Loading...
HomeMy WebLinkAbout710041_Plan of Action_201809211-z 1--1 PL0 [b 0 j Gq j 71- qj PLAN OF AC.TION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: ;AWS710041 County: Facility Name: 2601-1 Pender Certified Operator Name: Julia Tatum Operator Number: 22989 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 26011 _ Spillway(Y or N): N Level(inches): 6. 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information' listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Murphy -Brown, LLC/David !Nordin Phone: (910) 293-3434 Facility Owner/Manager (print) L_-\ \ �1. !� V,,o r� 5 Date: 9/16/2018 Facility Owner/Manager (signature) ,If TOTAL. POUNDS OFPAft°ST.ORED,.MITHINST-RUC7URAL,.F-REEBOAFW,,tANDIOR,2SYR"JZ4i !NFU4TORM S1090EL 4�,W* t $T100TUOFAR YAboL " I 4 %r_UdWfd ID; 2601-1 2114.3,)h PAN 2. Skudure fb: 0, PAN 3, Ib,,PAN 90U�JtJfOJET� 4. qtru*L!!:P, 10, - lhfoql= 5, SWOLine I D- l�PAN n. lines [¢,.PAO', Ill., TOTAL PAN WALWqP-,REMAINING' FOR,.,-A)(AlLAME'OROP9"DURING ,36.'OAY,bFkA-W.'O-OWN OER166. :S.tate &U(rdntdt6O eiding ­pIic—at ion date on6ktOb- ,p p1icaon-156LO1hniftdate f&dvbi abI 6. receiving crootd6fift 8d'day, 'drpw--,d'" 6W n,period: 'ire Total PAN available for all f(dldg (sum bf bbijifibil,tVil 3626.4 lb. PAN 'IV-.,FFAtlLITY'8 PoA-O.V_EkALL.PAN-BXLA9Ct WTotill PAN 2TU.3 lb. PAN P o A 0,, 0, a�),- 2 /,'2' 1 - /',O_ 0- x. Crop's remaining PAN balance (line v from section III) = 3626.4 lb. PAN y. Overall PAN balance (w - x) _ -1512 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information_ If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NAKKA I IVt: Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if,needed. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2601-1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 6.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 13.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 206025 ftz e. line c/.12 x line d x 7.48 gallons/W 1669489 gallons 3. Projected volume of waste liquid produced during, draw down period f, temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 253780 W h. current herd # 2400 certified herd # 2400 actual waste produced = current herd # x line g = certified herd # - i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/24/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 253780 fts 01fta 120181 ft3 466205 gallons 0.99 Ibs/1000 gal. 2114.3 lbs. PAN