PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 9/16/2018
1. Structure Name/Identifier (ID): I Jimmy Williams #2 1 FN: 31-207
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according,,to marker 17.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 2.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 41416 ft2
e, line c/12 x line d x 7.48 gallons/ft3 51632 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
f
g. volume of waste produced. according to structural design 474741 ft3
h. current herd # 1470 certified herd #1 1470
actual waste produced = current herd # x line g = 47474 ft'
certified herd #
i. volume of wash water according to structural design 0 fo
j. excess rainfall over evaporation according to design 25783 ft3
k. (lines h + i +j) x 7.48 x 30 days/line f= 91327 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/27/2011 8811 Ibs/1000 gal.
m. ((lines e + k)/1000) x line I = 122.9 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) Jimmy Williams (31-207) 30DayPoA (9-16-2018) 9/21/2018
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: Jimmy Williams #2
line m = 122.9 lb PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n.lines 1+2+3+4+5+6= 122.9lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOn n0 NOT I _IST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
6442
1 2-1
Small Grain
1.73
50.00
86.5
Oct - Mar
6442
1 2-2
Small Grain
2.45
50.00
122.5
Oct - Mar
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 209.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 122.9 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 209.0 lb. PAN
y. Overall PAN balance (w - x) = -86 lb. PAN
PoA (30 Day) Jimmy Williams (31-207) 30DayPoA (9-16-2018) 9/21/2018
:-t
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility. I--
NARRATIVE:
R
PoA (30 Day) Jimmy VVilliams-(31-207) 30Day,PoA (9-16-2018) 9/21/2018