Loading...
HomeMy WebLinkAbout310837_Plan of Action_20180925-zs- i6 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 9/16/2018 1. Structure Name/Identifier (ID): Rogger Barwick 31-837 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 10.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 1.0, inches d. top of dike surface area according to design (area at below structural freeboard elevation) 59906 ftz e. line c/12 x line d x 7.48 gallons/ft,3 37341 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 81760 ft3 h. current herd # 2480 certified herd #1 2480 actual waste produced = current herd # x line g 81760 ft' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/30/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 ft3 36543 ft3 147484 gallons _ - 1.38 Ibs/1000 gal. 255.1 Ibs. PAN PoA (30 Day) 2/21 /00 9/25/2018 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Rogger Barwick (31-837) line m = 255.1 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines1+2+3+4+5+6= 255.1lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD_ DO NOT LIST FIELDS TO WHICH PAN CANNOT RE APPLIED DURING THIS an DAY PERIOD_ o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 71308 1 a Small Grain 3.11 50.00 155.5 Oct - Mar 713081 lb Small Grain 2.49 50.00 124.5 Oct - Mar 71308 2a Small Grain 2.54 50.00 127.0 Oct - Mar 71308 2b Small Grain 1.78 50.00 89.0 Oct - Mar 71308 3a Small Grain 3.44 50.00 172.0 Oct - Mar 71308 3b Small Grain 1.07 50.00 53.5 Oct - Mar 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 721.5 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 255.1 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 721.5 lb. PAN y. Overall PAN balance (w - x) _ -466 lb. PAN PoA (30 Day) 2/21/00 9/25/2018 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NAKKA I I V t: Pumping will occur to hay as conditions permit to get lagoon under the structural freeboard. Back to 18" 9/25/18 PoA (30 Day) 2/21/00 9/25/2018