Loading...
HomeMy WebLinkAbout310234_Plan of Action_20180921PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number. 31-234 Facility Name: Brock Family Farms Certified operator Flame: Roy A. Brock County: Duplin Operator Number: 17173 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5. Lagoon Name/ID: 1 Spillway(Y or N): N Level(inches): 6 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility`s CAWMP. Operation will be partially or fully depopulated. 'Attach a complete schedule with corresponding animal units and dates fro depopulation *0 animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 9/22/18 Weather permitting. I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Roy A. Brock Phone: 919-738-9360 Facility Owner/Manager ( rint) x-4— Ile. Ai�ee Date: 9/21/2018 Facility Owner/Manager (signature) PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Brock Family Farms 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 6.0 inches b. designed 25 yr./24 hr. storm & structural freeboard - 7 -9-0-1 inches c. line b - line a (inches in red zone) = 13.0 inches top of dike surface area according to design d. (area at below structural freeboard elevation) 148104 ftZ 0. line c/12 x line d x 7.48 gallonse 1200136 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 1-801 days g. volume of waste produced according to structural design 191873 ft3 h. current herd # 5820 certified herd # 5820 actual waste produced = current herd # x line g = 191873 ft3 certified herd # i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design 86394 ft3 r k. (lines h + i + j) x 7.48 x 30 days/line f= 346906 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/9/2018 F 1.09 Ibs/1000 gal. m. ((lines e + k)/1000) x line 1= 1.686.3 lbs. PAN REPEAT SECTION 1 FOR'EACH WASTE STRUCTURE ON SITE. (Cluck on the next Structure tab shown below) • z II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 1 line m = 1686.3 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 + 2,+ 3 + 4 + 5 + 6 = 1686.3 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS an DAY PFRinn o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) L TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 2452 2A Bermuda 5.88 174.00 1023.1 Mar -Sept 2452 26 Bermuda 4.93 170.00 838.1 Mar -Sept 2452 2C Bermuda 2.02 156.00 315.1 Mar -Sept 2452 2D Bermuda 1.72 142.00 244.2 Mar -Set . 2452 1A Bermuda 3.21 186.00 597.1 Mar -Se 2452 2E Bermuda 1.98 193.00 382.1 Mar -Sept 2452 2F Bermuda 1.51 198.00 299.0 Mar -Sept r v. i offal P mm available Tor au news (SUM OT column T) _ dfj9 i.t3 ID. PAN IV. FACILITY'S POA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = 1686.3 lb. PAN x. Crop's remaining PAN balance (line v from section III) _ 3698.8 lb. PAN ,y. Overall PAN balance (w - x) =-2012.5 Ib. PAN ,- NARRATIVE: Called in to DWQ on 9/17/18.