HomeMy WebLinkAbout310165_Plan of Action_20180927.2-7-�
261 �23 �7
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number. 31-166
Facility Name:
RL Pickett Farm
Certified Operator Name:
Robert Gene Ward
County: Duplin
Operator Number:
18780
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID,:
Spillway(Y or N):
Level(inches):
Lagoon1. Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
RLP
N
0
2. Check all applicable items
X Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
"Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility 11
3. Earliest possible date to begin land application of waste: As field conditions permit
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Greer Moore for:
RL Pickett
Facility Owner/Manager (print)
Phone
RL Pickket / Greg Cave Date:
Facility Owner/Manager (signature)
910-289-0282
9/27/2018
FA
r
r
II. TOTAL POUNDS OF PAN -STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: RL Pickett Farm
line m = 1604.0 lb PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID:
Jine m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:,
line m =.
lb PAN
n. lines +2+3+4+5+6= 1604.0 lb PAN
III. TOTAL PAN' BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2, PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window
4800
1
BH
4.91
42.50
208.7
3/01-9/30
48001
2
BH
4.81
112.45
540.9
3/01-9/30
4800
3
BH
4.21
62.15
261.7
3/01-9/30
4800
4
BH
4.51
53.75
242.4
3/01-9/30
4800
5
BH
2.62
235.00
615.7
3/01-9/30
4800
6
BH
2.55
235.00
599.3
3/01-9/30
4800
7
BH
2.87
235.00
674.5
3/01-9/30
4800
8
BH
4.71
66.80
314.6
3/01-9/30
4800
1
SGO
4.91
50.00
245.5
9/01-4/30
4800
2
SGO
4.81
50.00
240.5
9/01-4/30
4800
3
SGO
4.21
50.00
210.5
9/01-4/30
4800
4
SGO
4.51
50.00
225.5
9/01-4/30
4800
5
SGO
2.62
50.00
131.0
9/01-4/30
4800
6
SGO
2.55
50.00
127.5
9/01-4/30
4800
- 7
SGO
2.87
50.00
143.5
9/01-4/30 -
4800
8
SGO
4.71
50.00
235.5
9/01 4/30
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 5017.2 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 1604.0 lb. PAN
PoA (30 Day) 2/21/00
x. Crop's remaining PAN balance (line v from section III) = 5017.2 lb. PAN
y. Overall PAN balance (w - x) _ -3413 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon, freeboard levels at the
receiving facility.
Lagoon was inundated by storm/flood waters due to Hurricane Florence. Hurricane Florence dropped approx
19" - 21" or rainfall on this farm, and forced flood waters from the NE Cape Fear River to inundate the lagoon.
Smithfield Food representatives visited this site on 9/24, to re -shoot lagoon dike and set a new marker. Once
new marker was set on 9/24/18, the lagoon level was at 14". Hog houses were not flooded, also please note the
flush tanks were shut off a day prior to storm and throughout the storm period. A "press release" will be issued
due to lagoon being inundated by flood waters. DWR-WiRO was notified on 9/16 of the lagoon inundation by
flood waters; owner/farm manager could only access the farm by boat due to flood waters.
PoA (30 Day) 2/21/00
a
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): RL Pickett Farm
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm' & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48.gallons/ft3
3. Projected volume of waste liquid produced during draw down period
0 inches
19.0 inches
19.0 inches
85,4001 ft2
1011421 gallons
f. temporary storage period according to structural design 1801 days
g. volume of waste produced according to structural design 121058 ft3
h. current herd # 3672 certified herd #1 3672
actual waste produced = current herd # x line g = 121058 ft'
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 8/27/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
0 ft3
49816 ft3
213023 gallons
1.31 Ibs/1000 gal.
1604.0 Ibs: PAN
PoA (30 Day) 2/21 /00