Loading...
HomeMy WebLinkAbout310413_Plan of Action_20180924C� z-q- -n60 2-05-3 3 l -�r3 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 9/16/2018 1. Structure Name/Identifier (ID): Richard/William Lanier#1 FN: 31-413 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker 16.0 inches b. designed 25 yr./24 hr. storm& structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 3.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 43920 ft2 e. line c/12 x line d x 7.48 gallons/W 95819 gallons 3. Projected volume of waste liquid produced during draw down period 99 f. temporary storage period; 132 180 days g. volume of waste produced according to structural design 61320 ft3 h. current herd # 1860 certified herd #1 1860 actual waste produced = current herd # x line g = 61320 ft'i certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 5/24/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 Oft, 26616 ft3 109627 gallons 1.43 Ibs/1000 gal. 293.8 Ibs. PAN 9/24/2018 ' r PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 9/16/2018 1. Structure Name/Identifier (ID): Richard/William Lanier#2 FN: 31-413 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 7.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 12.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 42636 ft2 e. line c/12 x line d x 7.48 gallons/ft3 332206 gallons 3. Projected volume of waste liquid produced during draw down period 99 f. temporary storage period 132 180 days g. volume of waste produced according to structural design 47589 ft3 h. current herd # 1440 certified herd #1 1440 actual waste produced = current herd # x line g = 47589 ft3 certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 26337.5 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 92162 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 5/24/2018 1.37 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = - 581.4 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 9/24/2018 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Richard/William Lanier#1 line m = 293.8 lb PAN 2. Structure ID: Richard/William Lanier#2 line m = 581.4 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6= 875.2 lb PAN i III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. - . . .. •u. appliGation window' sea 0 - . . JlalC GUI ICI II Ul Uy Cl 1U11 ly ayy11LaLIUII UaIC UI IICJU GI Uy ayy11LaLIUII UCyll 11111 ly UGLC IUI aVaIIGUIC receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 4920.0 lb.. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 875.2 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 4920.0 lb. PAN y. Overall PAN balance (w - x) _ -4045 lb. PAN PoA (30 Day) 2/21 /00 9/24/2018 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Pumping will occur to bermuda as conditions permit PoA (30 Day) 2/21/00 9/24/2018