HomeMy WebLinkAbout310324_Plan of Action_20180921q-z1-19 d 1 3J.3 Z1� PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 9/16/2018 1. Structure Name/Identifier (ID): Lewis Smith Farm I FN: 31-324 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 11.0 inches b. designed 25 yr./24 hr. storm & structural freeboard . 19.0 inches c. line b - line a (inches in red zone) = 8.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 49715 ft2 e. line c/12 x line d x 7.48 gallons/ft3 247912 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 81959 ft3 h. current herd # 1 24801 certified herd #1 2480 actual waste produced = current herd # x line g = 81959 ft3 certified herd # i. volume of wash water according to structural design 0 ft3 j. excess rainfall over evaporation according to design 35000 ft3 k.. (lines h + i + j) x 7.48 x 30 days/line f= 145809 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/30/2018 1.33 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 523.6 Ibs. PAN i REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 9/21 /2018 Izu II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lewis Smith Farm line m = 523.6 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines1+2+3+4+5+6= 523.6lbPAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN" PFRInn nn NnT I IST FIFI nR TO WHICH PAN CANNnT RF APPLIED DURING THIS 30 DAY PERIOD_ o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window 2324 9 Small Grain Overseed 2.08 50.00 104.0 10/1-3/31 23241 10&11 Small Grain Overseed 3.51 50.00 175.5 10/1-3/31 2324 12 Small Grain Overseed 5.25 50.00 262.5 10/1-3/31 r 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 542.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 523.6 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 542.0 lb. PAN y. Overall PAN balance (w - x) _ -18 lb. PAN PoA (30 Day) 2/21/00 9/21/2018 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. PoA (30 Day) 2/21/00 9/21/2018