Loading...
HomeMy WebLinkAbout310334_Plan of Action_20180921- •w ` PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-334 County: Dupl i n Facility Name: Brent & Evelyn Davis • Farm Certified Operator Name: T. Brent Davis Operator #: 16513 lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Lagoon Name (ID): 1 Spillway (Yes or No): No Level (inches): 1811 2. Check all applicable items Structure 2 Structure 3 Structure 4 N 14" Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 9/18/2018 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Thomas Brent Davis Phone: 252-568-3343 Facility Owner/Manager (print) Facility Owner/Manager (signature) Cover Page Brent Davis (31-334) PoA30day (9-16-18) Date: 9/16/2018 Page 1 of 1 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD i I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Brent Davis #1 31-334 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 18.0 inches 19.0 inches 1.0 inches 50,478 ft2 31,465 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 6,007 ft3 h. current herd # F-8-0-0---1 certified herd #1 1.900 actual waste produced = current herd # x line g = 2,529 ft' certified herd # i. volume of wash water according to structural design 0 ft3 j. excess rainfall over evaporation according to design 8,677 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 13,970 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/6/2018 1.26 Ibs/1000 gal. m. ((lines e + k)/1000) x line 1 = 57.2 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Structure 1 Brent Davis (31-334) PoA30day (9-16-18) Page 1 of 1 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID)-. Brent Davis #2 31-334 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 13.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 6.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 69,012 ft2 e. line c/12 x line d x 7.48 gallons/ft3 258,105 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 80,706 ft3 h. current herd # 2,200 certified herd actual waste produced = current herd # x line g = 72,529 ft' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/6/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 ft3 42,157 ft' 142,976 gallons 1.62 Ibs/1000 gal. 649.8 Ibs. PAN Structure 2 Brent Davis (31-334) PoA30day (9-16-18) Page 1 of 1 r _ II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Brent Davis #1 (31-334) line m = 57.2 lb PAN 2. Structure ID: Brent Davis #2 (31-334) line m = 649.8 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6= 707.0 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PGRIf1n nn Nr)T I IRT PIPI nS TO WHICH PAN CANNnT RE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window 1 Small Grain Overseed 3.10 50.00 155.0 10/1 - 3/31 10 Small Grain Overseed 2.82 50.00 141.0 10/1 - 3/31 11 Small Grain Overseed 6.51 50.00 325.5 10/1 - 3/31 12 Small Grain Overseed 4.81 50.00 240.5 10/1 - 3/31 2 Small Grain Overseed 2.42 50.00 121.0 10/1 - 3/31 3 Small Grain Overseed 3.10 50.00 155.0 10/1 - 3/31 4 Small Grain Overseed 1.40 50.00 70.0 10/1 - 3/31 5 Small Grain Overseed 1.79 50.00 89.5 10/1 - 3/31 6 Small Grain Overseed 3.10 50.00 155.0 10/1 - 3/31 7 Small Grain Overseed 3.58 50.00 179.0 10/1 - 3/31 8 Small Grain Overseed 4.65 50.00 232.5 10/1 - 3/31 9 Small Grain Overseed 4.90 96.00 470.4 10/1 - 3/31 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 2334.4 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 707.0 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 2334.4 lb. PAN y. Overall PAN balance (w - x) = -1627 lb. PAN Summary Brent Davis (31-334) PoA30day (9-16-18) Page 1'of 2 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRA IIVL: Waste will be applied as soon as weather permits. Summary Brent Davis (31-334) PoA30day (9-16-18) Page 2 of 2