Loading...
HomeMy WebLinkAbout20180784 Ver 1_Notice of Final Mitigation Plan_20190703Strickland, Bev From: Browning, Kimberly D CIV USARMY CESAW (US) <Kimberly.D.Browning@usace.army.mil> Sent: Wednesday, July 03, 2019 1:40 PM To: Tugwell, Todd J CIV USARMY CESAW (US); Haupt, Mac; Wilson, Travis W.; Garrison, Gabriela; kathryn_matthews@fws.gov; Bowers, Todd; Higgins, Karen; Davis, Erin B; Twyla Cheatwood; McLendon, C S CIV USARMY CESAW (US); Wicker, Henry M Jr CIV USARMY CESAW (US); Beecher, Gary H CIV USARMY CESAW (USA); Williams, Andrew E CIV USARMY CESAD (USA); Mickey Sugg; Chapman, Amy; Baumgartner, Tim Cc: Crocker, Lindsay; Schaffer, Jeff, Raymond Holtz Subject: [External] Notice of Final Mitigation Plan: NCDMS Arabia Bay Site/Hoke County/SAW-2018-01151 (UNCLASSIFIED) Follow Up Flag: Follow up Flag Status: Completed CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov> CLASSIFICATION: UNCLASSIFIED The final Mitigation Plan for NCDMS Arabia Bay was finalized this week. Per the requirements in the eApproval letter from the IRT, the final document was posted to the NCDMS project page, along with the summarized errata sheet with responses to comments. It is available here: https://deq.nc.gov/about/divisions/mitigation-services/dms-projects DMS/RS will not submit a PCN Application since there are currently no jurisdictional features, but ensure construction activities will occur 30 days after this email notice, and that any other required permits are in place as necessary. Regards, Kim Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1 919.554.4884 x60 BUILDING STRONG (r) -----Original Message ----- From: Browning, Kimberly D CIV USARMY CESAW (US) Sent: Tuesday, April 30, 2019 3:19 PM To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Haupt, Mac <mac.haupt@ncdenr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; gabriela.garrison@ncwildlife.org; kathryn_matthews@fws.gov; Bowers, Todd <bowers.todd@epa.gov>; karen.higgins@ncdenr.gov; Davis, Erin B <erin.davis@ncdenr.gov>; Twyla Cheatwood <twyla.cheatwood@noaa.gov>; McLendon, C S CIV USARMY CESAW (US) <Scott.C.McLendon@usace.army.mil>; Wicker, Henry M Jr CIV USARMY CESAW (US) <Henry.M.Wicker.JR@usace.army.mil>; Beecher, Gary H CIV USARMY CESAW (US)<Gary.H.Beecher@usace.army.mil>; Williams, Andrew E CIV USARMY CESAW (USA) <Andrew.E.Williams2@usace.army.mil>; Sugg, Mickey T CIV USARMY CESAW (USA) <Mickey.T.Sugg@usace.army.mil>; amy.chapman@ncdenr.gov; Baumgartner, Tim <tim.baumgartner@ncdenr.gov> Cc: Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov>; Schaffer, Jeff <jeff.schaffer@ncdenr.gov>; Raymond Holtz <rholz@ restorationsystems.com> Subject: eApproval for NCDMS Arabia Bay Site/Hoke County/SAW-2018-01151 (UNCLASSIFIED) CLASSIFICATION: UNCLASSIFIED Mr. Baumgartner, Attached is the Arabia Bay Draft Mitigation Plan approval letter and copies of all comments generated during the project review. Please note that this letter approves the Draft Mitigation Plan provided that the Final Mitigation Plan adequately addresses all comments on the attached memo. Please provide a copy of the Final Mitigation Plan when you submit the Pre -Construction Notice for the NWP 27. If no permit is required to construct the project, please submit a copy of the Final Mitigation Plan to our office at least 30 days prior to beginning construction. Also, please ensure that a copy of the Final Mitigation Plan is posted to the NCDMS project documents so that all members of the IRT have access to the Final plan. Please let me know if you have any questions about the process or the attached letter. Very Respectfully, Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1 919.554.4884 x60 BUILDING STRONG (r) CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED