HomeMy WebLinkAbout710041_Plan of Action_201809211-z 1--1
PL0 [b 0 j Gq j
71- qj
PLAN OF AC.TION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: ;AWS710041 County:
Facility Name: 2601-1
Pender
Certified Operator Name: Julia Tatum Operator Number: 22989
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: 26011 _
Spillway(Y or N): N
Level(inches): 6.
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: as conditions permit
I hereby certify that I have reviewed the information' listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Murphy -Brown, LLC/David !Nordin Phone: (910) 293-3434
Facility Owner/Manager (print)
L_-\ \ �1. !� V,,o r� 5 Date: 9/16/2018
Facility Owner/Manager (signature)
,If TOTAL. POUNDS OFPAft°ST.ORED,.MITHINST-RUC7URAL,.F-REEBOAFW,,tANDIOR,2SYR"JZ4i
!NFU4TORM S1090EL 4�,W* t $T100TUOFAR YAboL " I 4
%r_UdWfd ID; 2601-1 2114.3,)h PAN
2. Skudure fb:
0, PAN
3, Ib,,PAN
90U�JtJfOJET�
4. qtru*L!!:P, 10, - lhfoql= 5, SWOLine I D- l�PAN
n. lines [¢,.PAO',
Ill., TOTAL PAN WALWqP-,REMAINING' FOR,.,-A)(AlLAME'OROP9"DURING ,36.'OAY,bFkA-W.'O-OWN
OER166.
:S.tate &U(rdntdt6O eiding pIic—at ion date on6ktOb- ,p p1icaon-156LO1hniftdate f&dvbi abI 6.
receiving crootd6fift 8d'day, 'drpw--,d'" 6W n,period:
'ire Total PAN available for all f(dldg (sum bf bbijifibil,tVil 3626.4 lb. PAN
'IV-.,FFAtlLITY'8 PoA-O.V_EkALL.PAN-BXLA9Ct
WTotill PAN 2TU.3 lb. PAN
P o A 0,, 0, a�),- 2 /,'2' 1 - /',O_ 0-
x. Crop's remaining PAN balance (line v from section III) = 3626.4 lb. PAN
y. Overall PAN balance (w - x) _ -1512 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information_ If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NAKKA I IVt:
Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is
available for pumping if,needed.
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 2601-1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 6.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 13.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 206025 ftz
e. line c/.12 x line d x 7.48 gallons/W 1669489 gallons
3. Projected volume of waste liquid produced during, draw down period
f, temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 253780 W
h. current herd # 2400 certified herd # 2400
actual waste produced = current herd # x line g =
certified herd # -
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 8/24/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
253780 fts
01fta
120181 ft3
466205 gallons
0.99 Ibs/1000 gal.
2114.3 lbs. PAN