HomeMy WebLinkAbout310372_Plan of Action_20180926PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: saW 3 %o2 County: Duplin
i
Facility Name: King & Sons Farm LLC
Certified Operator Name: J. Renee King Operator Number: AWA 989430
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
1
N
17
2. Check all applicable items
31--37�L
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
`Attach a complete schedule with corresponding animal units and dates for depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
9/19/18
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
J. Renee King, Preston King Phone:
^I Facility'O(wwne�r/Manager (print) A
; J�Y�Gt i�( �Gt ' z¢XU► �'t" � �L1t'1kC Date:
Facility Owner/Manager (signature)
9/26/18
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
La oon 1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker - 17.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.51 inches
c. line b - line a (inches in red zone) = - 2.5 inches
d. top of dike surface area according to design
. (area at below structural freeboard elevation) 70224 f?
e. line c/12 x line d x 7.48 gallons/fO 109432 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 80705 f?
h. current herd # 2339 certified herd #E 2448
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/13/18
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21 /00
77112 fO
44800 f?
151983 gallons
1.68 Ibs/1000 gal.
439.2 Ibs: PAN .
r
r
11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Lagoon 1
line m =
439.2 lb PAN
2. Structure ID:
line m =
lb PAN
3. Structure ID:
line m =
lb PAN
4. Structure ID: •
line m =
lb PAN
5. Structure ID:
line m =
Ib PAN
6. Structure ID:
line m =
lb PAN
n. lines 1 +2+3+4+5+6= 439.2 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERInn_ nn KIM LIST FIFI nS Tn WHICH PAN CANNOT RF APPI IFn n11RINn THIS 30 DAY PERIOn_
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR-2
PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
1-3
bermuda
1.70
99.64
169.4
Mar -Sept
2-4
bermuda
1.40
128.48
179.9
Mar -Sept
2-5
bermuda
1.40
125.05
175.1
Mar -Sept
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 524.3 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 439.2 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 524.3 lb. PAN
y. Overall PAN balance (w - x) = -85 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul,
depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new
information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance
PoA (30 Day) 2/21/00
table and recalculate the overall PAN balance. It animal waste is to be hauled to another permitted facility, provide
information regarding the herd population and lagoon freeboard levels at the receiving facility.
Irrigation onto existing spray fields will continue as weather and field conditions permit.
Prior to Hurricane Florence, Mr. King's lagoon was in compliance, with approximately 40" freeboard. Mr.King was able to
be well into compliance despite abundant and frequent rainfall in previous months. Mr. King recorded 18 inches of rain
from this tropical system over five days time. Mr. King's consultant notified the inspector on 9/17/18 at 17" freeboard, with
23" freeboard on 9/23/18. '
PoA (30 Day) 2/21100