1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the, top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
1
N-
7
2. Check all applicable items
X Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan, of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
'Attach a complete schedule with corresponding animal units and dates for depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
9/20/18
hereby'certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Jeff English Phone:
//�� ,, ��%Facility Owner/Manager (print) -_ e- /�
ftla,&Llla ff1� �lti I�la-t Date: 9/25/18
Facility Owner/Manager (signature)
If. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Lagoon #1
line m =
1849.4 lb PAN
2. Structure ID:
line m =
lb PAN
3. Structure ID:
line m =
lb PAN
4. Structure ID:
line m =
lb PAN
5. Structure ID:
line m =
lb PAN
6. Structure ID:
line m =
lb PAN
n. lines 1 +2+3+4+5+6= 1849.4 lb PAN
Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PFRIOn r10 NOT I IRT FIFI nS TO WHICH PAN CANNOT RF APPI IFn DARING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR-2
PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u, application window'
pull 14
bermuda
3.58
102.48
366.9
Apr -Oct
pull 15
bermuda
1.74
107.13
186.5Apr-Oct
pull 1
sm gr
1.56
50.00
78.0
Sept -Apr
pull 2
sm gr
1.55
50.00
77.3
Sept -Apr
pull 3
sm gr
1.24
50.00
62.1
Sept -Apr
pull
sm gr
1.82
50.00
91.0
Sept -Apr
pull 5
sm gr
1.97
50.00
98.5
Sept -Apr
pull 6
sm gr
1.711
50.00
85.5
Sept -Apr
pull
sm gr
2.01
50.00
100.5
Sept -Apr
pull 8
sm gr
2.32
50.00
116.0
Sept -Apr
pull 10
sm gr
1.97
50.00
98.5
Sept -Apr
pull 11
sm gr
1.67
50.00
83.5
Sept -Apr
pull 12
sm gr
2.35
50.00
117.4
Sept -Apr
pull 13
sm gr
3.07
50.00
153.5
Sept -Apr
pull 14
sm gr
3.58
50.00
179.0
Sept -Apr
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 1894.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section 11) 1849.4 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 1894.0 lb, PAN
y. Overall PAN balance (w - x) = -45 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul,
depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new
information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance
PoA (30 Day) 2/21/00
(table and recalculate the overall PAN balance. It animal waste is to be hauled to another permitted tacility, provide
information regarding the herd population and lagoon freeboard levels at the receiving facility.
NARKA f Vt:
Irrigation onto existing spray fields will continue as weather and field conditions permit..
Mr. English reduced levels to 14 inches (out of structural freeboard) on 9/24/18 notified inspector on 9/24/18. Prior to
Hurricane Florence, Mr. English's lagoon was in compliance. On 9/12/18 (the rain started in the evening of 9112/18), the
lagoon level was at 34 inches (the -required level is 19.5 Inches). Mr. English recorded 27 inches of rain from this tropical
system and recorded two consecutive 25-year, 24-hour storms on 9/15118 and 9/16/18. Mr. English plans to meet the
minimum requirement of the level prior to 30 day requirement. Mr. English will notify inspector when the structure meets
minimum requirement of 19.5 inches.
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30`DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Fagoon #1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr.124 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/fO
3. Projected volume of waste liquid produced during draw down period
7.0 inches
19.51 inches
12.5 inches
89775 fe
699497 gallons
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 737980 fe
h. current herd # 3626 certified herd #1 3672
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. 'excess rainfall over evaporation according to design
k. (lines h + i +j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 7/13/18
m. ((lines e + k)/1000) x line I =
REPEAT SECTION i FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
728735 fIa
I 0] fe
58800 ff
981794 gallons
1.10 Ibs/1000 gal.
1849.4 -Ibs. PAN