PLAN OF' ACTIQN(PQ-a)FOR Hl3i-FREEB AR .A1 ANIMAL FACILITIES;
-Facillty*niber. 4143 �-�3 U�t'y: biipfin.
Facility Name: -Jetrry Kennedy'Far<ti..
�0,IerjUfi6d"O'perat'qr Natxte, Jerry Kenneify, Opprator'Nurri4qr; AWA17235
levels) in ih'dhb§ asrneals&ed from the.current, liquid level in, the� lagoon,tojhe
16w6 st;poiht -on the top-p"C'.1he dam for lag9qnq-vAhouf spillways; and from the-cu 't, (iq
o t he -
In the lagoon to' oft 90 ilWa l I lagoons _y_1 t with - , t , oil _ Iwa t*, - -qr� [
L6g'666: 1 Lagoon 2 Lagoon 8' Lagoon 4. Lagoon 6,
'Lagoon Name/lb:
LeVet(ihches),. 7
'I Chec_k qlI*'.appIibable'Items
LiqUid IeV61 Is,*ithib th6,de§igfi"ed'itfuctural'fredboard elevation&6f orve or,more structures.
Five, and 90'day Plans. of-Acti are cj�qq, qp - e attached, Hydraulic aO,agronoRic.-6ila�Rp
'wi�,in,acqqp�tabLe ranges:,g_q,are
k UklUid 16V.61 is -Within th6'25>Year 24.-hour--storm elevations for one or more structures: A
�O day pjcifAdonis attached._Agr6nomicbalance iswiifiiri kceqtableraiigei
-Waste j§ to be; pumped and IiEiAd to -off sif6 f6catio-n§-. 5blume and-RANGontent of-wasitiff,
t6bb-pumocf;kfid habled-J,sreflected in section 111tables fhcludedlwifhfr) this; plan is -a f list
9ftfie--prppq§ ies with -related fadi lit--- qryi�ers,n
edTsi �yq tffn,6e-rOf-a&ijsan-d--
recejv!n,g d-rO
informat Q-,6,nt6ctdnd§6bu appto&6Jlfr_dm,th, ;D-WQo'eioetbt�ah§fb'�,-ofWA" tbd,site,
- 1 0 waste
:hotc&Vdr6d.`ih,_.th6 facility's CAWMP.
Operation' ffbeLpgrfiall �orf llydepppulat6d.,
'%ttadh,a'coO Pldtci.,tchedUle,,W[th-,dd-rtetobhdihg Ahitnbl units -and .dates -fro -depopulation
`*if4hirTia-_ls--are,.to,be movedIb-another permitted facili'tyi.Rrpvidefacility ,number, lagoon
is p9q herd,popqla9i" - jor-tho, (9pplVing, facl) fi�#E,Owqtleye - n � 4
3. EJflidst:,pds§ible date --to begin land 60plication of'Wa6te., as cooditions-perm
it_
I herebycertifythat I haye"reviewe*t6vinformatibnAlsied abbv fl1 nclud 6d Within the,
the.7W_AoVm"y-_ k-n'- oW.11640 -e---and'eib.ility-,,the,infdrrriation 1&
accurate and co��e-ct.
A60Y-XeFnn0dy, --Phone:, 91,0-290.L305Z
cility Owner/Manager (print)
Date,, 972.,1/201'8
^Fcidility:oWher/Man-Eig!a((siNatued)-
II. TOTAL POUNDS OF PAN STORED WITHIN -STRUCTURAL FREEBOARD AND/OR 25 YR.124
HR. STORM STORAGE ELEVATIONS IN ALL WASTE
STRUCTURES FOR FACILITY
1.
Structure ID: Lagoon 1
line m = 564.2 lb PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
in. lines l+2+3+4+5+6= 564.2lbPAN
Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT RF APPI IFn ntiRINr, THIS sn nAV PFRInn
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
L TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u, application window'
70812
1A
Bermuda Hay
4.77
131.12
625.4
March -Sept
70812
2B
Fescue
0.94
59.39
55.8
Aug -July
70812
3D
Bermuda Hay
3.21
140.67
451.6
March -Sept
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
I-
v. Total PAN available for all fields (sum of column t) = 1132.8 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 564.2 lb. PAN
PoA (30 Day) 2/21100
x. Crop's remaining PAN balance (line v from section III) = 1132.8 lb. PAN
y. Overall PAN balance (w - x) _ -569 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information_ If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is
available for pumping if needed.
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE'STRUCTURE
1. Structure Name/identifier (ID): La oon 1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 7.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 12.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 71002 Jft2
e. line c/12 x line d x 7.48 gallons/ft3 531095 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 69101 ft3
h. current herd # 1600 certified herd # 2096
actual waste produced = current herd # x line g = 52749 ft'
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation,according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 7/13/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2121 /00
0 ft3
41418 ft3
117395 gallons
0.87 Ibs/1000 gal.
564.2 lbs. PAN