HomeMy WebLinkAboutWQ0038534_Permit (Issuance)_20160610 PAT MCCRORY Governor Lea DONALD R. VAN DER VAART Secretar) !i S. JAY ZIMMERMAN Water Resources Director ENVIRONMENTAL QUALITY i June 10,2016 Mr. Terry Houk Director of Public Services City of High Point P.O. Box 230 High Point,NC 27261 Subject: Permit No. WQ0038534 City of High Point Bethel Drive Pump Station Replacement Wastewater Collection System Extension Permit Guilford County Dear Mr.Houk: In accordance with your application received June 7, 2016, we are forwarding herewith Permit E No. WQ0038534 dated June 10, 2016, to the City of High Point (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein.This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition II.1: This permit shall not be automatically transferable; a request must be made and approved. Condition HA: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system- wide collection system permit issued to the Permittee. It shall be responsibility of the Permittee to ensure that the as-constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute§143-215.6A through§143-215,6C,construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina-licensed Professional Engineer to the licensing board. 450 West Hanes Mill Road,Suite 300,Winston-Salem,NC 27105 Phone:336-776-9800\Internet:www.nmateroualitv.ora j State of North Carolina I Environmental Quality I Water Resources it City of High Point k Permit No.WQ0038534 EEEE If any parts,requirements, or limitations contained in this permit are unacceptable,you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Mike Mickey at(336) 776-9697 or via e-mail at mike.mickey@ncdenr.gov. Sincerely, 'Y> . for S.Jay Zimmerman,P.G. Director,Division of Water Resources i by Sherri V.Knight,PE,Regional Supervisor Water Quality Regional Operations Section Winston-Salem Regional Office j Division of Water Resources,NCDEQ I cc: Randy McNeill,PE(Davis-Martin-Powell&Assoc.,6415 Plank Road,High Point,NC 27265) Winston-Salem Regional Office Files Water Resources Central Files PERCS(electronic copy) Page 2 of 9 STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENTAL QUALITY WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143,General Statutes of North Carolina as amended,and other applicable Laws,Rules, and Regulations,permission is hereby granted to the City of High Point j Guilford County for the construction and operation of approximately 8.5 linear feet of 12-inch gravity sewer;a 850- gallon per minute pump station with duplex pumps, on-site audible and visual high water alarms, telemetry, and a permanent generator with automatic transfer switch; as well as approximately 11.3 linear feet of 10-inch force main to serve as a replacement pump station as part of the Bethel Drive Pump Station Replacement project, and the discharge of"0" gallons per day of new wastewater into the City of High Points existing sewerage system, pursuant to the application received June 7, 2016, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable, the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting data subsequently filed and approved I by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. for S.Jay ZinunermanQI3.G Director,Division of Water Resources By Authority of The Environmental Management Commission Permit Number: WQ0038534 Permit Issued: June 10, 2016 f jI i I Page 3 of 9 ' G i SUPPLEMENT TO PERMIT COVER SHEET City of High Point is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Westside High Pont Wastewater Treatment Facility in accordance with Permit Number NC0024228. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable;and the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina-licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as-constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and the Special Conditions identified below. I. SPECIAL CONDITIONS 1. Each pump station shall be clearly and conspicuously posted using a weatherproof sign with a pump station identifying name/number,24-Hour Emergency telephone number, and name of the owner/operator of the sewer system/pump station and instructions to call the number in the event of alarm activation or other emergency. Simplex pump stations or vacuum sewer pits serving a single-family residence may have a placard or sticker on the control panel in lieu of a sign. [15A NCAC 02T.0305(h)(2)] III II. STANDARD CONDITIONS I 1. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership,or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved,and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 02T.0104;G.S 143-215.1(d3)] Page 4 of 9 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T;the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable;the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 02T.01101 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T.0110] f 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system-wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required,the following performance criteria shall be met: 115A NCAC 02T.0108(b)]: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High-priority sewer lines shall be inspected at least once per every six-months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute§143-215.1C. I h. A Grease Control Program is in place as follows: i. Page 5 of 9 1. For public owned collection systems,the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi-annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease-related sanitary sewer overflows. j. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. k. Documentation shall be kept for Subparagraphs(a)through(i)of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. The Permittee shall report by telephone to a water resources staff member at the Winston- Salem Regional Office, telephone number (336) 776-9800, as soon as possible, but in no case more than 24 hours, following the occurrence or first knowledge of the occurrence of either of the following: 1 a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps,line blockage or breakage, etc.;or b. Any SSO and/or spill over 1,000 gallons;or c. Any SSO and/or spill, regardless of volume,that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858- 0368 or(919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO(or the most current Division approved form)within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part II of Form CS-SSO(or the most current Division approved form)can also be completed to show that the SSO was beyond control. [G.S. 143-215.1C(al)] 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)] C Page 6 of 9 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings(plan&profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media(CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers,separation distances, material changes,etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing,velocity,pump cycle times,and level control settings,pump station buoyancy,wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes,shall be provided. j c. Changes to the project that do not result in non-compliance with this permit,regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case-by-case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After-construction requests are discouraged by the Division and may not be approved,thus requiring replacement or repair prior to certification&activation.[15A NCAC 02T.0116] S. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm Ii Page 7 of 9 4 supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case-by-case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T.0116] 10. Failure to abide by the conditions and limitations contained in this permit;15A NCAC 2T;the Divisions Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Divisions Minimum Design Criteria for the Fast-Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes§143-215.6A through§143-215.6C,construction of additional or replacement i wastewater collection facilities, and/or referral of the North Carolina-licensed Professional Engineer to the licensing board. [15A NCAC 02T.0104; 15A NCAC 02T.0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily,including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities.[15A NCAC 02T.0110;15A NCAC 02T.0108(b)] I 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which maybe required by the Division or any other Federal, State, of Local government agencies. [G.S. 143-215.1(b)] I i Page 8 of 9 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: City of High Point PERMIT#: WQ0038534 PROJECT: Bethel Drive Pump Station Replacement ISSUE DATE:June 10,2016 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions F thereof. I Printed Name, Title Signature Date ENGINEERS CERTIFICATION I, as a duly registered Professional En ineer m the State of North Carolina, having been authorized to observe (❑ periodically, LJ weekly, ❑ full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit,15A NCAC 02T;the Division of Water Resources'(Division)Gravity Sewer Minimum Design Criteria adopted February 12,1996 as applicable;the Divisions Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable;and other supporting materials. .............. 4 North Carolina Professional Engineer's Seal w/signature& date: ❑ Final ❑ Partial(include description) Certification Comments/Qualifiers (attach if necessary): .................................................. ...:............. NC DWR-Water Quality Regional Operations Section, 450 West Hanes Mill Road,Suite 300, Winston-Salem, NC 27105 Winston-Salem Regional Office Phone: (336)776-9500 FAX: (336)-776-9797 Application Number: USE THE TAB KEY TO MOVE FROM FIELD TO FIELD v (to be completed by DWR) 11. Owner/Permittee: --- - - - - ------ 1 s. Cityof High Point, NC Full Legal Name(company,municipality, HOA, utility, etc.) Z -------. ..... ..------ --------. ----- ---- _____._._._ .._._.-._._._._ . . ------- - ___ ---- -------- - -----.._._ O �1b. Terry Houk, Director of Public Services Signing Official Name and Title(Please review 15A NCAC 2T 0106(b)for authorized signing officials) _._.__. _._._.._. ------ . .. __._._ ------_ ---_._._ _.__ _._ _- __._.._._ _._._.._.__._._ 1 c. The legal entity who will own this system is �1d. -- Box---❑ Federal® Municipality State/County❑ Private Partnership Po ❑ Corporation❑ Other(specify).____ nt LL Mailing Address City . .----..__.._._ --.._..__._..__ ------ _._._.._._._._------ _..-.__-.._._._._.__ 1f. North Carolina 11g. 27261 Z State Zip Code _._ - -._._._.._._._._._ 1h. (336)883-3215 In 1j. Ter .Houk hi h ointnc. ov QTelephone Facsimile I E-mail V 2 Project(Facility) Information: _.. --- -­ . .. . - .J 2a. Bethel Drive Pump Station Replacement 2b. Guilford CL Brief Project Name(permit will refer to this name) County Where Project is Located a -- -- - ____ __- __ ___ ____ __ __. Q 3 Contact Person Q 3a. Randy McNeill PE(Davis-Martin-Powell @ p Name and Affiliation of Someone Who Can Answer Questions About this Application _._._. -_._- __ ... 3b. 336 886-4821 !3c. rmcnelll din Inc.com Phone Number E-mail 11. Project is® New ❑ Modification(of an existing permit) If Modification, Permit No.: 2. Owner is ® Public(skip to Item B(3)) ❑ Private(go to Item 2(a)) 2a. If private,applicant will be: 2b. If sold,facilities owned by a(must choose one) ❑ Retaining Ownership(i.e.store, church, single office,etc.)or ❑ public Utility(Instruction D) ❑ Leasing units(lots,townhomes,etc.-skip to Item B(3)) ❑Homeowner Assoc./bevel r.Llnstru tion E El Selling units(lots,townhomes, etc.-go to Item B(2b)) �� Uepar ment)Of Environmental Qualit 'l 3. City of High Point, NC 1 Owner of Wastewater Treatment Facility(WWTF)Treating Wastewater From This Project p n" 4a. Westside WWTF 14b. NCO024228 5 u Name of WWTF 1 WWTF Permit No `„': IYlSton-Sa em .` LL 5a. Cityof High Point 5b. 18-in ®Gravity 5a Regions 0 ce Owner of Downstream Sewer Receiving Sewer Size ❑ Force Main permit#of Downstream Sewer Instruction F ( ) ___- --...___._._._ __._..__-__ Z r6. The origin.of this wastewater is (check all that apply): _ .. I_ ❑ Residential Subdivision ❑ Retail(Stores, shopping centers) _% Domestic/Commercial ❑Apartments/Condominiums ❑ Institution % Industrial ❑ Mobile Home Park ❑ Hospital LL1 ❑ School ❑ Church (Attach Description) d ❑ Restaurant ❑ Nursing Home %Other CIS [I Office El Other(specify) ____.__ _..__...._IAttaGh_D&6GrlDtIOf1L._.._ I 7. Volume of wastewater to be allocated or permitted for this particular project: None gallons per day *Do not include future flows or previously permitted allocations , 8. If the permitted flow is zero, indicate why: ❑ Pump Station, Outfall or Interceptor Line where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit No. ® Rehabilitation or replacement of existing sewer with no new flow expected (see 15A NCAC 02T.0303 to determine if a permit is required) FTA 10-14 APPLICATION Page 4 of 6 9. Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2T.0114 for the value in Item B(7)AND/OR the design flow for line or pump station sizing if a reduced or zero flow is being requested in Item B(7). Values other than that in 15A NCAC 2T.0114(b)and(c)must be supported with actual water or wastewater use data in accordance with 15A NCAC 2T.0114(f). I I 1__------...----------------------------...----------...--------------------------- 110. Summary of Sewer Lines to be Permitted(attach additional sheets if necessary) Size(inches) Length(feet) New Gravity or Additional Force Main r- ---- _._._._.._____. .------_-- 12 DI 1 8.5 New Gravity -- -.._._ --_--_-.__ !_..__ 10"DI 11.3 Additional Force Main -._._ _._._.__._.._.._._ ...--__.__._.------ i Q ._._.._ _._. -- - ---- - - W I --------- ,.-- - Z 111. Summary of Pump Stations w/associated Force Mains to be Permitted(attach additional sheets as necessary) 0; Pump Station Location ID: (self chosen-as shown on plans/map for reference) V Longitude: 35°55'13.8"N Latitude: 80°01'11.7"W Z O OpGPM@TDHonal int )II _____ .-._.._._._.___.__.__._. Design Flow Power Reliability Option Q (MGD) 12 pportable generatoermanent rw/MTS r w1ATS;1 Force Main Sae Force Main Length L- -- N/A 850GPM_a@_69'TDH,._.._._ 1 10" 1720' -- --- —._. ...... -- -. Iy Z (Pump Station Location ID: (self chosen-as shown on plans/map for reference) (Longitude: Latitude: _.__._._._._. _- ...._._______ .. ._._.___._._. _._.__.__.__._ W Design Flow I Power Reliability Option IL On (MGD) i GPM @TDH 1 -permanent generatorw/ATS; Force Main Sae Force Main Length perational Poi . 2 portable generator w/MTS --_-_._... .- -------------- ----- -- 12. Will the wastewater flow in the proposed sewer lines or pump stations be able to be directed to another treatment facility? ❑Yes® No If Yes, permit number of 2nd treatment facility .(RO—if"yes"to 13,12 please contact the Central Office PERCS Unit) 13. Does the sewer system comply with the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version),the Gravity Sewer Minimum Design Criteria(latest version)and 15A NCAC Chapter 2T as applicable? I I ®Yes ❑ No If No, complete and submit the Variance/Alternative Design Request(VADC 10-14)application and supporting II documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. FTA 10-14 APPLICATION Page 5 of 6 14. Have the following permits/certifications been submitted for approval for the system or project to be served? Wetland/Stream Crossings-General Permit or 401Certification? ❑Yes ❑ No ® N/A Sedimentation and Erosion Control Plan? ❑Yes ❑ No ® N/A Trout Buffer Waiver? ❑Yes ❑ No ® N/A Stormwater? ❑Yes ❑ No ® N/A 15. Does this project include any high priority lines(15A NCAC 02T.0402 (2))involve aerial lines,siphons, or interference manholes)? These lines will be considered high priority and must be checked once every six months Check if Yes: ❑ and provide details: - -._.._._---- _-_------._. . ._._.._._-_- _-._... --- - - - 1. Owner/Permittee's Certification: (Signature of Signing Official and Project Name) 1, Terry Houk attest that this application for Bethel Drive Pump Station Replacement has been reviewed by me and I. is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215.6A and 143- j 215.6E any person who knowingly makes any false statement, representation, or certification in any application shall be j guilty of a Class 2 misdemeanor, which may include a fine not to exceed$10,000 as well as civil penalties up to$25,000 per violation. _-__ __.._ ---_.---___ --- 1 a. 1 /3 Signing Official lure Date i ENGINEERING DESIGN DOCUMENTS MUST BE COMPLETED PRIOR TO SUBMITTAL OF THIS APPLICATION. THESE DOCUMENTS MUST INCLUDE PLAN AND PROFILE OF SEWERS, THEIR PROXIMITY fn j TO OTHER UTILITIES, DESIGN CALCULATIONS, ETC. REFER TO 15A NCAC 02T .0305 I— 12. Professional Engineer's Certification: (Signature of Design Engineer and Project Name) V I, ,attest that this application for Bethel Drive Pump Station Replacement has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, H and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design VI Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division V guidance. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6E any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed$10,000 as well as civil penalties up to$25,000 per violation. i ___- _._._._._._ _._.__.__.__ __-_....---.___--- 2a. Randy McNeill CArfQ ,%-, Professional Engineer Name o, 2b. Davis-Martin-Powell&Associates, Inc Engineering Firm 2c.6415 Old Plank Road Mailing Address s _. _______ y FNGI Nti� �� 2d. High Point 2e. NC 2f 27266 + C City State Zip !,�® m��`91®vim - 2g. 336-819-5283 2h. 336-886-4458 21. rmcneill(a -inc.com r // Telephone Facsimile E-mail NC PE Seal,Si natu E Date FTA 10-14 APPLICATION Page 6 of 6 I DAMS 0 MARTIN 0 POWELL ENGINEERS & SURVEYORS dmp June 6, 2016 Re: City of High Point, NC Bethel Dr. Pump Station Replacement DMP Project 150301 (BF) NC Department of Environmental Quality Enviro Mr. Corey Basinger v NCDEQ— DEMILR Received 450 West Hanes Mill Road Suite 300 Winston-Salem, North Carolina 27105 JUN 0 7 2016 Winston-Salem ra Dear Corey: Regional Office On behalf of the City of High Point and in regards to the referenced project we are enclosing the following information for your review and approval: 0 Two (2) copies of Fast-Track Application for Gravity Sewers, Pump Stations and Forcemains 0 Two (2) copies of USGS site map exhibit 0 $480 review fee The proposed project will involve the replacement of the Bethel Drive pump station and a slight increase in pumping capacity from approximately 800 to 850 gpm, with no new sewer capacity at this time. City staff has talked with your office and determined that a FTSE form is not required since no new flows are associated with this project. We trust the enclosed information is complete and will allow for approval to be issued at an early date. However, should you have any questions or require additional information, please contact our office. Sincerely, DAVIS-MARTIN-POWELL &ASSOCIATES, INC. Randy McNeill, PE C: Terry Houk, City of High Point Tyler Barrier, City of High Point(enc) File (enc) T:336-886-4821 1 F:336-886-4458 1 www.dmp-inc.com 6415 Old Plank Road, High Point,NC 27265 i Mickey, Mike From: Randy McNeill <rmcneill@dmp-inc.com> Sent: Tuesday,June 07, 2016 4:39 PM To: Mickey, Mike Cc: 'Ben Palmer' Subject: RE: Bethel Drive PS Replacement Mike, it's an existing force main. We are just connecting the new pump station to the existing force main. We are aware of the new forms but this one was already in process when we were made aware of the new forms. We are basically replacing an obsolete pump station with a new one with similar firm capacity (maybe increasing capacity 50 gpm or so,based on pump run history before the pumps were worn out), and adding standby power. i Thanks, Randy McNeill Davis • Martin • Powell p.336.886.4821x283 • m.336.803.0119 Stability... Value... Experience... let our experience make yours better/ From: Mickey, Mike [mailto:mike.mickey@ncdenr.gov] Sent: Tuesday, June 07, 2016 4:32 PM To: rmcneill@dmp-inc.com Subject:Bethel Drive PS Replacement Randy—The above sewer extension application was received today. One question. Item B.(11) of the application shows 1,720 If of 10-inch force main. Is that new or existing? FYI - Please use the new application (FTA 4-16)for future projects. No problem with this one since the signatures were from April and May. Thanks, Mike. ---------------------------------- M i ke.M i c key @ N CD E N R.gov NC DEQ Winston-Salem Regional Office Division of Water Resources-Water Quality Programs 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 Phone: (336) 776-9697 i E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties.