Loading...
HomeMy WebLinkAbout310354_Plan of Action_20180921�0 !�6 2-o / _ s PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 9/16/2018 1. Structure Name/Identifier (ID): Z. Korne a -Paradise #1 31-354) 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 5.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 14.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 62400 ft2 e. line c/12 x line d x 7.48 gallons/ft3 544544 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design - 80705 ft3 h. current herd # 2448 certified herd #1 2448 actual waste produced = current herd # x line g = 80705 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/31/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 0 ft3 39666.7 ft3 150063 gallons 1.83 Ibs/1000 gal. 1271.1 Ibs. PAN 6 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 9/16/2018 1. Structure Name/Identifier (ID): I Z. Korne a -Cam Branch #2(31-354) 2. 'Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker I 5.0 inches b. designed 25 yr./24 hr. storm & structural freeboard I 19.0 inches c. line b - line a (inches in red zone) = 14.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 1 65504 Ift2 e. line c/12 x line d x 7.48 gallons/ft3 571632 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design I 180 days g. volume of waste produced according to structural design 1 807051 ft3 h. current herd # F---2-44-8-1 certified herd #1 2448 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/31/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 80705 ft' Oft3 40121.7 ft3 150631 gallons 1.44 Ibs/1000 gal. 1040.1 lbs. PAN 4, II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Z. Kornegay-Paradise #1(31-354) line m = 1271.1 lb PAN 2. Structure ID: Z. Kornegay-Camp Branch #2(31-354) line m = 1040.1 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6= 2311.2 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. 2 PAN balance .. BALANCE FOR columnrxs Is- ���• 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 2535.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 2311.2 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 2535.0 lb. PAN y. Overall PAN balance (w - x) _ -224 lb. PAN PoA (30 Day) 2/21/00 1k V Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Waste will be applied agronomically and hydraulically as weather permits. PoA (30 Day) 2/21/00