HomeMy WebLinkAbout100032_Plan of Action_20180927col b ��7 Z to -3?,
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
- Facility Number: 10 32 County: Brunswick
Facility Name: Biroadwater Farms
Certified Operator Name: Chuck Clemmons Operator Number:
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
F T P
N N N
15 10 4
2. Check all applicable items
XXX Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
XXX Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
-30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units, and dates for depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
I hereby certify that I have reviewed the information listed -above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct. ,
Chuck Clemmons
Facility Owner/Manager (print)
Phone:
'Gh'UCkCfM M0nv Date: 9/26/2018-
Facility Owner/Manager (signature)
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Lagoon#1 line m = 749.7 lb PAN
2. Structure ID: Temp Storage line'm = 1753.2 Ib PAN
3. Structure ID: Permanent Storage line m = 1424.0 lb PAN
4. Structure ID:
5. Structure ID:
6. Structure ID:
line m = Ib PAN
line m = lb PAN
line m = lb PAN
n.lines 1+2+3+4+5+6= 3926.8lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
4586
1
Hybrid Bermuda
18.96
120.20
2279.0
3/1-9/30
4586
2
Hybrid Bermuda
19.48
157.20
3062.3
3/1-9/30
4586
3
Hybrid Bermuda
9.49
166.80
1582.9
3/1-9/30
4586
4
Hybrid Bermuda
7.58
184.50
1398.5
3/1-9/30
4586
6
Hybrid Bermuda
17.46
107.00
1868.2
3/1-9/30
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 10190.9 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line In from section II) = 3926.8 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 10190.9 lb. PAN
y. Overall PAN balance (w - x) _ -6264 lb. PAN
PoA (30 Day) 2/21 /00
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Ilrrigation onto existing spray.fields will continue as weather and field conditions permit. This POA was completed by Sam
Edwards Environmental Specalist with NCDA/Soil and Water on 9/26/18. This is a result of rainfall from Hurricane
Florence. 5 day poa's were waved by DEQ during this time. Mr. Clemmons will pump as field conditions allow. Mr.
Clemmons self reported on 09/21/18. Brunswick County recieved over 30+ inches of rain during this storm event and Mr.
Clemmons substained damage to his hog houses which allowed more fresh water to enter his lagoon through the houses.
This storm exceeded the normal 25year 24hour rain event.
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): La oon #1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr.124 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
15.0 inches
19.5 inches
4.5 inches
161976 ftz
454343 gallons
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 210994 ft3
1 h. current herd # 00 certified herd #1 6400
actual waste produced = current herd # x line g = ft3
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 6/11/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
0 ft3
62040 ft3
77343 gallons
1.41 Ibs/1000 gal.
749.7 Ibs. PAN
PoA (30 Day) 2/21/00
0
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): ITemp Storage
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 10.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 28.0 inches
c. line b - line a (inches in red zone) = 18.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 103829 ftz,
e, line c/12 x line d x 7.48 gallons/ft3 1164961 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 210994 ft3
h. current herd # 00 certified herd # 6400
actual waste produced = current herd # x line g = W
certified herd #
i. volume of wash water according to structural design ft3
j. excess rainfall over evaporation according to design 62900 ft3
k. (lines h + i + j) x 7.48 x 30 ,days/line f= 78415 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 6/1-11,,2018 1.41 Ibs/1000 gal.
m. ((lines e + k)/1000) x line 1 = 1753.2 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21 /00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Permanent Storage
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 4.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 17.51 inches
c. line b - line a (inches in red zone) = 13.5 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 110696 1 ft2
e. line c/12 x line d x 7.48 gallons/ft3 931507 gallons
3. Projected volume of waste liquid produced during draw'down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 210994 ft3
h. current herd # certified herd #1 6400
actual waste produced = current herd # x line g = ft3
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be, land applied during draw down period
I. current waste analysis dated 6/18/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
O ft3
62900 ft3
78415 gallons
1.41 Ibs/1000 gal.
1424.0 Ibs. PAN
PoA (30 Day) 2/21 /00
ADDENDUM FOR 2015 (BERMUDAGRASS CROP CYCLE)
Note from NCDENR, issued October 8, 2015:
After consultation with an agronomist, the Division is allowing an extension of the Bermuda application window until October 20. Please note the following conditions related to the extension:
1. This extension applies only to Bermuda crops with an application window that expired on September 30, 2015.
2. The owner of the animal operation must have the Waste Utilization Plan (WUP) amended by a Technical Specialist to reflect the extended application window. The owner must keep
this temporary amendment with the WUP for review during the farm's annual inspection.
3. The application of waste during this extended period shall not exceed the specified PAN rates for each field.
4. The extended application window must end no later than October 20, 201'5 and is valid for this year only.
*Memo from NCDENR is attached'
Amanda Hatcher, NCCES-Duplin County Center, 910-296-2143