HomeMy WebLinkAbout310234_Plan of Action_20180921PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number. 31-234
Facility Name: Brock Family Farms
Certified operator Flame: Roy A. Brock
County: Duplin
Operator Number: 17173
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5.
Lagoon Name/ID: 1
Spillway(Y or N): N
Level(inches): 6
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility`s CAWMP.
Operation will be partially or fully depopulated.
'Attach a complete schedule with corresponding animal units and dates fro depopulation
*0 animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 9/22/18 Weather permitting.
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Roy A. Brock Phone: 919-738-9360
Facility Owner/Manager ( rint)
x-4— Ile. Ai�ee Date: 9/21/2018
Facility Owner/Manager (signature)
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Brock Family Farms
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 6.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard - 7 -9-0-1 inches
c. line b - line a (inches in red zone) = 13.0 inches
top of dike surface area according to design
d. (area at below structural freeboard elevation) 148104 ftZ
0. line c/12 x line d x 7.48 gallonse 1200136 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 1-801 days
g. volume of waste produced according to structural design 191873 ft3
h. current herd # 5820 certified herd # 5820
actual waste produced = current herd # x line g = 191873 ft3
certified herd #
i. volume of wash water according to structural design ft3
j. excess rainfall over evaporation according to design 86394 ft3
r
k. (lines h + i + j) x 7.48 x 30 days/line f= 346906 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/9/2018 F 1.09 Ibs/1000 gal.
m. ((lines e + k)/1000) x line 1= 1.686.3 lbs. PAN
REPEAT SECTION 1 FOR'EACH WASTE STRUCTURE ON SITE.
(Cluck on the next Structure tab shown below)
•
z II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: 1
line m = 1686.3 lb PAN
2. Structure ID:
line m =
lb PAN
3. Structure ID:
line m =
lb PAN
4. Structure ID:
line m =
lb PAN
5. Structure ID:
line m =
lb PAN
6. Structure ID:
line m =
lb PAN
n. lines 1 + 2,+ 3 + 4 + 5 + 6 = 1686.3 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS an DAY PFRinn
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
L TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window'
2452
2A
Bermuda
5.88
174.00
1023.1
Mar -Sept
2452
26
Bermuda
4.93
170.00
838.1
Mar -Sept
2452
2C
Bermuda
2.02
156.00
315.1
Mar -Sept
2452
2D
Bermuda
1.72
142.00
244.2
Mar -Set .
2452
1A
Bermuda
3.21
186.00
597.1
Mar -Se
2452
2E
Bermuda
1.98
193.00
382.1
Mar -Sept
2452
2F
Bermuda
1.51
198.00
299.0
Mar -Sept
r
v. i offal P mm available Tor au news (SUM OT column T) _ dfj9 i.t3 ID. PAN
IV. FACILITY'S POA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section 11) = 1686.3 lb. PAN
x. Crop's remaining PAN balance (line v from section III) _ 3698.8 lb. PAN
,y. Overall PAN balance (w - x) =-2012.5 Ib. PAN
,-
NARRATIVE:
Called in to DWQ on 9/17/18.