HomeMy WebLinkAboutNCC190930_ESC Approval Submitted_20190710 U
c0
dry CtA�o�
MECKLENBURG COUNTY
Land Use & Environmental Services Agency
Storm Water Services
7/3/2019
Email: 2raham8401(&,ao1xom
Rodney Graham
PO Box 2562
Davidson,NC 28036
Re: Davidson Springs Phase III& IV (9389146)
Approval as noted of plans
Denuded acreage 3.1
Dear Mr. Graham:
Please be advised that the above referenced plan has been approved by this Office. This approval is
required prior to applying for the Construction Stormwater General Permit(NCGO10000). Application
for this permit can be made at htt12s://ded.nc.gov/NCG01. Please contact Chanell Hatch(980-555-5775),
Erosion Control Inspector to set up a pre-construction meeting after obtaining your Certificate of
Coverage (COC)from NCDEQ. Refer to the attached Fact Sheet for additional information.
The Planning Department of the Town of Davidson is being notified of this approval by copy of this
letter. Plans that are stamped approved will be held within EPM's"approved package"for printing out as
needed.
In addition,please always print out an approved set with approval stamps to be kept out at the site.
If you have any questions,please give me a call at 980-314-3240.
Sincerely,
VWJJ. *4•CL*
Michael A.Machttyre,PE
Mecklenburg County Project Manager
CC: Town of Davidson Planning Department—Travis Johnson
Project Manager—Skip Notte—Dewberry Engineers Inc.
Erosion Control Inspector—Chanell Hatch
Mecklenburg County Land Development-Tommy Keziah
EPM Approved project
PEOPLE • PRIDE • PROGRESS • PARTNERSHIPS
• 2145 Suttle Avenue • Charlotte,North Carolina 28208-5237 •
www.mecklenburgcountync.gov