HomeMy WebLinkAbout310711_Plan of Action_20180927PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 31-711
4
Facility Name:- Sutton III Nursery
Certified Operator Name:
Chuck Sutton
County: Duplin
Operator Number:
AWA 996433
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon Lagoon 5
1
N
9
2. Check all applicable items
J
X Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates for depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
9/22/18
1 hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Chuck Sutton
Phone:
Facility Owner/Manager (print)
fT YYIU l'1G�%�CX=/KiY (3Vl Y� lGU f Date:
Facility Owner/Manager (signature)
aL
9119/18
0
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Lagoon 91
2. Current liquid volume in 25 y024 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
9.0 inches
19.01 inches
10.0 inches
20016 ft
124766 gallons
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 19094 ft3
h. current herd # 3100 certified herd # 2600
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i +j) x 7.48 x 30. days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated • 1 5/25/18
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
22766 ft3
ft3
12687.5 ft3
44199 gallons
3.15 Ibs/1000 gal.
532.2 Ibs. PAN
9
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Lagoon #1
line m =
532.2 lb PAN
2. Structure ID:
line m =
lb PAN
3. Structure ID:
line m =
lb PAN
4. Structure ID:
line m =
lb PAN
5. Structure ID:
line m =
Ib,PAN
6� Structure ID:
line m =
lb PAN
n.linesl+2+3+4+5+6= 532.2lbPAN
III: TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
rtKIUU. uU Nu I LIST FItLUS TO VVNICN PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract # p. field # q. crop r. acres s. remaining IRR-2 t. TOTAL PAN u. application window'
PAN balance BALANCE FOR
(lb/acre) FIELD (lbs.)
column r x s
1A wheat 5.40 125.40 677.2 Sep —March
1 B wheat 1.65 125.401 206.9 Se March
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
1
v. Total PAN available for all fields (sum of column t) = 884.1 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 532.2 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 884.1 lb. PAN
y. Overall PAN balance (w - x) _ -352 lb. PAN
- f
Line y must show as a deficit. If line y does not show as a deficit, list course of action here Including pump and haul,
depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new
information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance
PoA (30 Day) 2/21/00
table'and recalculate the overall PAN balance. If'animal waste is to, e_hauled to another permitted facility, provide'
information regarding the herd populatiori and lagoon freeboard levels at the=receiving facility.
Irrigation onto existing spray fields will -continue as'weather--and field conditions -permit,
m rc,�ct,-i, -{ p,. ►nnviriYc2,:,. of
N
PoA (30 Day) 2/21/.00