HomeMy WebLinkAbout310127_Plan of Action_20180927N-748 3l-lZ7 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-127 County: Duplin Facility Name: Ann English Farm Certified Operator Name: Jeff English Operator Number: AWA 18043 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the, top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 N- 7 2. Check all applicable items X Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan, of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. 'Attach a complete schedule with corresponding animal units and dates for depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 9/20/18 hereby'certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Jeff English Phone: //�� ,, ��%Facility Owner/Manager (print) -_ e- /� ftla,&Llla ff1� �lti I�la-t Date: 9/25/18 Facility Owner/Manager (signature) If. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon #1 line m = 1849.4 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6= 1849.4 lb PAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PFRIOn r10 NOT I IRT FIFI nS TO WHICH PAN CANNOT RF APPI IFn DARING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u, application window' pull 14 bermuda 3.58 102.48 366.9 Apr -Oct pull 15 bermuda 1.74 107.13 186.5Apr-Oct pull 1 sm gr 1.56 50.00 78.0 Sept -Apr pull 2 sm gr 1.55 50.00 77.3 Sept -Apr pull 3 sm gr 1.24 50.00 62.1 Sept -Apr pull sm gr 1.82 50.00 91.0 Sept -Apr pull 5 sm gr 1.97 50.00 98.5 Sept -Apr pull 6 sm gr 1.711 50.00 85.5 Sept -Apr pull sm gr 2.01 50.00 100.5 Sept -Apr pull 8 sm gr 2.32 50.00 116.0 Sept -Apr pull 10 sm gr 1.97 50.00 98.5 Sept -Apr pull 11 sm gr 1.67 50.00 83.5 Sept -Apr pull 12 sm gr 2.35 50.00 117.4 Sept -Apr pull 13 sm gr 3.07 50.00 153.5 Sept -Apr pull 14 sm gr 3.58 50.00 179.0 Sept -Apr 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1894.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) 1849.4 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 1894.0 lb, PAN y. Overall PAN balance (w - x) = -45 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance PoA (30 Day) 2/21/00 (table and recalculate the overall PAN balance. It animal waste is to be hauled to another permitted tacility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARKA f Vt: Irrigation onto existing spray fields will continue as weather and field conditions permit.. Mr. English reduced levels to 14 inches (out of structural freeboard) on 9/24/18 notified inspector on 9/24/18. Prior to Hurricane Florence, Mr. English's lagoon was in compliance. On 9/12/18 (the rain started in the evening of 9112/18), the lagoon level was at 34 inches (the -required level is 19.5 Inches). Mr. English recorded 27 inches of rain from this tropical system and recorded two consecutive 25-year, 24-hour storms on 9/15118 and 9/16/18. Mr. English plans to meet the minimum requirement of the level prior to 30 day requirement. Mr. English will notify inspector when the structure meets minimum requirement of 19.5 inches. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30`DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Fagoon #1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr.124 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/fO 3. Projected volume of waste liquid produced during draw down period 7.0 inches 19.51 inches 12.5 inches 89775 fe 699497 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 737980 fe h. current herd # 3626 certified herd #1 3672 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. 'excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 7/13/18 m. ((lines e + k)/1000) x line I = REPEAT SECTION i FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 728735 fIa I 0] fe 58800 ff 981794 gallons 1.10 Ibs/1000 gal. 1849.4 -Ibs. PAN