HomeMy WebLinkAbout310133_Plan of Action_20180921P-GI�021 y-o f-Z l -f ?-7 31-133 41 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 9/16/2018 1. Structure Name/Identifier (ID): IG. Kennedy 1(31-133) 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker I 10.0 inches b. designed 25 yr./24 hr. storm & structural freeboard I 19.0 inches c. line b - line a (inches in red zone) = 9.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) . 70150 ftZ e. line c/12 x line d x 7.48 gallons/ft3 393542 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 1 80705 Jft3 h. current herd # 1224 certified herd # 2448 actual waste produced = current herd # x line g = 40353 ft' certified herd # i. volume of wash water according to structural design 0 ft3 j. excess rainfall over evaporation according to design 35000 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 93939 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/7/2018 0.96 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 468.0 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) P PoA (30 Day) 9/21/2018 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: G. Kennedy 1(31-133) line m = 468.0 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n: lines 1 +2+3+4+5+6= 468.0 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PFRInn nn NnT I ICT FIFi nS TO WHICH PAN CANNOT RF APPI IFD DURING THIS 3n DAY PFRIOD_ ME 2 PAN .. (lb/acre). . - . 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 636.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 468.0 lb. PAN x. Crop's remaining PAN balance (line v from section 111) = 636.0 lb. PAN y. Overall PAN balance (w - x) = -168 lb. PAN PoA (30 Day) 9/21/2018 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. . PoA (30 Day) 9/21/2018