HomeMy WebLinkAbout310773_Plan of Action_20180927PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT -ANIMAL FACILITIES
Facility Number: 31-773 County: Duplin
Facility Name: Juniper Ridge Farm
Certified Operator Name:
Daniel Wells III
Operator Number:
3/ - 773
AWA 993653
1. Current liquid level(s) in inches as measured from the current liquid level in'the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
1
N
8
2. Check all applicable items
X Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is, within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and,hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates for depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
9/20/18
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Daniel Wells III Phone:
//�� Facility Owner/Manager (print)
Oury\" �lti �1Y GL� t' Date:
Facility Owner/Manager (signature)
ok i)a K+ o W.,eA s I l
9/24/ 18-
11
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Lagoon #1
line m =
881.2 lb PAN
2. Structure ID:
line m =
lb PAN
3. Structure ID:
line m =
lb PAN
4. Structure ID:
line m =
lb PAN
5. Structure ID:
line m =
lb PAN
6. Structure ID:
line m =
lb PAN
n. lines 1 +2+3+4+5+6= 881.2 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PFRI(In nn Nr)T I IST FIFI nS Tr1 WHICH PAN r'ANNCIT RF APPI IFn ni IRINr. THIS 3n nAY PFRinn
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR-2
PAN balance
(lb/acre)
t TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window'
9A
bermuda rass
1 31
180.00
235.8
Mar -Sept
I
10
bermuda rass
0.81
200.00
162.0
Mar -Sept
11
bermuda rass
0.46
200.00
92.0
Mar -Sept
12
bermuda rass
0.93
200.00
186.0
Mar -Sept
9A
sm gr
1.31
50.00
65.5
Sept -Mar
10
sm gr
0.81
50.00
40.5
Sept -Mar
11
sm gr
0.46
50.00
23.0
Sept -Mar
12
sm gr
0.931
50.00
46.5
Sept -Mar
16A
sm gr
1.38
50.00
69.0
Sept -Mar
F
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 920.3 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 881.2 lb. PAN
x. Crop's remaining PAN balance (line v from section Ill) = 920.3 lb. PAN
y. Overall PAN balance (w - x) = -39 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul,
depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new
information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance
PoA (30 Day) 2/21/00
table and recalculate the overall PAN balance. It animal waste is to be hauled to another permitted tacility, provide
information regarding the herd population and lagoon freeboard levels at the receiving facility.
Irrigation onto existing 'spray fields will continue as weather and field conditions permit.
Mr. Wells reported 8" to the inspector on 9/17/18. Prior to Hurricane Florence, the freeboard level was at 40". The farm
recorded approximately 32" rain from this tropical system. Irrigation commenced 9/20/18 and Mr. Wells notified the
inspector on 9/24/18 that the lagoon level.was 16".
PoA (30 Day) 2/21/00
,N
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Lagoon #1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
8.0 inches
19.01 inches
11.0 inches
76633 fig
525447 gallons
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 94948 ft3
h. current herd # 3011 certified herd #1 2880
actual waste produced = current herd # x line g = 99267 ft3
certified herd #
i. volume of wash water according to structural design 0 ft3
l
j. excess rainfall over evaporation according to design 44702 ft3
k. (lines h + i + j) x 7.48 x 30 days/line f= 179481 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/17/18 1.25 Ibs/1000 gal.
m. ((lines e + k)/1000) x line I = 881.2 Ibs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00