Loading...
HomeMy WebLinkAbout670047_Plan of Action_20180925a-0106267 47 " PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES G 7 ` 7 7 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 9/16/2018 1. Structure Name/Identifier (ID): Barry Sheppard 67-47 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 2.0 inches b. designed 25 yr./24 hr. storm & structural freeboard I 19.5 inches c. line b - line a (inches in red zone) _ 17.5 inches d. top of dike surface area according to design 167056 Jft2 e. line c/12 x line d x 7.48 gallons/ft3 1822303 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 210994 ft3 h. current herd # 7-6-40-0-1 certified herd #1 6400 actual waste produced = current herd # x line g = 210994 ft3 certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 100333 ft3 k. (lines h + i +j) x 7.48 x 30. days/line f= 388121 gallons 4. Total PAN to be land applied during draw down period ` I. current waste analysis dated 7/2/2018 1.09 Ibs/1000 gal. m. ((lines e + k)/1000) x line 1= 2409.4 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Structure 1 Barry Sheppard (PoA30day) 9-16-2018 Page 1 of 1 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Barry Sheppard (67-47) line m = 2409.4 ib PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = n. = 1 +2 +3+4+5+6 2409A Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 3n DAY PERIOD- o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 1097 1 Bermuda Pasture 8.20 75.00 615.0 3/1 - 9/30 1097 2 Bermuda Pasture 5.301 75.00 397.5 3/1 - 9/30 1097 3 Bermuda Pasture 2.50 75.00 187.5 3/1 - 9130 1097 - , 4a Bermuda Pasture 9.60 75.00 720.0 3/1 - 9/30 1097 4b Fescue Pasture 5.50 100.00 550.0 7/1 - 8/30 1097 5 Fescue Pasture 12.30 100.00 1230.0 7/1 - 8/30 1097 6 Bermuda Pasture 12.30 75.00 922.5 3/1 - 9/30 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 4622.5 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 2409.4 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 4622.5 lb. PAN y. Overall PAN balance (w - x) _ -2213 lb. PAN SUMMARY Barry Sheppard (PoA30day) 9-16-2018 Page 1 of 2 1* Line y must show as a -deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included, as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. SUMMARY Barry Sheppard (PoA30day) 9-16-2018 Page 2 of 2