Loading...
HomeMy WebLinkAbout310773_Plan of Action_20180927PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT -ANIMAL FACILITIES Facility Number: 31-773 County: Duplin Facility Name: Juniper Ridge Farm Certified Operator Name: Daniel Wells III Operator Number: 3/ - 773 AWA 993653 1. Current liquid level(s) in inches as measured from the current liquid level in'the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 N 8 2. Check all applicable items X Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is, within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and,hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates for depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 9/20/18 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Daniel Wells III Phone: //�� Facility Owner/Manager (print) Oury\" �lti �1Y GL� t' Date: Facility Owner/Manager (signature) ok i)a K+ o W.,eA s I l 9/24/ 18- 11 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon #1 line m = 881.2 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6= 881.2 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PFRI(In nn Nr)T I IST FIFI nS Tr1 WHICH PAN r'ANNCIT RF APPI IFn ni IRINr. THIS 3n nAY PFRinn o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (lb/acre) t TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 9A bermuda rass 1 31 180.00 235.8 Mar -Sept I 10 bermuda rass 0.81 200.00 162.0 Mar -Sept 11 bermuda rass 0.46 200.00 92.0 Mar -Sept 12 bermuda rass 0.93 200.00 186.0 Mar -Sept 9A sm gr 1.31 50.00 65.5 Sept -Mar 10 sm gr 0.81 50.00 40.5 Sept -Mar 11 sm gr 0.46 50.00 23.0 Sept -Mar 12 sm gr 0.931 50.00 46.5 Sept -Mar 16A sm gr 1.38 50.00 69.0 Sept -Mar F 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 920.3 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 881.2 lb. PAN x. Crop's remaining PAN balance (line v from section Ill) = 920.3 lb. PAN y. Overall PAN balance (w - x) = -39 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance PoA (30 Day) 2/21/00 table and recalculate the overall PAN balance. It animal waste is to be hauled to another permitted tacility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing 'spray fields will continue as weather and field conditions permit. Mr. Wells reported 8" to the inspector on 9/17/18. Prior to Hurricane Florence, the freeboard level was at 40". The farm recorded approximately 32" rain from this tropical system. Irrigation commenced 9/20/18 and Mr. Wells notified the inspector on 9/24/18 that the lagoon level.was 16". PoA (30 Day) 2/21/00 ,N PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Lagoon #1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 8.0 inches 19.01 inches 11.0 inches 76633 fig 525447 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 94948 ft3 h. current herd # 3011 certified herd #1 2880 actual waste produced = current herd # x line g = 99267 ft3 certified herd # i. volume of wash water according to structural design 0 ft3 l j. excess rainfall over evaporation according to design 44702 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 179481 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/17/18 1.25 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 881.2 Ibs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00