.000Allowable -------------- Q = 14.00 ----------- cfs ------- Hydrograph Storm Duration, Td = 1.1500 hrs Tc = .0833 hrs Hydrograph File: ................. 100-yr ......... ............ ...... .............. ........... ....... ....... .......... ......... ............ ...... .............. .................. VOLUMES Wtd. Adjusted Duration Intens. Area Qpeak Inflow Storage -C' 'C' hrs in/hr acres cfs ac-ft ac-ft ------- ------ .597 ----------- .597 --------- .0833 ------------ 9.7200 ------ 12.220 ---------- --- 71.45 ---------- .492 - .395 .597 .597 .1667 8.4053 12.220 61.79 I .851 .706 .597 .597 .2500 7.2400 12.220 53.22 I 1.100 .907 .597 .597 .3333 6.4676 12.220 47.54 1.310 1.069 .597 .597 .5000 5.2800 12.220 38.81 1.604 1.266 .597 .597 .6667 4.4816 12.220 32.95 1.815 1.381 .597 .597 .8333 3.8792 12.220 28.52 1.964 1.434 .597 .597 1.0000 3.5000 12.220 25.73 2.126 1.500 ************************************************************ Storage Maximum .597 .597 1.1500 3.2090 12.220 23.59 I 2.242 1.529 **************************************************************************** .597 .597 2.0000 2.0000 12.220 14.70 2.430 1.225 .597 .597 3.0000 1.5000 12.220 11.03 Qpeak < Qallow LONG LAKE SUBDIVISION - TRACT 1 POND A - PONDPACK OUTPUT FOR WETLAND DESIGN Elev. vs. Flow STAGE-DISCHARGE FUNCTION FOR OUTLET w Hydrograph for 1-year Design Storm WETLAND IN vs OUT N U 3 0 LL Plotted Curves OUTLET Plotted Curves WETLAND IN 1-yr WETLANDOUT 1-yr 0 10 20 30 40 Flow (cfs) 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Time (hrs) LONG LAKE SUBDIVISION - TRACT 1 POND A - PONDPACK OUTPUT FOR WETLAND DESIGN Hydrograph for 10-yr Design Storm WETLAND IN w OUT 0 Hydrograph for 100-yr Design Storm WETLAND IN vs OUT N U O LL Plotted Curves WETLAND IN 10-yr WETLAND OUT. 10-yr Plotted Curves p WETLAND IN 100-yr WETLAND OUT 100-yr 4 2.5 3.0 3.5 4.0 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Time (hrs) 0.0 0.5 1.0 1.5 2.0 Time (hrs) LONG LAKE SUBDIVISION - TRACT 1 POND A - PONDPACK OUTPUT FOR WETLAND DESIGN Volume z Time MINIMUM DRAIN TIME -Runoff from first 1" Rainfall 0 10 20 30 40 50 60 70 60 Time (hrs) 1 0 • POND C Long Lake Subdivision Tract s, Phases 3 & 4 Project Name: Long Lake Subdivision - Tract 1 City/State: Raleigh, NC Project #: 201113.2 Date: 13-Aug-02 Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant Removal Efficiencv in the Piedmont % Impervious Cover Permanent Pool Depth (feet) 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 5, April 1999 POND C - TRACT 1, PHASES 3 & 4 (Constructed Wetland) Pervious (ac) Impervious (ac) Total Area (ac) FES #45A 4.79 2.73 7.52 % Impervious Surface Area = Surface Area of Permanent Pool: 36 % Assumed depth = 3 feet SA/DA ratio = 1.57 % From Table 1.1 Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100 SA = 0.118 acres 5156 sq. ft. Normal pool elevation = 396 feet Surface area provided = 0.123 acres 5342 sq. ft. 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(1) where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.38 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 0.236 acre-ft 10284 cu. ft. Riser structure crest elevation = 398 feet Runoff storage provided = 0.281 ac-ft "12232 cu. ft. LONG LAKE SUBDIVISION - TRACT 1, PHASES 3 & 4 POND C - PONDPACK OUTPUT Job File: K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND C_TRACT 1 PH 3-4_WETLAND.PPW Rain Dir: I:\ENGFILE\HAESTAD\PPW RAINFALL DATA\WAKE CO\ -------------------------- -------------------------- JOB TITLE -------------------------- -------------------------- LONG LAKE SUBDIVISION - TRACT 1 Pond C - Tract 1, Phases 3 & 4 Constructed Wetland Design Raleigh, North Carolina W&R Project #201113.2 The Modified Rational Method was used to determine peak discharge rates for the 2-year, 10-year and 100-year design storm events for the Raleigh/Durham, North Carolina area and size the detention storage for the dry detention pond due to the small drainage area (±7.5 acres). The Modified Rational Method is an extension of the rational method for rainfalls with durations greater than the time of concentration. The method was modified so that the concepts of the rational method (peak discharge) could be used to develop hydrographs for storage routing. The Modified Rational Method within PondPack calculates the storage volume for hydrographs of rainfalls of various durations to determine the critical duration for the design storm as the one requiring the greatest detention storage volume. This critical duration is used to calculate the discharge rate and volume of water that is routed through the pond structure. The hydrograph developed maintains the calculated volume and adjusts the peak discharge rate accordingly. Thus, the peak discharge for the Modified Rational method is less than the calculated Rational Method. The rainfall data used in this design was taken from the Intensity-Duration-Frequency Table for the Raleigh area published in the City of Raleigh Stormwater Management Design Manual. The post-development time of concentration was set at 5 minutes to account for the piped drainage system. Pond C is an extended detention wetland that is designed to capture the volume of runoff from the first 1-inch of rainfall and slowly release it over a 48 to 72 hour period. In addition, the wetland is designed to pass the 100-year design storm through the riser/barrel outlet structure of the pond. Pond C Design Summary: Normal Pool Elevation = Required Surface Area = Surface Area Provided = 396' 0.118 acres (5156 sq ft) 0.123 acres (5342 sq ft) Required Storage Volume = 0.236 ac-ft (10,280 cu ft) Storage Volume Provided = 0.281 ac-ft (12,232 cu ft) Top of Dam = 400.5' Calculated Freeboard for the 10-yr design storm = 1.9 ft Calculated Freeboard for the 100-yr design storm = 1.2 ft Outlet Structure: ¦ 48" RCP Riser structure with crest at 398' ¦ 15" RCP Barrel; 94 ft length; Inverts at 394.5' and 394' ¦ Floating Skimmer device with constant Q = 0.06 cfs for draw-down LONG LAKE SUBDIVISION - TRACT 1, PHASES 3 & 4 POND C - PONDPACK OUTPUT Table of Contents ******************r*** MASTER SUMMARY ********************** Watershed....... Mod. Rational Grand Summary ........ 1.01 Master Network Summary ............. 1.02 ********************** RAINFALL DATA *********************** 2-yr IDF Table.. 2-yr I-D-F Table ........................ 2.01 10-yr IDF Table 10-yr I-D-F Table ........................ 2.01 100-yr IDF Table 100-yr I-D-F Table ........................ 2.02 ***************r****** TC CALCULATIONS ********************* AREA POND C..... Tc Calcs ........................... 3.01 ******r**************** POND VOLUMES *********************** WETLAND......... Vol: Elev-Area ..................... 4.01 ******************** OUTLET STRUCTURES ********************* OUTLET POND C... Outlet Input Data .................. 5.01 Composite Rating Curve ............. 5.04 *********************** POND ROUTING *********************** WETLAND......... Pond E-V-Q Table ....... .......... 6.01 ****************** RATIONAL METHOD CALCS ************* ****** AREA POND C..... C and Area ......................... 7.01 AREA POND C..... Rational Peak Qs .................... 7.02 AREA POND C..... 2-yr Mod. Rational Storm Calcs ..... 7.03 AREA POND C..... 10-yr Mod. Rational Storm Calcs .... 7.04 AREA POND C..... 100-yr Mod. Rational Storm Calcs ... 7.05 LONG LAKE SUBDIVISION - TRACT 1, PHASES 3 & 4 POND C - PONDPACK OUTPUT Type.... Mod. Rational Grand Summary Page 1.01 Name.... Watershed File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND C_TRACT 1 PH 3-4_WETLAND.PPW ************************************************************************ ************************************************************************ * * * MODIFIED RATIONAL METHOD * ---- Grand Summary For All Storm Frequencies ---- * * ************************************************************************ ************************************************************************ Q = CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600) Area = . 7.520 acres .......... ....... Tc ............... = .0833 ........ hrs .......... ................ ................ ........ ......... . ........... ....... ............... .................. VOLUMES Freq. Adjusted Duration I Qpeak Allowable Inflow Storage years 'c' ---------------- hrs --------- in/hr ----------- cfs ------- cfs I ----------- -- ac-ft --------- ac-ft ---------- 2 .503 .6000 2.4485 9.34 7.00 I .463 .266 10 .503 .5833 3.4306 13.09 11.00 I .631 .328 100 .503 .7333 4.2402 16.18 12.00 .981 .576 LONG LAKE SUBDIVISION - TRACT 1, PHASES 3 & 4 POND C - PONDPACK OUTPUT Type.... Master Network Summary Page 1.02 Name.... Watershed File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND C_TRACT 1 PH 3-4_WETLAND.PPW MASTER DESIGN STORM SUMMARY Default Network Design Storm File, ID RAL_IDF.IDQ Raleigh IDF Rainfall Return Event Type IDF File IDF ID ------------ --------------- -------- ---------------- 2-yr I-D-F Table RAL_IDF 2-yr IDF Table 10-yr I-D-F Table RAL IDF 10-yr IDF Table 100-yr I-D-F Table RAL_IDF 100-yr IDF Table MASTER NETWORK SUMMARY Modified Rational Method Network (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Node ID Type Event ac-ft Trun --- ------------- AREA POND C ---- ---- AREA ------ 2 ------- .463 AREA POND C AREA 10 .631 AREA POND C AREA 100 .981 *OUTFALL JCT 2 .275 *OUTFALL JCT 10 .443 *OUTFALL JCT 100 .791 WETLAND IN POND 2 .463 WETLAND IN POND 10 .631 WETLAND IN POND 100 .980 WETLAND OUT POND 2 .275 WETLAND OUT POND 10 .443 WETLAND OUT POND 100 .791 Max Qpeak Qpeak Max WSEL Pond Storage hrs cfs ft ac-ft ------ --------- .0833 -------- 9.34 -------- ------ .0833 13.09 .0833 16.18 .6000 8.75 .5900 11.21 .7500 12.34 .0900 9.34 .0900 13.09 .0900 16.18 .6000 8.75 398.37 .340 .5900 11.21 398.60 .380 .7500 12.34 399.30 .503 LONG LAKE SUBDIVISION - TRACT 1, PHASES 3 & 4 POND C - PONDPACK OUTPUT Type.... I-D-F Table Page 2.01 Name.... 2-yr IDF Table Tag: 2-yr Event: 2 yr File.... I:\ENGFILE\HAESTAD\PPW RAINFALL DATA\WAKE CO\RAL_IDF.IDF Title... 2-yr Storm from City of Raleigh IDF Table Storm... 2-yr IDF Table Tag: 2-yr Rainfall-Intensity-Duration Curve Time, hrs Intens., in/hr .0833 .1670 .2500 .3330 .5000 .6670 .8330 1.0000 1.5000 2.0000 3.0000 6.0000 12.0000 24.0000 5.7600 4.7600 4.0400 3.4700 2.7000 2.2800 1.9400 1.7000 1.2200 .9500 .7100 .4400 .2600 .1500 Type.... I-D-F Table Name.... 10-yr IDF Table Tag: 10-yr Event: 10 yr File.... I:\ENGFILE\HAESTAD\PPW RAINFALL DATA\WAKE CO\RAL_IDF.IDF Title... 10-yr Event Table from City of Raleigh IDF Table Storm... 10-yr IDF Table Tag: 10-yr Rainfall-Intensity-Duration Curve Time, hrs Intens., in/hr .0833 7.5000 .1670 6.1300 .2500 5.2500 .3300 4.6400 .5000 3.7100 .6670 3.1500 .8330 2.7100 1.0000 2.4100 1.5000 1.7400 2.0000 1.3700 3.0000 1.0200 6.0000 .6500 12.0000 .3900 24.0000 .2200 LONG LAKE SUBDIVISION - TRACT 1, PHASES 3 & 4 POND C - PONDPACK OUTPUT Type.... I-D-F Table Page 2.02 Name.... 100-yr IDF Table Tag: 100-yr Event: 100 yr File.... I:\ENGFILE\HAESTAD\PPW RAINFALL DATA\WAKE CO\RAL_IDF.IDF Title... 100-yr Event from City of Raleigh IDF Table Storm... 100-yr IDF Table Tag: 100-yr Rainfall-Intensity-Duration Curve Time, hrs Intens., in/hr .0833 .1670 .2500 .3330 .5000 .6670 .8330 1.0000 1.5000 2.0000 3.0000 6.0000 12.0000 24.0000 9.7200 8.4000 7.2400 6.4700 5.2800 4.4800 3.8800 3.5000 2.5300 2.0000 1.5000 .9600 .5700 .3300 LONG LAKE SUBDIVISION - TRACT 1, PHASES 3 & 4 POND C - PONDPACK OUTPUT Type.... Tc Calcs Name.... AREA POND C Page 3.01 File.... K:\01\01-110\01113\H&H\SWMP\PPW WETLANDS\POND C -TRACT 1 PH 3-4 WETLAND.PPW ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined Description: Time of Concentration = 5 minutes Segment #1 Time: .0833 hrs ------------------------------------------------------------------------ ------------------------- ------------------------- Total Tc: .0833 hrs Calculated Tc < Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs ------------------------- ------------------------- LONG LAKE SUBDIVISION TRACT 1, PHASES 3 & 4 POND C PONDPACK OUTPUT Type.... Vol: Elev-Area Name.... WETLAND Page 4.01 File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND C_TRACT 1 PH 3-4_WETLAND.PPW Elevation Planimeter Area Al+A2+sgr(AI*A2) Volume Volume Sum (ft) --------- (sq.in) (acres) ---------------------- (acres) ----------------- (ac-ft) --------- (ac-ft) ------------- -- 396.00 ----- .1230 .0000 .000 .000 397.00 ----- .1400 .3942 .131 .131 398.00 ----- .1590 .4482 .149 .281 399.00 ----- .1780 .5052 .168 .449 400.00 ----- .1970 .5623 .187 .637 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-ELI) * (Areal + Area2 + sq.rt.(Area1*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 LONG LAKE SUBDIVISION - TRACT 1, PHASES 3 & 4 POND C - PONDPACK OUTPUT Type.... Outlet Input Data Name.... OUTLET POND C Page 5.01 File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND C_TRACT 1 PH 3-4_WETLAND.PPW REQUESTED POND WS ELEVATIONS: Min. Elev.= 396.00 ft Increment = .10 ft Max. Elev.= 400.00 ft ********************************************** OUTLET CONNECTIVITY ********************************************** ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) < --- > Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft User Defined Table SK ---> TW .000 400.000 Stand Pipe RI ---> CV 398.000 400.000 Culvert-Circular CV ---> TW 394.500 400.000 TW SETUP, DS Channel LONG LAKE SUBDIVISION - TRACT 1, PHASES 3 & 4 POND C - PONDPACK OUTPUT Type.... Outlet Input Data Name.... OUTLET POND C Page 5.02 File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND C_TRACT 1 PH 3-4_WETLAND.PPW OUTLET STRUCTURE INPUT DATA Structure ID = SK Structure Type = User Defined Table ------------------------------------ ELEV-FLOW RATING TABLE Elev, ft Flow, cfs --------- --------- 396.00 .06 400.00 .06 Structure ID = RI Structure Type = Stand Pipe ----------------- # of openings ------------- = 1 ------ Invert Elev. = 398.00 ft Diameter = 4.0000 ft Orifice Area = 12.5664 sq.ft Orifice Coeff. _ .600 Weir Length = 12.57 ft Weir Coeff. = 3.100 K, Submerged = .000 K, Reverse = 1.000 Kb,Barrel = .000000 (per ft of full flow) Barrel Length = .00 ft Mannings n = .0000 LONG LAKE SUBDIVISION - TRACT 1, PHASES 3 & 4 POND C - PONDPACK OUTPUT Type.... Outlet Input Data Name.... OUTLET POND C Page 5.03 File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND C_TRACT 1 PH 3-4 WETLAND.PPW OUTLET STRUCTURE INPUT DATA Structure ID = CV Structure Type = Culvert-Circular ------------- ------------------ No. Barrels ----- = 1 Barrel Diameter = 1.2500 ft Upstream Invert = 394.50 ft Dnstream Invert = 390.50 ft Horiz. Length = 94.00 ft Barrel Length = 94.09 ft Barrel Slope = .04255 ft/ft OUTLET CONTROL DATA... Mannings n = .0130 Ke = .5000 Kb = .023225 Kr = .5000 HW Convergence = .001 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c = .03980 Inlet Control Y = .6700 T1 ratio (HW/D) = 1.139 T2 ratio (HW/D) = 1.286 Slope Factor = -.500 Use unsubmerged inlet control Form 1 equ. below TI elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 395.92 ft ---> Flow = 4.80 cfs At T2 Elev = 396.11 ft ---> Flow = 5.49 cfs Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs LONG LAKE SUBDIVISION - TRACT 1, PHASES 3 & 4 POND C - PONDPACK OUTPUT Type.... Composite Rating Curve Name.... OUTLET POND C Page 5.04 File.... K:\01\01-110\01113\H&H\SWMP\PPW WETLANDS\POND C -TRACT 1 PH 3-4 WETLAND.PPW ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Notes -------- -------- ------ -- Converge ----------- -------------- Elev. Q TW Elev Error ft cfs ft +/-ft Contributing Structures -------- 396.00 ------- .06 ------ Free -- ----- Outfall ----------- SK (no Q: --------------- RI,CV) 396.10 .06 Free Outfall SK (no Q: RI,CV) 396.20 .06 Free Outfall SK (no Q: RI,CV) 396.30 .06 Free Outfall SK (no Q: RI,CV) 396.40 .06 Free Outfall SK (no Q: RI,CV) 396.50 .06 Free Outfall SK (no Q: RI,CV) 396.60 .06 Free Outfall SK (no Q: RI,CV) 396.70 .06 Free Outfall SK (no Q: RI,CV) 396.80 .06 Free Outfall SK (no Q: RI,CV) 396.90 .06 Free Outfall SK (no Q: RI,CV) 397.00 .06 Free Outfall SK (no Q: RI,CV) 397.10 .06 Free Outfall SK (no Q: RI,CV) 397.20 .06 Free Outfall SK (no Q: RI,CV) 397.30 .06 Free Outfall SK (no Q: RI,CV) 397.40 .06 Free Outfall SK (no Q: RI,CV) 397.50 .06 Free Outfall SK (no Q: RI,CV) 397.60 .06 Free Outfall SK (no Q: RI,CV) 397.70 .06 Free Outfall SK (no Q: RI,CV) 397.80 .06 Free Outfall SK (no Q: RI,CV) 397.90 .06 Free Outfall SK (no Q: RI,CV) 398.00 .06 Free Outfall SK (no Q: RI,CV) 398.10 1.29 Free Outfall SK,RI,CV 398.20 3.54 Free Outfall SK,RI,CV 398.30 6.46 Free Outfall SK,RI,CV 398.40 9.91 Free Outfall SK,RI,CV 398.50 11.05 Free Outfall SK,RI,CV 398.60 11.22 Free Outfall SK,RI,CV 398.70 11.38 Free Outfall SK,RI,CV 398.80 11.55 Free Outfall SK,RI,CV 398.90 11.71 Free Outfall SK,RI,CV 399.00 11.87 Free Outfall SK,RI,CV 399.10 12.03 Free Outfall SK,RI,CV 399.20 12.19 Free Outfall SK,RI,CV 399.30 12.34 Free Outfall SK,RI,CV 399.40 12.50 Free Outfall SK,RI,CV 399.50 12.65 Free Outfall SK,RI,CV 399.60 12.80 Free Outfall SK,RI,CV 399.70 12.95 Free Outfall SK,RI,CV 399.80 13.09 Free Outfall SK,RI,CV 399.90 13.24 Free Outfall SK,RI,CV 400.00 13.38 Free Outfall SK,RI,CV LONG LAKE SUBDIVISION - TRACT 1, PHASES 3 & 4 POND C PONDPACK OUTPUT Type.... Pond E-V-Q Table Page 6.01 Name.... WETLAND File.... K:\01\01-110\01113\H&H\SWMP\PPW WETLANDS\POND C -TRACT 1 PH 3-4 WETLAND.PPW LEVEL POOL ROUTING DATA HYG Dir = K:\01\01-110\01113\H&H\SWMP\PPW WETLANDS\ Inflow HYG file = NONE STORED - WETLAND IN 2-yr Outflow HYG file = NONE STORED - WETLAND OUT 2-yr Pond Node Data = WETLAND Pond Volume Data = WETLAND Pond Outlet Data = OUTLET POND C No Infiltration INITIAL CONDITIONS Starting WS Elev = 396.00 ft Starting Volume = .000 ac- ft Starting Outflow = .06 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .06 cfs Time Increment = .0100 hrs Elevation Outflow Storage Area Infilt. Q Total 2S/t + O ft cfs ac-ft acres - cfs cfs cfs ------------ 396.00 ------------ .06 --------- .000 ---- ------- .1230 ----------- .00 ------------ .06 ---------- .06 396.10 .06 .012 .1247 .00 .06 30.03 396.20 .06 .025 .1263 .00 .06 60.40 396.30 .06 .038 .1280 .00 .06 91.16 396.40 .06 .051 .1297 .00 .06 122.34 396.50 .06 .064 .1314 .00 .06 153.92 396.60 .06 .077 .1331 .00 .06 185.92 396.70 .06 .090 .1348 .00 .06 218.33 396.80 .06 .104 .1365 .00 .06 251.15 396.90 .06 .117 .1383 .00 .06 284.40 397.00 .06 .131 .1400 .00 .06 318.07 397.10 .06 .146 .1418 .00 .06 352.17 397.20 .06 .160 .1437 .00 .06 386.73 397.30 .06 .174 .1456 .00 .06 421.72 397.40 .06 .189 .1475 .00 .06 457.18 397.50 .06 .204 .1493 .00 .06 493.09 397.60 .06 .219 .1513 .00 .06 529.47 397.70 .06 .234 .1532 .00 .06 566.31 397.80 .06 .249 .1551 .00 .06 603.60 397.90 .06 .265 .1570 .00 .06 641.37 398.00 .06 .281 .1590 .00 .06 679.61 398.10 1.29 .297 .1609 .00 1.29 719.55 398.20 3.54 .313 .1627 .00 3.54 760.96 LONG LAKE SUBDIVISION - TRACT 1, PHASES 3 & 4 POND C - PONDPACK OUTPUT Type.... Pond E-V-Q Table Page 6.02 Name.... WETLAND File.... K:\01\01-110\01113\H&H\SWMP\PPW WETLANDS\POND C -TRACT 1 PH 3-4 WETLAND.PPW LEVEL POOL ROUTING DATA HYG Dir = K:\01\01-110\01113\H&H\SWMP\PPW WETLANDS\ Inflow HYG file = NONE STORED - WETLAND IN 2-yr Outflow HYG file = NONE STORED - WETLAND OUT 2-yr Pond Node Data = WETLAND Pond Volume Data = WETLAND Pond Outlet Data = OUTLET POND C No Infiltration INITIAL CONDITIONS Starting WS Elev = 396.00 ft Starting Volume = .000 ac- ft Starting Outflow = .06 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .06 cfs Time Increment = .0100 hrs Elevation Outflow Storage Area Infilt. Q Total 2S/t + O ft cfs ac-ft acres cfs cfs -- cfs - ------------ 398.30 ------------ 6.46 --------- .329 ---- -------- .1646 ----------- .00 ------- --- 6.46 ----- ---- 803.47 398.40 9.91 .346 .1665 .00 9.91 846.98 398.50 11.05 .363 .1684 .00 11.05 888.63 398.60 11.22 .380 .1703 .00 11.22 929.78 398.70 11.38 .397 .1722 .00 11.38 971.39 398.80 11.55 .414 .1741 .00 11.55 1013.44 398.90 11.71 .432 .1761 .00 11.71 1055.98 399.00 11.87 .449 .1780 .00 11.87 1098.98 399.10 12.03 .467 .1799 .00 12.03 1142.45 399.20 12.19 .485 .1817 .00 12.19 1186.36 399.30 12.34 .503 .1836 .00 12.34 1230.70 399.40 12.50 .522 .1855 .00 12.50 1275.52 399.50 12.65 .541 .1874 .00 12.65 1320.79 399.60 12.80 .559 .1893 .00 12.$0 1366.52 399.70 12.95 .578 .1912 .00 12.95 1412.71 399.80 13.09 .598 .1931 .00 13.09 1459.34 399.90 13.24 .617 .1951 .00 13.24 1506.46 400.00 13.38 .637 .1970 .00 13.38 1554.05 LONG LAKE SUBDIVISION - TRACT 1, PHASES 3 & 4 POND C - PONDPACK OUTPUT Type.... C and Area Name.... AREA POND C Page 7.01 File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND C_TRACT 1 PH 3-4_WETLAND.PPW RATIONAL C COEFFICIENT DATA ......................................................................... ......................................................................... Area C x Area Soil/Surface Description C acres acres -------------------------------- -------- ---------- ---------- Impervious Area 1.0000 2.730 2.730 Pervious Area .2200 4.790 1.054 WEIGHTED C & TOTAL AREA ---> .5032 7.520 3.784 ......................................................................... ......................................................................... LONG LAKE SUBDIVISION - TRACT 1, PHASES 3 & 4 POND C - PONDPACK OUTPUT Type.... Rational Peak Q's Name.... POST DEV Page 7.02 File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND C_TRACT 1 PH 3-4 WETLAND.PPW SUMMARY OF RATIONAL METHOD PEAK DISCHARGES Q = CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600) Rational Storms: RAL IDF.IDQ Raleigh IDF Tag ----- Freq ------ File ------ ------ IDF Curve ----------- ----- 100-yr 100 RAL_ID F.IDF 100-yr IDF Table Tc = .0833 hrs Tag Freq C C adj ---------- C -------- I ----------- Area I Peak Q (years) factor final in/hr acres cfs ----- 2-yr ------ 2 ----- .503 ------ 1.000 I---------- .503 -------- 5.7600 -----------? 7.520 ---------- 21.98 10-yr 10 .503 1.000 .503 7.5000 7.520 28.62 100-yr 100 .503 1.000 .503 ---------- 9.7200 -------- 7.520 ----------- 37.09 LONG LAKE SUBDIVISION - TRACT 1, PHASES 3 & 4 POND C - PONDPACK OUTPUT Type.... Mod. Rational Storm Calcs Page 7.03 Name.... AREA POND C Tag: 2-yr Event: 2 yr File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND C_TRACT 1 PH 3-4_WETLAND.PPW Storm... 2-yr IDF Table Tag: 2-yr MODIFIED RATIONAL METHOD ---- Summary for Single Storm Frequency ---- Q = CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600) RETURN ------- FREQUENCY: ---------- 2 yr 'C' ---------- Adjustment ----------- = 1.000Allowable ------------------- Q = 7.00 --------- cfs ---------- Hydrograph Storm Duration, Td = .6000 hrs Tc = .0833 hrs Hydrograph File: ................. 2-yr .......... ........... ....... ............ ........ ........... ....... .......... .......... ........... ....... ............ ................... VOLUMES Wtd. Adjusted Duration Intens. Area Qpeak I Inflow Storage 'C' hrs in/hr acres cfs ac-ft ac-ft - --- ------- .503 ---------- .503 ---------- .0833 ----------- 5.7600 ------- 7.520 --------- -- 21.98 I -------- .151 ----- -- .103 .503 .503 .1667 4.7640 7.520 18.18 .250 .178 .503 .503 .2500 4.0400 7.520 15.42 I .318 .222 .503 .503 .3333 3.4685 7.520 13.23 .365 .244 .503 .503 .5000 2.7000 7.520 10.30 .426 .257 ************************************************************ Storage Maximum .503 .503 .6000 2.4485 7.520 9.34 .463 .266 **************************************************************************** 503 .503 .6667 2.2808 7.520 8.70 .479 .263 503 .503 .8333 1.9395 7.520 7.40 I .510 .245 503 .503 1.0000 1.7000 7.520 6.49 Qpeak < Qallow LONG LAKE SUBDIVISION - TRACT 1, PHASES 3 & 4 POND C - PONDPACK OUTPUT Type.... Mod. Rational Storm Calcs Page 7.04 Name.... AREA POND C Tag: 10-yr Event: 10 yr File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND C_TRACT 1 PH 3-4_WETLAND.PPW Storm... 10-yr IDF Table Tag: 10-yr MODIFIED RATIONAL METHOD ---- Summary for Single Storm Frequency ---- Q = CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600) RETURN ------ FREQUENCY: ----------- 10 yr 'C' Adjustment = 1.000Allowable ---------------------------------------- Q = 11.00 ----------- cfs -------- Hydrograph Storm Duration, Td = .5833 hrs Tc = .0833 hrs Hydrograph File: ................. 10-yr ......... ........... ........ ............ .......... ......... ...... ........... ......... ........... ........ ............ ................... VOLUMES Wtd. Adjusted Duration Intens. Area Qpeak Inflow Storage -C' 'C' hrs in/hr acres cfs - ac-ft --- - ac-ft --------- ------ .503 ----------- .503 --------- .0833 ----------- 7.5000 -------- 7.520 --------- - 28.62 --- --- .197 .121 .503 .503 .1667 6.1355 7.520 23.41 I .322 .209 .503 .503 .2500 5.2500 7.520 20.03 .414 .262 .503 .503 .3333 4.6218 7.520 17.63 .486 .296 .503 .503 .5000 3.7100 7.520 14.16 .585 .320 ************************************************************ Storage Maximum .503 .503 .5833 3.4306 7.520 13.09 I .631 .328 .503 .503 .6667 3.1511 7.520 12.02 .662 .322 .503 .503 .8333 2.7094 7.520 10.34 Qpeak < Qallow LONG LAKE SUBDIVISION - TRACT 1, PHASES 3 & 4 POND C - PONDPACK OUTPUT Type.... Mod. Rational Storm Calcs Page 7.05 Name.... AREA POND C Tag: 100-yr Event: 100 yr File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND C_TRACT 1 PH 3-4_WETLAND.PPW Storm... 100-yr IDF Table Tag: 100-yr MODIFIED RATIONAL METHOD ---- Summary for Single Storm Frequency ---- Q = CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600) RETURN ------ FREQUENCY: ----------- 100 yr --------- 'C' Adjustment = ------------------ 1.000Allowable -------------- Q = 12.00 ---------- cfs -------- Hydrograph Storm Duration, Td = .7333 hrs Tc = .0833 hrs Hydrograph File: ................. 100-yr ......... ........... ....... .............. .......... ........ ...... ........... ......... ........... ....... .............. .................. VOLUMES Wtd. Adjusted Duration Intens. Area Qpeak Inflow Storage 'C' 'C' hrs in/hr acres cfs ac-ft - ac-ft -- ------ .503 ----------- .503 --------- .0833 ----------- 9.7200 ------- 7.520 ---------- --- 37.09 I ------ --- .255 ---- -- .172 .503 .503 .1667 8.4053 7.520 32.07 .442 .318 .503 .503 .2500 7.2400 7.520 27.62 .571 .405 .503 .503 .3333 6.4676 7.520 .24.68 .680 .473 .503 .503 .5000 5.2800 7.520 20.15 I .832 .543 .503 .503 .6667 4.4816 7.520 17.10 .942 .570 ************************************************************ Storage Maximum .503 .503 .7333 4.2402 7.520 16.18 I .981 .576 **************************************************************************** .503 .503 .8333 3.8792 7.520 14.80 1.019 .565 .503 .503 1.0000 3.5000 7.520 13.35 1.104 .567 .503 .503 2.0000 2.0000 7.520 7.63 Qpeak < Qallow LONG LAKE SUBDIVISION - TRACT 1, PHASES 3 & 4 POND C - PONDPACK OUTPUT Elev. vs. Flow STAGE-DISCHARGE FUNCTION FOR OUTLET x W Hydrograph for 2-year Design Storm POND C IN vs OUT w U 3 0 LL Plotted Curves OUTLET POND C Plotted Curves WETLAND IN 2-yr WETLAND OUT 2-yr 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Flow (cfs) 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Time (hrs) LONG LAKE SUBDIVISION - TRACT 1, PHASES 3 & 4 POND C - PONDPACK OUTPUT Hydrograph for 10-year Design Storm POND C IN vs OUT N U 3 0 LL Hydrograph for 100-year Design Storm. POND C IN vs OUT U 3 0 LL 1 1 t 3.0 3.5 4.0 Plotted Curves WETLAND IN 10-yr WETLAND OUT 10-yr Plotted Curves WETLAND IN 100-yr WETLAND OUT 100-yr 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Time (hrs) 0.5 1.0 1.5 2.0 2.5 Time (hrs) LONG LAKE SUBDIVISION - TRACT 1, PHASES 3 & 4 POND C - PONDPACK OUTPUT Volume vs. Time MINIMUM DRAIN TIME - Runoff from first 1" Rainfall U (0 a? E 0 Plotted Curves - MDRAIN OUT Time (hrs) 0 10 20 30 40 50 60 70 Project Name: Long Lake Subdivision City/State: Raleigh, NC POND D - TRACT 1, PHASE 2 (Dry Pond) Project #: 201113.2 Date: 14-Aug-02 Rational C Fraction IA Total Area (ac) Pervious (ac) Impervious (ac) Pervious Area 0.22 0 5.64 5.64 0 Impervious 0.95 1.00 5.31 0 5.31 Totals 10.95 5.64 5.31 % Impervious Surface Area = 48 % 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(1) where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.49 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 0.444 acre-ft 19335 cu. ft. Elevation for Min. Required Storage= 384.35 feet Runoff storage provided = 0.443 ac-ft Riser structure crest elevation = 384.4 feet Runoff storage provided = 0.452 ac-ft LONG LAKE SUBDIVISION - TRACT 1, PHASE 2 POND D - PONDPACK OUTPUT Job File: K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND D_TRACT 1 PH 2-DRY POND.PPW Rain Dir: I:\ENGFILE\HAESTAD\PPW RAINFALL DATA\WAKE CO\ -------------------------- -------------------------- JOB TITLE -------------------------- -------------------------- LONG LAKE SUBDIVISION - TRACT 1 Pond D - Tract 1, Phase 2 Dry Pond Design Raleigh, North Carolina W&R Project #201113 The Modified Rational Method was used to determine peak discharge rates for the 2-year, 10-year and 100-year design storm events for the Raleigh/Durham, North Carolina area and size the detention storage for the dry detention pond due to the small drainage area (±10.95 acres). The Modified Rational Method is an extension of the rational method for rainfalls with durations greater than the time of concentration. The method was modified so that the concepts of the rational method (peak discharge) could be used to develop hydrographs for storage routing. The Modified Rational Method within PondPack calculates the storage volume for hydrographs of rainfalls of various durations to determine the critical duration for the design storm as the one requiring the greatest detention storage volume. This critical duration is used to calculate the discharge rate and volume of water that is routed through the pond structure. The hydrograph developed maintains the calculated volume and adjusts the peak discharge rate accordingly. Thus, the peak discharge for the Modified Rational Method is less than the calculated Rational Method. The rainfall data used in this design was taken from the Intensity-Duration-Frequency Table for the Raleigh area published in the City of Raleigh Stormwater Management Design Manual. The post-development time of concentration was set at 5 minutes to account for the piped drainage system. Pond D is an extended dry detention basin that is designed to capture the volume of runoff from the first 1-inch of rainfall and slowly release it over a 48 to 72 hour period. The slow release of the runoff from the first 1-inch of rainfall also meets the requirements for diffuse flow through the riparian buffer. In addition, the dry basin is designedd to pass the 100-year design storm through the riser/barrel outlet structure of the pond. Pond D Design Summary: Required Storage Volume = 0.444 ac-ft (19,335 cu ft) Storage Volume Provided = 0.452 ac-ft (19,690 cu ft) Top of Dam = 386.5' Calculated Freeboard for the 10-yr design storm = 1.45 ft Calculated Freeboard for the 100-yr design storm = 1.27 ft Outlet Structure: ¦ 48" RCP Riser structure with crest at 384.4' ¦ 24" RCP Barrel; 60 ft length; Inverts at 381' and 379.39' ¦ Floating Skimmer device with constant Q = 0.09 cfs for draw-down LONG LAKE SUBDIVISION - TRACT 1, PHASE 2 POND D - PONDPACK OUTPUT Table of Contents ********************r* MASTER SUMMARY ********************** Watershed....... Mod. Rational Grand Summary ........ 1.01 Master Network Summary ............. 1.02 **rr*****************,t RAINFALL DATA **t******************** 2-yr IDF Table.. 2-yr I-D-F Table ........................ 2.01 10-yr IDF Table 10-yr I-D-F Table ........................ 2.01 100-yr IDF Table 100-yr I-D-F Table ........................ 2.02 *****t**************** TC CALCULATIONS ******************r** AREA POND D..... Tc Calcs ........................... 3.01 *********************** POND VOLUMES ******r**************** DRY POND........ Vol: Elev-Area ..................... 4.01 ******************** OUTLET STRUCTURES ********************* OUTLET 1........ Outlet Input Data 5.01 Composite Rating Curve ............. 5.04 *********************** POND ROUTING *********************** DRY POND........ Pond E-V-Q Table ................... 6.01 ****************** RATIONAL METHOD CALCS ******************* AREA POND D..... C and Area ......................... 7.01 AREA POND D..... Rational Peak Qs ................... 7.02 AREA POND D..... 2-yr Mod. Rational Storm Calcs ..... 7.03 AREA POND D..... 10-yr Mod. Rational Storm Calcs .... 7.04 AREA POND D..... 100-yr Mod. Rational Storm Calcs ... 7.05 LONG LAKE SUBDIVISION - TRACT 1, PHASE 2 POND D - PONDPACK OUTPUT Type.... Mod. Rational Grand Summary Page 1.01 Name.... Watershed File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND D_TRACT 1 PH 2-DRY POND.PPW ************************************************************************ ************************************************************************ * MODIFIED RATIONAL METHOD * ---- Grand Summary For All Storm Frequencies ---- * * * * ************************************************************************ ************************************************************************ Q = CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600) ... Area = ......... 10.950 acres ............ ...... Tc ............... = .0833 ....... hrs ........... ............. ................ ......... ............ ...... ............... .................. VOLUMES Freq. Adjusted Duration I Qpeak Allowable Inflow Storage years 'C' ---------------- hrs --------- in/hr ------------ cfs ------ cfs I ----------- --- ac-ft ------- ac-ft ----------- 2 .590 .5833 2.4904 16.21 13.00 .781 .423 10 .590 .6000 3.3747 21.97 18.00 1.089 .581 100 .590 .7333 4.2402 27.60 21.00 1.673 .964 LONG LAKE SUBDIVISION - TRACT 1, PHASE 2 POND D PONDPACK OUTPUT Type.... Master Network Summary Page 1.02 Name.... Watershed File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND D_TRACT 1 PH 2-DRY POND.PPW MASTER DESIGN STORM SUMMARY Default Network Design Storm File, ID RAL_IDF.IDQ Raleigh IDF Rainfall Ret urn Event Type IDF File IDF -- - ID -------- --- --------- 2-yr --------------- I-D-F Table -------- -- RAL IDF -- - 2-yr I DF Table 10-yr I-D-F Table RAL_IDF 10-yr IDF Table 100-yr I-D-F Table RAL_IDF 100-yr IDF Table MASTER NETWORK SUMMARY Modified Rational Method Network (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=L eft&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event ac-ft Trun hrs cfs - - ft - ------ ac-ft ------------ ----- AREA ------- POND D ----- ---- AREA ------ ---------- -- 2 .782 --------- - .0833 ---- - 16.21 - AREA POND D AREA 10 1.089 .0833 21.97 AREA POND D AREA 100 1.673 .0833 27.60 DRY POND IN POND 2 .781 .0900 16.21 DRY POND IN POND 10 1.088 .0900 21.97 DRY POND IN POND 100 1.673 .0900 27.60 DRY POND OUT POND 2 .474 .5800 15.63 384.94 .543 DRY POND OUT POND 10 .780 .5900 21.96 385.05 .562 DRY POND OUT POND 100 1.363 .7300 27.03 385.23 .598 *OUT (LAKE) JCT 2 .474 .5800 15.63 *OUT (LAKE) JCT 10 .780 .5900 21.96 *OUT (LAKE) JCT 100 1.363 .7300 27.03 LONG LAKE SUBDIVISION - TRACT 1, PHASE 2 POND D - PONDPACK OUTPUT Type.... I-D-F Table Page 2.01 Name.... 2-yr IDF Table Tag: 2-yr Event: 2 yr File.... I:\ENGFILE\HAESTAD\PPW RAINFALL DATA\WAKE CO\RAL_IDF.IDF Title... 2-yr Storm from City of Raleigh IDF Table Storm... 2-yr IDF Table Tag: 2-yr Rainfall-Intensity-Duration Curve Time, hrs Intens., in/hr .0833 .1670 .2500 .3330 .5000 .6670 .8330 1.0000 1.5000 2.0000 3.0000 6.0000 12.0000 24.0000 5.7600 4.7600 4.0400 3.4700 2.7000 2.2800 1.9400 1.7000 1.2200 .9500 .7100 .4400 .2600 .1500 Type.... I-D-F Table Name.... 10-yr IDF Table Tag: 10-yr Event: 10 yr File.... I:\ENGFILE\HAESTAD\PPW RAINFALL DATA\WAKE CO\RAL_IDF.IDF Title... 10-yr Event Table from City of Raleigh IDF Table Storm... 10-yr IDF Table Tag: 10-yr Rainfall-Intensity-Duration Curve Time, hrs Intens., in/hr .0833 7.5000 .1670 6.1300 .2500 5.2500 .3300 4.6400 .5000 3.7100 .6670 3.1500 .8330 2.7100 1.0000 2.4100 1.5000 1.7400 2.0000 1.3700 3.0000 1.0200 6.0000 .6500 12.0000 .3900 24.0000 .2200 LONG LAKE SUBDIVISION - TRACT 1, PHASE 2 POND D - PONDPACK OUTPUT Type.... I-D-F Table Page 2.02 Name.... 100-yr IDF Table Tag: 100-yr Event: 100 yr File.... I:\ENGFILE\HAESTAD\PPW RAINFALL DATA\WAKE CO\RAL IDF.IDF Title... 100-yr Event from City of Raleigh IDF Table Storm... 100-yr IDF Table Tag: 100-yr Rainfall-Intensity-Duration Curve Time, hrs Intens., in/hr .0833 .1670 .2500 .3330 .5000 .6670 .8330 1.0000 1.5000 2.0000 3.0000 6.0000 12.0000 24.0000 9.7200 8.4000 7.2400 6.4700 5.2800 4.4800 3.8800 3.5000 2.5300 2.0000 1.5000 .9600 .5700 .3300 LONG LAKE SUBDIVISION - TRACT 1, PHASE 2 POND D - PONDPACK OUTPUT Type.... Tc Calcs Name.... AREA POND D Page 3.01 File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND D_TRACT 1 PH 2 -DRY POND.PPW ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined Description: Tc = 5 minutes Segment #1 Time: .0833 hrs ------------------------------------------------------------------------ ------------------------- ------------------------- Total Tc: .0833 hrs Calculated Tc < Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs ------------------------- ------------------------- LONG LAKE SUBDIVISION - TRACT 1, PHASE 2 POND D - PONDPACK OUTPUT Type.... Vol: Elev-Area Name.... DRY POND Page 4.01 File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND D_TRACT 1 PH 2-DRY POND.PPW Elevation Planimeter Area Al+A2+sgr(A1*A2) Volume Volume Sum (ft) (sq.in) (acres) ----- (acres) ---------------- (ac-ft) ---------- (ac-ft) ------------- ------------ 381.00 ---------------- ----- .0903 .0000 .000 .000 382.00 ----- .1170 .3101 .103 .103 384.00 ----- .1614 .4158 .277 .381 385.50 ----- .1979 .5380 .269 .650 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-ELI) * (Areal + Areal + sq.rt.(Areal*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between ELl and EL2 LONG LAKE SUBDIVISION - TRACT 1, PHASE 2 POND D PONDPACK OUTPUT Type.... Outlet Input Data Name.... OUTLET 1 Page 5.01 File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND D_TRACT 1 PH 2-DRY POND.PPW REQUESTED POND WS ELEVATIONS: Min. Elev.= 381.00 ft Increment = .10 ft Max. Elev.= 385.50 ft ********************************************** OUTLET CONNECTIVITY ********************************************** ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) <---> Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft User Defined Table SK ---> TW .000 385.500 Stand Pipe RI ---> CV 384.400 385.500 Culvert-Circular CV ---> TW 381.000 385.500 TW SETUP, DS Channel LONG LAKE SUBDIVISION TRACT 1, PHASE 2 POND D - PONDPACK OUTPUT Type.... Outlet Input Data Name.... OUTLET 1 Page 5.02 File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND D_TRACT 1 PH 2-DRY POND.PPW OUTLET STRUCTURE INPUT DATA Structure ID = SK Structure Type = User Defined Table ------------------------------------ ELEV-FLOW RATING TABLE Elev, ft Flow, cfs --------- --------- 381.00 .09 385.50 .09 Structure ID = RI Structure Type = Stand Pipe ----------------- # of Openings ------------- = 1 ------ Invert Elev. = 384.40 ft Diameter = 4.0000 ft Orifice Area = 12.5664 sq.ft Orifice Coeff. _ .600 Weir Length = 12.57 ft Weir Coeff. = 3.100 K, Submerged = .000 K, Reverse = 1.000 Kb,Barrel = .000000 (per ft of full flow) Barrel Length = .00 ft Mannings n = .0000 LONG LAKE SUBDIVISION - TRACT 1, PHASE 2 POND D - PONDPACK OUTPUT Type.... Outlet Input Data Name.... OUTLET 1 Page 5.03 File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND D_TRACT 1 PH 2-DRY POND.PPW OUTLET STRUCTURE INPUT DATA Structure ID = CV Structure Type = Culvert-Circular - -- ---------- ----------------- No. Barrels - --- -- = 1 Barrel Diameter = 2.0000 ft Upstream Invert = 381.00 ft Dnstream Invert = 379.39 ft Horiz. Length = 50.00 ft Barrel Length = 50.03 ft Barrel Slope = .03220 ft/ft OUTLET CONTROL DATA... Mannings n = .0130 Ke = .5000 Kb = .012411 Kr = .5000 HW Convergence = .001 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c = .03980 Inlet Control Y = .6700 T1 ratio (HW/D) = 1.144 T2 ratio (HW/D) = 1.291 Slope Factor = -.500 Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 383.29 ft ---> Flow = 15.55 cfs At T2 Elev = 383.58 ft ---> Flow = 17.77 cfs Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs LONG LAKE SUBDIVISION - TRACT 1, PHASE 2 POND D - PONDPACK OUTPUT Type.... Composite Rating Curve Name.... OUTLET 1 Page 5.04 File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND D_TRACT 1 PH 2-DRY POND.PPW ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Notes -------- -------- ------ -- Converge --- ----- --- -------------- Elev. Q TW El ev Error ft cfs ft +/-ft Contributing Structures -------- 381.00 ------- .09 ------ Free -- ----- Outfall ---- SK ----- (no --- Q: -------------- RI,CV) 381.10 .09 Free Outfall SK (no Q: RI,CV) 381.20 .09 Free Outfall SK (no Q: RI,CV) 381.30 .09 Free Outfall SK (no Q: RI,CV) 381.40 .09 Free Outfall SK (no Q: RI,CV) 381.50 .09 Free Outfall SK (no Q: RI,CV) 381.60 .09 Free Outfall SK (no Q: RI,CV) 381.70 .09 Free Outfall SK (no Q: RI,CV) 381.80 .09 Free Outfall SK (no Q: RI,CV) 381.90 .09 Free Outfall SK (no Q: RI,CV) 382.00 .09 Free Outfall SK (no Q: RI,CV) 382.10 .09 Free Outfall SK (no Q: RI,CV) 382.20 .09 Free Outfall SK (no Q: RI,CV) 382.30 .09 Free Outfall SK (no Q: RI,CV) 382.40 .09 Free Outfall SK (no Q: RI,CV) 382.50 .09 Free Outfall SK (no Q: RI,CV) 382.60 .09 Free Outfall SK (no Q: RI,CV) 382.70 .09 Free Outfall SK (no Q: RI,CV) 382.80 .09 Free Outfall SK (no Q: RI,CV) 382.90 .09 Free Outfall SK (no Q: RI,CV) 383.00 .09 Free Outfall SK (no Q: RI,CV) 383.10 .09 Free Outfall SK (no Q: RI,CV) 383.20 .09 Free Outfall SK (no Q: RI,CV) 383.30 .09 Free Outfall SK (no Q: RI,CV) 383.40 .09 Free Outfall SK (no Q: RI,CV) 383.50 .09 Free Outfall SK (no Q: RI,CV) 383.60 .09 Free Outfall SK (no Q: RI,CV) 383.70 .09 Free Outfall SK (no Q: RI,CV) 383.80 .09 Free Outfall SK (no Q: RI,CV) 383.90 .09 Free Outfall SK (no Q: RI,CV) 384.00 .09 Free Outfall SK (no Q: RI,CV) 384.10 .09 Free Outfall SK (no Q: RI,CV) 384.20 .09 Free Outfall SK (no Q: RI,CV) 384.30 .09 Free Outfall SK (no Q: RI,CV) 384.40 .09 Free Outfall SK (no Q: RI,CV) 384.50 1.32 Free Outfall SK, RI,CV 384.60 3.57 Free Outfall SK, RI,CV 384.70 6.49 Free Outfall SK, RI,CV LONG LAKE SUBDIVISION - TRACT 1, PHASE 2 POND D - PONDPACK OUTPUT Type.... Composite Rating Curve Name.... OUTLET 1 Page 5.05 File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND D_TRACT 1 PH 2-DRY POND.PPW ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Notes -------- -------- ------ -- Converge ------------------------- Elev. Q TW Elev Error ft cfs ft +/-ft ---- Contributing Structures -------------------------- -------- 384.80 ------- 9.94 ----- Free --- - Outfall SK,RI,CV 384.90 13.86 Free Outfall SK,RI,CV 385.00 18.20 Free Outfall SK,RI,CV 385.10 26.40 Free Outfall SK,RI,CV 385.20 26.87 Free Outfall SK,RI,CV 385.30 27.33 Free Outfall SK,RI,CV 385.40 27.78 Free Outfall SK,RI,CV 385.50 28.22 Free Outfall SK,RI,CV LONG LAKE SUBDIVISION - TRACT 1, PHASE 2 POND D PONDPACK OUTPUT Type.... Pond E-V-Q Table Page 6.01 Name.... DRY POND File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND D_TRACT 1 PH 2 -DRY POND.PPW LEVEL POOL ROUTING DATA HYG Dir = K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\ Inflow HYG file = NONE STORED - DRY POND IN 2-yr Outflow HYG file = NONE STORED - DRY POND OUT 2-yr Pond Node Data = DRY POND Pond Volume Data = DRY POND Pond Outlet Data = OUTLET 1 No Infiltration INITIAL CONDITIONS Starting WS Elev = 381.00 ft Starting Volume = .000 ac- ft Starting Outflow = .09 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .09 cfs Time Increment = .0100 hrs Elevation Outflow Storage Area Infilt. Q Total 2S/t + O ft cfs ac-ft acres cfs cfs cfs ------------ 381.00 ------------ .09 --------- .000 ---- -------- .0903 ----------- .00 ------------ .09 ---------- .09 381.10 .09 .009 .0928 .00 .09 22.25 381.20 .09 .019 .0954 .00 .09 45.02 381.30 .09 .028 .0979 .00 .09 68.40 381.40 .09 .038 .1006 .00 .09 92.42 381.50 .09 .048 .1032 .00 .09 117.08 381.60 .09 .059 .1059 .00 .09 142.39 381.70 .09 .070 .1086 .00 .09 168.35 381.80 .09 .081 .1114 .00 .09 194.96 381.90 .09 .092 .1142 .00 .09 222.25 382.00 .09 .103 .1170 .00 .09 250.23 382.10 .09 .115 .1191 .00 .09 278.79 382.20 .09 .127 .1211 .00 .09 307.85 382.30 .09 .139 .1232 .00 .09 337.41 382.40 .09 .152 .1253 .00 .09 367.48 382.50 .09 .164 .1274 .00 .09 398.06 382.60 .09 .177 .1296 .00 .09 429.16 382.70 .09 .190 .1317 .00 .09 460.78 382.80 .09 .204 .1339 .00 .09 492.91 382.90 .09 .217 .1361 .00 .09 525.59 383.00 .09 .231 .1383 .00 .09 558.79 383.10 .09 .245 .1405 .00 .09 592.53 383.20 .09 .259 .1428 .00 .09 626.82 LONG LAKE SUBDIVISION - TRACT 1, PHASE 2 POND D - PONDPACK OUTPUT Type.... Pond E-V-Q Table Page 6.02 Name.... DRY POND File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND D_TRACT 1 PH 2-DRY POND.PPW LEVEL POOL ROUTING DATA HYG Dir = K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\ Inflow HYG file = NONE STORED - DRY POND IN 2-yr Outflow HYG file = NONE STORED - DRY POND OUT 2-yr Pond Node Data = DRY POND Pond Volume Data = DRY POND Pond Outlet Data = OUTLET 1 No Infiltration INITIAL CONDITIONS --------- Starting ------------ WS Elev = --------- 381.00 --- ft - Starting Volume = .000 ac- ft Starting Outflow = .09 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .09 cfs Time Increment = .0100 hrs Elevation Outflow Storage Area Infilt. Q Total 2S/t + 0 ft cfs ac-ft acres cfs -- -- cfs ------------ cfs ---------- ------------ 383.30 ------------- .09 -------- .273 ---- -------- .1450 ------ - .00 .09 661.64 383.40 .09 .288 .1473 .00 .09 697.02 383.50 .09 .303 .1496 .00 .09 732.95 383.60 .09 .318 .1520 .00 .09 769.44 383.70 .09 .333 .1543 .00 .09 806.50 383.80 .09 .349 .1566 .00 .09 844.11 383.90 .09 .365 .1590 .00 .09 882.31 384.00 .09 .381 .1614 .00 .09 921.08 384.10 .09 .397 .1637 .00 .09 960.42 384.20 .09 .413 .1661 .00 .09 1000.33 384.30 .09 .430 .1684 .00 .09 1040.78 384.40 .09 .447 .1708 .00 .09 1081.83 384.50 1.32 .464 .1732 .00 1.32 1124.68 384.60 3.57 .482 .1756 .00 3.57 1169.12 384.70 6.49 .499 .1780 .00 6.49 1214.82 384.80 9.94 .517 .1804 .00 9.94 1261.63 384.90 13.86 .535 .1829 .00 13.86 1309.50 385.00 18.20 .554 .1853 .00 18.20 1358.38 385.10 26.40 .572 .1878 .00 26.40 1411.74 385.20 26.87 .591 .1903 .00 26.87 1457.96 385.30 27.33 .611 .1928 .00 27.33 1504.77 385.40 27.78 .630 .1954 .00 27.78 1552.19 385.50 28.22 .650 .1979 .00 28.22 1600.22 LONG LAKE SUBDIVISION - TRACT 1, PHASE 2 POND D - PONDPACK OUTPUT Type.... C and Area Name.... AREA POND D Page 7.01 File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND D_TRACT 1 PH 2-DRY POND.PPW Title... Revised Drainage Area - 6/10/02 RATIONAL C COEFFICIENT DATA ......................................................................... ......................................................................... Revised Drainage Area - 6/10/02 ------------------------------------------------------------------------- Area C x Area Soil/Surface Description C acres acres -------------------------------- -------- ---------- ---------- Impervious Area .9500 5.310 5.045 Pervious Area .2500 5.640 1.410 WEIGHTED C & TOTAL AREA ---> .5895 10.950 6.455 ......................................................................... LONG LAKE SUBDIVISION - TRACT 1, PHASE 2 POND D - PONDPACK OUTPUT Type.... Rational Peak Q's Name.... POST DEV POND D Page 7.02 File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND D_TRACT 1 PH 2-DRY POND.PPW SUMMARY OF RATIONAL METHOD PEAK DISCHARGES Q = CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600) Rational Storms: RAL IDF.IDQ Raleigh IDF Tag ----- Freq ------ File ------ ------ IDF Curve ----------- ----- 100-yr 100 RAL_ID F.IDF 100-yr IDF Table Tc = .0833 hrs Tag Freq C C adj ---------- C -------- I ----------- Area Peak Q (years) factor final in/hr acres cfs - ----- 2-yr ------ 2 ----- .590 ------ 1.000 ---------- I .590 -------- 5.7600 -----------? 10.950 I ------ --- 37.49 10-yr 10 .590 1.000 .590 7.5000 10.950 48.82 100-yr 100 .590 1.000 .590 ---------- 9.7200 -------- 10.950 ----------- 63.27 LONG LAKE SUBDIVISION - TRACT 1, PHASE 2 POND D - PONDPACK OUTPUT Type.... Mod. Rational Storm Calcs Page 7.03 Name.... AREA POND D Tag: 2-yr Event: 2 yr File.... K.\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND D_TRACT 1 PH 2-DRY POND.PPW Storm... 2-yr IDF Table Tag: 2-yr MODIFIED RATIONAL METHOD ---- Summary for Single Storm Frequency ---- Q = CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600) RETURN ------- FREQUENCY: ---------- 2 yr -C' ---------- Adjustment ----------- = 1.000Allowable ------------------- Q = 13.00 --------- cfs ---------- Hydrograph Storm Duration, Td = .5833 hrs Tc = .0833 hrs Hydrograph File: ................. 2-yr .......... ........... ........ ........... ......... .......... ....... .......... .......... ........... ........ ........... ................... VOLUMES Wtd. Adjusted Duration Intens. Area Qpeak Inflow Storage 'C' 'C' hrs in/hr acres cfs ac-ft ac-ft -- ------ ------- .590 ---------- .590 ---------- .0833 ----------- 5.7600 -------- 10.950 -------- -- 37.49 . --------- .258 - - .169 .590 .590 .1667 4.7640 10.950 31.01 I .427 .293 .590 .590 .2500 4.0400 10.950 26.30 I .543 .364 .590 .590 .3333 3.4685 10.950 22.58 I .622 .398 .590 .590 .5000 2.7000 10.950 17.57 .726 .413 ************************************************************ Storage Maximum .590 .590 .5833 2.4904 10.950 16.21 I .781 .423 **************************************************************************** .590 .590 .6667 2.2808 10.950 14.85 .818 .415 .590 .590 .8333 1.9395 10.950 12.62 Qpeak < Qallow LONG LAKE SUBDIVISION - TRACT 1, PHASE 2 POND D - PONDPACK OUTPUT Type.... Mod. Rational Storm Calcs Page 7.04 Name.... AREA POND D Tag: 10-yr Event: 10 yr File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND D_TRACT 1 PH 2-DRY POND.PPW Storm... 10-yr IDF Table Tag: 10-yr MODIFIED RATIONAL METHOD ---- Summary for Single Storm Frequency ---- Q = CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600) RETURN ------ FREQUENCY: ----------- 10 yr 'C' Adjustment = 1.000Allowable ---------------------------------------- Q = 18.00 ---------- cfs --------- Hydrograph Storm Duration, Td = .6000 hrs Tc = .0833 hrs Hydrograph File: ................. 10-yr ......... ........... ........ ............ .......... ......... ...... ........... ......... ........... ........ ............ ................... VOLUMES Wtd. Adjusted Duration Intens. Area Qpeak I Inflow Storage 'C' 'C' hrs in/hr acres cfs --------- -- ac-ft ---------- ac-ft --------- ------ .590 ----------- .590 --------- .0833 ----------- 7.5000 -------- 10.950 48.82 .336 .212 .590 .590 .1667 6.1355 10.950 39.93 .550 .364 .590 .590 .2500 5.2500 10.950 34.17 .706 .458 .590 .590 .3333 4.6218 10.950 30.08 I .829 .519 .590 .590 .5000 3.7100 10.950 24.15 .998 .564 ************************************************************ Storage Maximum .590 .590 .6000 3.3747 10.950 21.97 1.089 .581 **************************************************************************** .590 .590 .6667 3.1511 10.950 20.51 1.130 .572 .590 .590 .8333 2.7094 10.950 17.64 Qpeak < Qallow LONG LAKE SUBDIVISION - TRACT 1, PHASE 2 POND D - PONDPACK OUTPUT Type.... Mod. Rational Storm Calcs Page 7.05 Name.... AREA POND D Tag: 100-yr Event: 100 yr File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\POND D_TRACT 1 PH 2-DRY POND.PPW Storm... 100-yr IDF Table Tag: 100-yr MODIFIED RATIONAL METHOD ---- Summary for Single Storm Frequency ---- Q = CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600) RETURN ------- FREQUENCY: ---------- 100 yr --------- 'C' Adjustment = ------------------ 1.000Allowable -------------- Q = 21.00 ----------- cfs ------- Hydrograph Storm Duration, Td = .7333 hrs Tc = .0833 hrs Hydrograph File: ................. 100-yr ......... ........... ....... .............. .......... ........ ....... .......... ......... ........... ....... .............. .................. VOLUMES Wtd. Adjusted Duration Intens. Area Qpeak Inflow Storage 'C' 'C' hrs in/hr acres cfs -- ac-ft - -- --- ac-ft -------- ------- .590 ---------- .590 --------- .0833 ----------- 9.7200 ------- 10.950 ---------- - 63.27 - --- .436 .291 .590 .590 .1667 8.4053 10.950 54.71 .754 .537 .590 .590 .2500 7.2400 10.950 47.12 .974 .684 .590 .590 .3333 6.4676 10.950 42.10 1.160 .798 .590 .590 .5000 5.2800 10.950 34.37 1.420 .914 .590 .590 .6667 4.4816 10.950 29.17 I 1.607 .956 ************************************************************ Storage Maximum .590 .590 .7333 4.2402 10.950 27.60 1.673 .964 **************************************************************************** 590 .590 .8333 3.8792 10.950 25.25 1.739 .944 590 .590 1.0000 3.5000 10.950 22.78 I 1.883 .943 590 .590 2.0000 2.0000 10.950 13.02 Qpeak < Qallow O O O O O O O O O O O O O O O O O O w m U O LL LONG LAKE SUBDIVISION - TRACT 1, PHASE 2 POND D - PONDPACK OUTPUT Elev. vs. Flow STAGE-DISCHARGE FUNCTION FOR OUTLET 1 Hydrograph for 2-yr Design Storm DRY POND IN vs OUT Plotted Curves OUTLET 1 Plotted Curves DRY POND IN 2-yr DRY POND OUT 2-yr 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Flow (cfs) 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Time (hrs) LONG LAKE SUBDIVISION - TRACT 1, PHASE 2 POND D - PONDPACK OUTPUT Hydrograph for 10-year Design Storm DRY POND IN vs OUT N U 3 LL O O O O O N U o O O Hydrograph for 100-year Design Storm DRY POND IN vs OUT Plotted Curves DRY POND IN 10-yr DRY POND OUT 10-yr Plotted Curves DRY POND IN 100-yr DRY POND OUT 100-yr 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Time (hrs) 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Time (hrs) LONG LAKE SUBDIVISION - TRACT 1, PHASE 2 POND D - PONDPACK OUTPUT Volume vs. Time MINIMUM DRAIN TIME - Runoff from first 1" Rainfall 0.4 0.3 U N E 0.2 0.1 0 O O O O O O O O 0 0.01 0 10 20 30 40 50 60 7C Time (hrs) Plotted Curves - M DRAIN OUT Project Name: Long Lake Subdivision - Tract 2, Phase 2 Project #: 201113.1 City/State: Raleigh, NC Date: 23-Jul-02 Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant Removal Efficiencv in the Piedmont 4 O 0 0 0 0 0 O % Impervious Cover Permanent Pool Dept 3.0 4.0 5.0 6.0 h (feet) 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 5, April 1999 POND E (Constructed Wetland in Tract 2 - FES #42) Impervious (sq ft) (ac) Pervious (sq ft) (ac) Total (ac) Pervious Area 0 0 135743 3.12 3.12 Streets 67117 1.54 0 0.00 1.54 Sidewalks 10735 0.25 0 0.00 0.25 Lots (impervious %) 75600 1.74 0 0.00 1.74 Totals 153452 3.52 135743 3.12 6.64 % Impervious Surface Area = 53 % Surface Area of Permanent Pool: Assumed depth = 3 feet SA/DA ratio = 2.16 % From Table 1.1 Minimum pond surface area (SA) = ( DA * SA/DA ratio)/100 SA = 0.144 acres 6252 sq. ft. Normal pool elevation = 384.25 feet Surface area provided = 0.144 acres 6291 sq. ft. 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(1) where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.528 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 0.292 acre-ft 12714 cu. ft. Riser structure crest elevation = 386.5 feet Runoff storage provided = 0.3'0 ac-ft 16117 cu. ft. O 0\01\01-110\01113\HH\SWMP\PulteStormwaterCalcs Wetlands Jun02.xls LONG LAKE SUBDIVISION - TRACT 2, PHASE 2 POND E - PondPack Output for Wetland Design Job File: K:\01\01-110\01113\H&H\SWMP\PPW WETLANDS\TRACT 2 WETLAND A.PPW Rain Dir: I:\ENGFILE\HAESTAD\PPW RAINFALL DATA\WAKE CO\ -------------------------- -------------------------- JOB TITLE LONG LAKE SUBDIVISION - TRACT 2, PHASE 2 POND E - Extended Detention Wetland at FES #42 Raleigh, North Carolina W&R Project #201113.1 The Modified Rational Method was used to determine peak discharge rates for the 1-year, 2-year, 10-year and 100-year design storm events for the Raleigh/Durham, North Carolina area and size the detention storage for the dry detention pond due to the small drainage area (±6.6 acres). The Modified Rational Method is an extension of the rational method for rainfalls with durations greater than the time of concentration. The method was modified so that the concepts of the rational method (peak discharge) could be used to develop hydrographs for storage routing. The Modified Rational Method within PondPack calculates the storage volume for hydrographs of rainfalls of various durations to determine the critical duration for the design storm as the one requiring the greatest detention storage volume. This critical duration is used to calculate the discharge rate and volume of water that is routed through the pond structure. The hydrograph developed maintains the calculated volume and adjusts the peak discharge rate accordingly. Thus, the peak discharge for the. Modified Rational Method is less than the calculated Rational Method. The rainfall data used in this design was taken from the Intensity-Duration-Frequency Table for the Raleigh area published in the City of Raleigh Stormwater Management Design 0 Manual. The post-development time of concentration was set at 5 minutes to account for the piped drainage system. O O Pond E is an extended detention wetland that is designed to capture the volume of runoff from the first 1-inch of rainfall and slowly release it over a 48 to 72 hour period. In addition, the wetland is designed to pass the 100-year design storm through the riser/barrel outlet structure of the pond. O O O O O O O O Pond E Design Highlights: Normal Pool Elevation = 384.25' Required Surface Area 0.144 acres (6252 sq. ft.) Surface Area Provided = 0.144 acres (6292 sq. ft.) Required Storage Volume = 0.292 ac-ft Storage Volume Provided = 0.370 ac-ft at 386.5' Top of Dam = 388' Calculated Freeboard for the 10-yr design storm = 1.01 ft Calculated Freeboard for the 100-yr design storm = 0.86 ft Outlet Structure: ¦ 48" RCP Riser structure with crest at 386.5' ¦ 48 linear feet of 24" RCP Barrel with inverts at 377.48' and 377' ¦ 1.75" Circular Orifice at 384.25' for extended draw-down LONG LAKE SUBDIVISION - TRACT 2, PHASE 2 POND E - PondPack Output for Wetland Design Table of Contents ****************r***** MASTER SUMMARY ******r***x*********** Watershed....... Mod. Rational Grand Summary ........ 1.01 Master. Network Summary ............. 1.02 *******r************** RAINFALL DATA *********************** 1-yr IDF Table.. 1-yr I-D-F Table ........................ 2.01 2-yr IDF Table.. 2-yr I-D-F Table ........................ 2.01 10-yr IDF Table 10-yr I-D-F Table ........................ 2.02 100-yr IDF Table 100-yr I-D-F Table ........................ 2.02 ********************** TC CALCULATIONS *************** ****** TRACT 2 AREA#1.. Tc Calcs ........................... 3.01 *********************** POND VOLUMES ***************** ****** WETLAND A....... Vol: Elev=Area ..................... 4.01 4 ******************** OUTLET STRUCTURES *************** ****** O OUTLET A........ Outlet Input Data .................. 5.01 O Composite Rating Curve ............. 5.04 O *********************** POND ROUTING ***************** ****** O WETLAND A....... Pond E-V-Q Table ................... 6.01 O O ****************** RATIONAL METHOD CALCS ************* ****** 0 TRACT 2 AREA A.. 1-yr Mod. Rational Storm Calcs .......... 7.01 0 O TRACT 2 AREA A.. 2-yr Mod. Rational Storm Calcs .......... 7.02 TRACT 2 AREA A.. 10-yr Mod. Rational Storm Calcs .......... 7.03 O TRACT 2 AREA A.. 100-yr Mod. Rational Storm Calcs .......... 7.04 O TRACT 2 AREA#1.. C and Area ......................... 7.05 O 0 LONG LAKE SUBDIVISION - TRACT 2, PHASE 2 POND E - PondPack Output for Wetland Design O O O O O O O O Type.... Mod. Rational Grand Summary Page 1.01 Name.... Watershed File.... K:\01\01-110\01113\H&H\SWMP\PPW WETLANDS\TRACT 2 WETLAND A.PPW ************************************************************************ ************************************************************************ * * * * * MODIFIED RATIONAL METHOD * ---- Grand Summary For All Storm Frequencies ---- * * * ************************************************************************ ************************************************************************ Q CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600) O O O O O O O O O O O O O O O O O O Area = .. 6.650 acres .......... ........ Tc .............. = .0833 ........ hrs .......... ................ ................ ...... . ......... . ........... ........ .............. .................... VOLUMES Freq. Adjusted Duration I Qpeak Allowable Inflow Storage years 'C' ---------------- hrs --------- in/hr ----------- cfs -------- cfs ---------- --- ac-ft -------- ac-ft ---------- 1 .608 .4000 2.5289 10.30 8.70 .341 .167 2 .608 .4000 3.1611 12.88 10.90 .426 .208 10 .608 .4167 4.1659 16.97 15.00 I .584 .274 100 .608 .5667 4.9606 20.21 18.00 .946 .463 LONG LAKE SUBDIVISION - TRACT 2, PHASE 2 POND E - PondPack Output for Wetland Design Type.... Master Network Summary Page 1.02 Name.... Watershed File.... K:\01\01-110\01113\H&H\SWMP\PPW WETLANDS\TRACT 2 WETLAND A.PPW MASTER DESIGN STORM SUMMARY Default Network Design Storm File, ID RAL_IDF.IDQ Raleigh IDF Return Event ------------ . 1-yr 2-yr 10-yr 100-yr 0 0 0 0 0 0 0 0 0 0 0 0 Rainfall Type --------------- IDF ---- File ---- IDF ID ---------------- I-D-F Table RAL_ IDF 1-yr IDF Table I-D-F Table RAL IDF 2-yr IDF Table I-D-F Table RAL_ IDF 10-yr IDF Table I-D-F Table RAL IDF 100-yr IDF Table MASTER NETWORK SUMMARY Modified Rational. Method Network (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event ac-ft Trun hrs - cfs ft ac-ft ----------------- *OUTFALL A ---- JCT ------ -- 1 -------- .163 -- -- ------ .4300 -------- .11 -------- ------------ *OUTFALL A JCT 2 .221 .4600 3.77 *OUTFALL A JCT 10 .379 .4300 13.63 *OUTFALL A JCT 100 .740 .5600 20.11 TRACT 2 AREA A AREA 1 .340 .0833 10.30 TRACT 2 AREA A AREA 2 .425 .0833 12.88 TRACT 2 AREA A AREA 10 .584 .0833 16.97 TRACT 2 AREA A AREA 100 .946 .0833 20.21 WETLAND A IN POND 1 .340 .0900 10.30 WETLAND A IN POND 2 .425 .0900 12.88 WETLAND A IN POND 10 .584 .0900 16.97 WETLAND A IN POND 100 .946 .0900 20.21 WETLAND A OUT POND 1 .163 .4300 .11 386.33 .337 WETLAND A OUT POND 2 .221 .4600 3.77 386.71 .406 WETLAND A OUT POND 10 .379 .4300 13.63 386.99 .460 WETLAND A OUT POND 100 .740 .5600 20.11 387.14 .488 E LONG LAKE SUBDIVISION - TRACT 2, PHASE 2 POND E - PondPack Output for Wetland Design Type.... I-D-F Table Page 2.01 Name.... 1-yr IDF Table Tag: 1-yr Event: 1 yr File.... I:\ENGFILE\HAESTAD\PPW RAINFALL DATA\WAKE CO\RAL_IDF.IDF Title... 1-yr Design Storm (80% of 2-yr) Storm... 1-yr IDF Table. Tag: 1-yr Rainfall-Intensity-Duration Curve 0 0 0 0 0 0 0 0 0 O O O 0 0 O O O O O 0 O O O Time, hrs ----------- Intens., in/hr ----------- .0833 4.6080 .1670 3.8080 .2500 3.2320 .3330 2.7760 .5000 2.1600 .6670 1.8240 .8330 1.5520 1.0000 1.3600 1.5000 .9760 2.0000 .7600 3.0000 .5680 6.0000 .3520 12.0000 .2080 24.0000 .1200 Type.... I-D-F Table Name.... 2-yr IDF Table Tag: 2-yr Event: 2 yr File.... I:\ENGFILE\HAESTAD\PPW RAINFALL DATA\WAKE CO\RAL_IDF.IDF Title... 2-yr Storm from City of Raleigh IDF Table Storm... 2-yr IDF Table Tag: 2-yr Rainfall-Intensity-Duration Curve Time, hrs ----------- Intens., in/hr ----------- .0833 5.7600 .1670 4.7600 .2500 4.0400 .3330 3.4700 .5000 2.7000 .6670 2.2800 .8330 1.9400 1.0000 1.7000 1.5000 1.2200 2.0000 .9500 3.0000 .7100 6.0000 .4400 12.0000 .2600 24.0000 .1500 LONG LAKE SUBDIVISION - TRACT 2, PHASE 2 POND E - PondPack Output for Wetland Design Type.... I-D-F Table Page 2.02 Name.... 10-yr IDF Table Tag: 10-yr Event: 10 yr File.... I:\ENGFILE\HAESTAD\PPW RAINFALL DATA\WAKE CO\RAL_IDF.IDF Title... 10-yr Event Table from City of Raleigh IDF Table Storm... 10-yr IDF Table Tag: 10-yr Rainfall-Intensity-Duration Curve Time, hrs .0833 .1670 .2500 .3300 .5000 .6670 .8330 1.0000 1.5000 2.0000 3.0000 6.0000. 12.0000 24.0000 Intens., in/hr 0 O O O 0 0 0 0 O O O 0 0 7.5000 6.1300 5.2500 4.6400 3.7100 3.1500 2.7100 2.4100 1.7400 1.3700 1.0200 .6500 .3900 .2200 Type.... I-D-F Table Name.... 100-yr IDF Table Tag: 100-yr Event: 100 yr File.... I:\ENGFILE\HAESTAD\PPW RAINFALL DATA\WAKE CO\RAL_IDF.IDF Title... 100-yr Event from City of Raleigh IDF Table Storm... 100-yr IDF Table Tag: 100-yr Rainfall-Intensity-Duration Curve Time, hrs .0833 .1670 .2500 .3330 .5000 .6670 .8330 1.0000 1.5000 2.0000 3.0000 6.0000 12.0000 24.0000 Intens., in/hr 9.7200 8.4000 7.2400 6.4700 5.2800 4.4800 3.8800 3.5000 2.5300 2.0000 1.5000 .9600 .5700 .3300 LONG LAKE SUBDIVISION - TRACT 2, PHASE 2 POND E - PondPack Output for Wetland Design Type.... Tc Calcs Name.... TRACT 2 AREA#1 Page 3.01 File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\TRACT 2 WETLAND A.PPW ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ n L -A Segment #1: Tc: User Defined Description: Tc = 5 minutes Segment #1 Time: .0833 hrs ------------------------------7----------------------------------------- ------------------------- ------------------------- Total Tc: .0833 hrs O O O O O O O 0 O O O O O O O O 0 Calculated Tc < Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs LONG LAKE SUBDIVISION - TRACT 2, PHASE 2 POND E - PondPack Output for Wetland Design Type.... Vol: Elev-Area Page 4.01 Name.... WETLAND A File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\TRACT 2 WETLAND A.PPW Elevation Planimeter Area Al+A2+sgr(Al*A2) Volume Volume Sum (ft) (sq.in) (acres) (acres) (ac-ft) (ac-ft) . ------------ ------------- -------- ----------------- --------- ------------- 384.25 ----- .1444 .0000 .000 .000 385.00 ----- .1570 .4520 .113 .113 386.00 ----- .1740 .4963 .165 .278 387.00 ----- .1920 .5488 .183 .461 388.00 ----- .2107 .6038 .201 .663 ID POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2 -ELl) * (Areal + Area2 + sq.rt.(Areal*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between ELl and EL2 O O O O O O O O O O O O O 0 LONG LAKE SUBDIVISION TRACT 2, PHASE 2 POND E - PondPack Output for Wetland Design 0 O O O O O 0 O O O 0 0 Type.... Outlet Input Data Page 5.01 Name.... OUTLET A File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\TRACT 2 WETLAND A.PPW REQUESTED POND WS ELEVATIONS: Min. Elev.= 384.25 ft Increment = .10 ft Max. Elev.= 388.00 ft Spot Elevations, ft 384.25. ********************************************** OUTLET CONNECTIVITY ********************************************** ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) < --- > Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft ----------------- ---- ------- --------- --------- Stand Pipe RI ---> CV 386.500 388.000 Orifice-Circular OR ---> CV 384.250 388.000 Culvert-Circular CV ---> TW 377.480 388.000 TW SETUP, DS Channel LONG LAKE SUBDIVISION TRACT 2, PHASE 2 POND E - PondPack Output for Wetland Design Type.... Outlet Input Data Page 5.02 Name.... OUTLET A File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\TRACT 2 WETLAND A.PPW OUTLET STRUCTURE INPUT DATA 0 O O O O O O O O O 0 Structure ID = RI. Structure Type ----------------- = Stand Pipe ------------- ------ # of Openings = 1 Invert Elev. = 386.50 ft Diameter = 4.0000 ft Orifice Area = 12.5664 sq.ft Orifice Coeff. _ .600 Weir Length = 12.57 ft Weir Coeff. = 3.100 K, Submerged = .000 K, Reverse = 1.000 Kb,Barrel = .000000 (per ft of full flow) Barrel Length = .00 ft Mannings n = .0000 Structure ID = OR Structure Type = Orifice-Circular ------------------------------------ # of Openings = 1 Invert Elev. = 384.25 ft Diameter = .1458 ft Orifice Coeff. _ .600 LONG LAKE SUBDIVISION - TRACT 2, PHASE 2 POND E - PondPack Output for Wetland Design Type.... Outlet Input Data Page 5.03 Name.... OUTLET A File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\TRACT 2 WETLAND A.PPW OUTLET STRUCTURE INPUT DATA 0 0 O O O O O O O O O O O 0 0 Structure ID = CV Structure Type = - -- Culvert-Circular ----------------- --------------- - No. Barrels = 1 Barrel Diameter = 2.0000 ft Upstream Invert = 377.48 ft Dnstream Invert = 377.00 ft Horiz. Length = 48.00 ft Barrel Length = 48.00 ft Barrel Slope = .01000 ft/ft OUTLET CONTROL DATA ... Mannings n = .0130 Ke = .5000 (forward entrance loss) Kb = .012411 (per ft of full flow) Kr = .5000 (reverse entrance loss) HW Convergence = .001 +/- ft INLET CONTROL DATA. .. Equation form = 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c = .03980 Inlet Control Y = .6700 T1 ratio (HW/D) = 1.155 T2 ratio (HW/D) = 1.302 Slope Factor = -.500 Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 379.79 ft ---> Flow = 15.55 cfs At T2 Elev = 380.08 ft ---> Flow = 17.77 cfs Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs LONG LAKE SUBDIVISION - TRACT 2, PHASE 2 POND E - PondPack Output for Wetland Design Type.... Composite Rating Curve Name.... OUTLET A Page 5.04 File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\TRACT 2 WETLAND A.PPW ***** COMPOSITE OUTFLOW SUMMARY **** u • 0 O O O O O O O O O • WS Elev, Total Q Notes -------- -------- ------ -- Converge ----------- --- ----------- Elev. Q TW Elev Error ft cfs ft +/-ft Contributing Structures - -------- 384.25 ------- .00 ------ Free -- ----- - Outfall ------------------------ (no Q: RI,OR,CV) 384.30 .00 Free Outfall OR,CV (no Q: RI) 384.40 .02 Free Outfall OR,CV (no Q: RI) 384.50 .03 Free Outfall OR,CV (no Q: RI) 384.60 .04 Free Outfall OR,CV (no Q: RI) 384.70 .05 Free Outfall OR,CV (no Q: RI) 384.80 .06 Free Outfall OR,CV (no Q: RI) 384.90 .06 Free Outfall OR,CV (no Q: RI) 385.00 .07 Free Outfall OR,CV (no Q: RI) 385.10 .07 Free Outfall OR,CV (no Q: RI) 385.20 .08 Free. Outfall OR,CV (no Q: RI) 385.30 .08 Free Outfall OR,CV (no Q: RI) 385.40 .08 Free Outfall OR,CV (no Q: RI) 385.50 .09 Free Outfall OR,CV (no Q: RI) 385.60 .09 Free Outfall OR,CV (no Q: RI) 385.70 .09 Free Outfall OR,CV (no Q: RI) 385.80 .10 Free Outfall OR,CV (no Q: RI) 385.90 .10 Free Outfall OR,CV (no Q: RI) 386.00 .10 Free Outfall OR,CV (no Q: RI) 386.10 .11 Free Outfall OR,CV (no Q: RI) 386.20 .11 Free Outfall OR,CV (no Q: RI) 386.30 .11 Free Outfall OR,CV (no Q: RI) 386.40 .12 Free Outfall OR,CV (no Q: RI) 386.50 .12 Free Outfall OR,CV (no Q: RI) 386.60 1.35 Free Outfall RI,OR,CV 386.70 3.61 Free Outfall RI,OR,CV 386.80 6.53 Free Outfall RI,OR,CV 386.90 9.98 Free Outfall RI,OR,CV 387.00 13.90 Free Outfall RI,OR,CV 387.10 18.24 Free Outfall RI,OR,CV 387.20 22.95 Free Outfall RI,OR,CV 387.30 28.01 Free Outfall RI,OR,CV 387.40 33.40 Free Outfall RI,OR,CV 387.50 39.08 Free Outfall RI,OR,CV 387.60 45.00 Free Outfall RI,CV (no Q: OR) 387.70 46.95 Free Outfall RI,CV (no Q: OR) 387.80 47.22 Free Outfall RI,CV (no Q: OR) 387.90 47.48 Free Outfall RI,CV (no Q: OR) 388.00 47.74 Free Outfall RI,CV (no Q: OR) LONG LAKE SUBDIVISION - TRACT 2, PHASE 2 POND E - PondPack Output for Wetland Design Type.... Pond E-V-Q Table. Page 6.01 Name.... WETLAND A File.... K:\01\01-110\01113\H&H\SWMP\PPW WETLANDS\TRACT 2 WETLAND A.PPW LEVEL POOL ROUTING DATA HYG Dir = K:\01\01-110\01113\H&H\SWMP\PPW WETLANDS\ Inflow HYG file = NONE STORED - WETLAND A IN 1-yr Outflow HYG file = NONE STORED - WETLAND A OUT 1-yr Pond Node Data = WETLAND A Pond Volume Data = WETLAND A Pond Outlet Data = OUTLET A No Infiltration INITIAL CONDITIONS --- --------------------- Starting WS Elev = -------- 384.25 -- ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment _ .0100 hrs O O O O O O O 0 Elevation Outflow Storage Area Infilt. Q Total 2S/t + O ft cfs ac-ft acres cfs -------- cfs ------------ cfs ---------- ----------- 384.25 ------------ .00 ----------- .000 ----------- .1444 --- .00 .00 .00 384.30 .00 .007 .1452 .00 .00 17.52 384.40 .02 .022 .1469 .00 .02 52.89 384.50 .03 .037 .1485 .00 .03 88.65 384.60 .04 .052 .1502 .00 .04 124.79 384.70 .05 .067 .1519 .00 .05 161.36 384.80 .06 .082 .1536 .00 .06 198.33 384.90 .06 .097 .1553 .00 .06 235.71 385.00 .07 .113 .1570 .00 .07 273.51 385.10 .07 .129 .1587 .00 .07 311.70 385.20 .08 .145 .1603 .00 .08 350.30 385.30 .08 .161 .1620 .00 .08 389.31 385.40 .08 .177 .1637 .00 .08 428.73 385.50 .09 .194 .1654 .00 .09 468.55 385.60 .09 .210 .1671 .00 .09 508.78 385.70 .09 .227 .1688 .00 .09 549.43 385.80 .10 .244 .1705 .00 .10 590.49 385.90 .10 .261 .1723 .00 .10 631.98 386.00 .10 .278 .1740 .00 .10 673.88 386.10 .11 .296 .1758 .00 .11 716.19 386.20 .11 .314 .1775 .00 .11 758.95 386.30 .11 .331 .1793 .00 .11 802.13 386.40 .12 .349 .1811 .00 .12 845.74 LONG LAKE SUBDIVISION - TRACT 2, PHASE 2 POND E - PondPack Output for Wetland Design Type.... Pond E-V-Q Table Page 6.02 Name.... WETLAND A File.... K:\01\01-110\01113\H&H\SWMP\PPW WETLANDS\TRACT 2 WETLAND A.PPW LEVEL POOL ROUTING DATA HYG Dir = K:\01\01-110\01113\H&H\SWMP\PPW WETLANDS\ Inflow HYG file = NONE STORED - WETLAND A IN 1-yr Outflow HYG file = NONE STORED - WETLAND A OUT 1-yr Pond Node Data = WETLAND A Pond Volume Data = WETLAND A Pond Outlet Data = OUTLET A No Infiltration 0 INITIAL CONDITIONS --------- ------------- ------- ----- Starting WS Elev _ 384.25 ft Starting Volume _ .000 ac-ft Starting Outflow _ .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment _ .0100 hrs O O O O O O O O 0 • • Elevation Outflow Storage Area Infilt. Q Total 2S/t + 0 ft cfs ac-ft acres cfs --- cfs ------------ cfs ---------- ----------- 386.50 ------------ .12 ------------ .368 ---------- .1829 -------- .00 .12 889.79 386.60 1.35 .386 .1847 .00 1.35 935.49 386.70 3.61 .405 .1865 .00 3.61 982.66 386.80 6.53 423 .1883 .00 6.53 1030.94 386.90 9.98 .442 .1902 .00 9.98 1080.20 387.00 13.90 .461 .1920 .00 13.90 1130.36 387.10 18.24 .481 .1938 .00 18.24 1181.37 387.20 22.95 .500 .1957 .00 22.95 1233.21 387.30 28.01 .520 .1975 .00 28.01 1285.85 387.40 33.40 .540 .1994 .00 33.40 1339.27 387.50 39.08 .560 .2012 .00 39.08 1393.43 387.60 45.00 .580 .2031 .00 45.00 1448.27 387.70 46.95 .600 .2050 .00 46.95 1499.60 387.80 47.22 .621 .2069 .00 47.22 1549.70 387.90 47.48 .642 .2088 .00 47.48 1600.27 388.00 47.74 .663 .2107 .00 47.74 1651.29 LONG LAKE SUBDIVISION - TRACT 2, PHASE 2 POND E - PondPack Output for Wetland Design Type.... Mod. Rational Storm Calcs Page 7.01 Name.... TRACT 2 AREA A Tag: 1-yr Event: 1 yr File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\TRACT 2 WETLAND A.PPW Storm... 1-yr IDF Table Tag: 1-yr MODIFIED RATIONAL METHOD ---- Summary for Single Storm Frequency ---- Q = CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600) RETURN FREQUENCY: ----------------- 1 yr 'C' ---------- Adjustment ----------- = 1.000Allowable ------------------- Q = 8.70 --------- cfs ---------- Hydrograph Storm Duration, Td = .4000 hrs Tc = .0833 hrs Hydrograph File: ................. .. .......... ..1.yr .... ........... ........... ....... ....... ............ ............ ......... ......... .......... ........... VOLUMES Wtd. Adjusted Duration Intens. Area Qpeak Inflow Storage 'C' 'Cl hrs in/hr acres cfs - - -- -- ac-ft --------- ac-ft ---------- ----------------- .608 .608 ---------- .0833 ----------- 4.6080 ------- 6.650 --- - - 18.77 .129 .069 .608 .608 .1667 3.8112 6.650 15.53 I .214 .124 .608 .608 .2500 3.2320 6.650 13.17 .272 .152 .608 .608 .3333 2.7748 6.650 11.30 .311 .162 O O O O O O O O 0 ************************************************************ Storage Maximum .608 .608 .4000 2.5289 6.650 10.30 .341 .167 **************************************************************************** .608 .608 .5000 2.1600 6.650 8.80 .364 .154 .608 .608 .6667 1.8247 6.650 7.43 Qpeak < Qallow LONG LAKE SUBDIVISION TRACT 2, PHASE 2 POND E - PondPack Output for Wetland Design Type.... Mod. Rational Storm Calcs Page 7.02 Name.... TRACT 2 AREA A Tag: 2-yr Event: 2 yr File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\TRACT 2 WETLAND A.PPW Storm... 2-yr IDF Table Tag: 2-yr MODIFIED RATIONAL METHOD ---- Summary for Single Storm Frequency ---- CI Q CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600) RETURN FREQUENCY: ----------------- 2 yr 'C' ---------- Adjustment ----------- = 1.000Allowable ------------------- Q = 10.90 ---------- cfs --------- Hydrograph Storm Duration, Td = .4000 hrs Tc = .0833 hrs Hydrograph File: 2-yr VOLUMES Wtd. Adjusted Duration Intens. Area Qpeak Inflow Storage -C' 'C' hrs in/hr acres cfs ac-ft --------- ac-ft ---------- ----------------- .608 .608 ---------- .0833 ----------- 5.7600 -------- 6.650 -------- -- 23.46 .162 .086 .608 .608 .1667 4.7640 6.650 19.41 I .267 .155 .608 .608 .2500 4.0400 6.650 16.46 I .340 .190 .608 .608 .3333 3.4685 6.650 14.13 .389 .202 ************************************************************ Storage Maximum .608 .608 .4000 3.1611 6.650 12.88 I .426 .208 **************************************************************************** .608 .608 .5000 2.7000 6.650 11.00 .454 .192 .608 .608 .6667 2.2808 6.650 9.29 Qpeak < Qallow O O O O O O O O 0 0 • • LONG LAKE SUBDIVISION - TRACT 2, PHASE 2 POND E - PondPack Output for Wetland Design Type.... Mod. Rational Storm Calcs Page 7.03 Name.... TRACT 2 AREA A Tag: 10-yr Event: 10 yr File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\TRACT 2 WETLAND A.PPW Storm... 10-yr IDF Table Tag: 10-yr MODIFIED RATIONAL METHOD ---- Summary for Single Storm Frequency ---- Q CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600) RETURN ------ FREQUENCY: ----------- 10 yr 'C' Adjustment = 1.000Allowable ----------------------------------------- Q = 15.00 --------- cfs --------- Hydrograph Storm Duration, Td = .4167 hrs Tc = .0833 hrs Hydrograph File: ................. 10-yr ......... ........... ........ ............ .......... ......... ...... ........... ......... ........... ........ ............ ................... VOLUMES Wtd. Adjusted Duration Intens. Area Qpeak Inflow Storage 'C' 'C' hrs in/hr acres cfs ac-ft --- --- ac-ft --------- ------ .608 ----------- .608 --------- .0833 ----------- 7.5000 -------- 6.650 --------- -- 30.55 - --- .210 .107 .608 .608 .1667 6.1355 6.650 24.99 I .344 .189 .608 .608 .2500 5.2500 6.650 21.39 .442 .235 .608 .608 .3333 4.6218 6.650 18.83 .519 .260 ************************************************************ Storage Maximum .608 .608 .4167 4.1659 6.650 16.97 .584 .274 **************************************************************************** 608 .608 .5000 3.7100 6.650 15.11 .624 .263 608 .608 .6667 3.1511 6.650 12.84 Qpeak < Qallow O O O O O O O O O O 0 • LONG LAKE SUBDIVISION - TRACT 2, PHASE 2 POND E PondPack Output for Wetland Design Type.... Mod. Rational Storm Calcs Page 7.04 Name.... TRACT 2 AREA A Tag: 100-yr Event: 100 yr File.... K:\01\01-110\01113\H&H\SWMP\PPW_WETLANDS\TRACT 2 WETLAND A.PPW Storm... 100-yr IDF Table Tag: 100-yr MODIFIED RATIONAL METHOD ---- Summary for Single Storm Frequency ---- Q = CiA * Units Conversion; Where Conversion = 43560 / (12 * 3600) RETURN ------- FREQUENCY: ---------- 100 yr --------- 'C' Adjustment = ------------------ 1.000Allowable -------------- Q = 18.00 ---------- cfs -------- Hydrograph Storm Duration, Td = .5667 hrs Tc = .0833 hrs Hydrograph File: ................. 100-yr ......... ........... ....... .............. .......... ........ ...... ........... ......... ........... ....... ............... .................. VOLUMES Wtd. Adjusted Duration Intens. Area Qpeak Inflow Storage -C' 'C' hrs in/hr acres cfs - --- ac-ft ---------- ac-ft -------- ------ .608 ----------- .608 --------- .0833 ----------- 9.7200 ------- 6.650 -------- - 39.59 .273 .149 .608 .608 .1667 8.4053 6.650 34.24 .472 .286 .608 .608 .2500 7.2400 6.650 29.49 I .609 .361 .608 .608 .3333 6.4676 6.650 26.35 I .726 .416 .608 .608 .5000 5.2800 6.650 21.51 .889 .455 ************************************************************ Storage Maximum .608 .608 .5667 4.9606 6.650 20.21 .946 .463 **************************************************************************** n -A .608 .608 .6667 4.4816 6.650 18.26 1.006 .448 .608 .608 .8333 3.8792 6.650 15.80 Qpeak < Qallow O O O O O O 0 0 LONG LAKE SUBDIVISION - TRACT 2, PHASE 2 POND E - PondPack Output for Wetland Design O O C11 O O O O O 0 • Type.... C and Area Name.... TRACT 2 AREA#1 Page 7.05 File.... K:\01\01-110\01113\H&H\SWMP\PPW WETLANDS\TRACT 2 WETLAND A.PPW RATIONAL C COEFFICIENT DATA ......................................................................... ......................................................................... Area C x Area Soil/Surface Description C acres acres -------------------------------- Streets -------- .9500 ---------- 1.540 ---------- 1.463 Sidewalk .9500 .250 .238 Lots (impervious .9500 1.740 1.653 Pervious .2200 3.120 .686 WEIGHTED C & TOTAL AREA ---> ................................. ................................. .6075 ............ ............ 6.650 ............. ............. 4.040 ............... ............... LONG LAKE SUBDIVISION - TRACT 2, PHASE 2 POND E - PondPack Output for Wetland Design Elev. vs. Flow STAGE-DISCHARGE FUNCTION FOROUTLET A O O O O O O 0 W N U 3 0 LL Hydrograph for 1-yr Design Storm WETLAND IN vs OUT Plotted Curves - OUTLET A Plotted Curves WETLAND A IN 1-yr WETLAND A OUT 1-yr 0 10 20 30 40 50 Flow (cfs) 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Time (hrs) LONG LAKE SUBDIVISION - TRACT 2, PHASE 2 POND E - PondPack Output for Wetland Design Hydrograph for 2-yr Design Storm WETLAND A IN vs OUT O O O O 0 a U 3 0 LL 11 10 v 9 3 LL 8 1 0 0.0 Hydrograph for 10-yr Design Storm WETLAND IN ?s OUT I 3.0 3.5 4.0 Plotted Curves WETLAND A IN 2-yr WETLANDA OUT 2-yr Plotted Curves WETLAND A IN 10-yr WETLAND A OUT 10-yr 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Time (hrs) 0.5 1.0 1.5 2.0 2.5 Time (hrs) LONG LAKE SUBDIVISION - TRACT 2, PHASE 2 POND E - PondPack Output for Wetland Design Hydrograph for 100-yr Design Storm WETLAND IN vs OUT N U 3 0 Volume os. Time MINIMUM DRAIN TIME - Runoff from first 1" Rainfall O O O 40 0.30 .. .. _.I ... ... 0.25 _ I t a l- _ 0.20 ... w E 0.15 - o > -. ... 0.10 0.05 ... E ). v 0 10 20 30 40 50 60 70 Time (hrs) Plotted Curves WETLAND A IN 100-yr WETLAND A OUT 100-yr Plotted Curves MIN DRAIN OUT 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Time (hrs)