PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 10-36
Facility Name: Funston
Certified Operator Name: Marc Green
County: Brunswick
Operator Number: AWA 988054
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID.,
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon '5
Finisher Sow
26 13
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: as conditions permit
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
A Jeff Earp Phone: 910-876-5686
Facility Owner/Manager (p IFor -S b te: 9/24/2018
Facility Owner/ nag r (sig Ux
. t �
11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: Lagoon 1 Finisher
line m =
lb PAN
2.
Structure ID: Lagoon 2 Sow
line m =
1743.2 lb PAN
3.
Structure ID*
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n.lines 1+2+3+4+5+6= 1743.2lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS Tn WHICH PAN CONNnT RP eaPI rRn ni 101W11 Tine'2n nnv DCOInn
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
2982
10
Bermuda
27.07
222.00
6009.5
March -Sept
OWU-- 6,u1I C1 « u[Up enumy appucaaon oate or next crop appuoation beginning date for available
receiving crops during 30 day draw down period.
v: Total PAN available for all fields (sum of column t) = 6009.5 Ib. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 1743.2 lb. PAN
PoA (30 Day) 2/21 /00
x. Crop's remaining PAN balance (line v from section III) = 6009.5 lb. PAN
y. Overall PAN balance (w - x) _ -4266 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of adtion here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on rnew information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Irrigation onto existing spray fields will continue as weather and field conditions permit Additional land is
available for pumping if needed.
PoA (30 Day) 2/21/00
�C
PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): La oon 1 Finisher
2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard
a. current liquid level according to marker 26.0 inches
b. designed 25 yr,/24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) _ -7 inches
d, top of dike surface area according to design
(area at below structural freeboard elevation) 83538 ftz
e. line c/12 x line d x 7.48 gallons/W-364504 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 94644.4 ft3
h. current herd # 1710 certified herd # 1710
actual waste produced = current herd # x line g = 9464.4 ft3
certified herd #
i, volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i +j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated
.m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
ft3
73791.9 ft3
209984 gallons
Q Ibs/1000 gal.
0 Ibs. PAN
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD 1
I. TOTAL PAN TO BE -LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Lagoon 2 Sow
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e, line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
F71-301 inches
20.0 inches
7.0 inches
169437 ftz
739310 gallons
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 294486 ft3
h. current herd # 3100 certified herd # 2900
actual waste produced = current herd # x line g = 314795 ft3
certified herd #
i. volume of wash water according to structural design
j, excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/12/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
-� ft3
12031�31ft3
542435 gallons-
1.36 Ibs/1000 gal.
1743.2 Ibs. PAN