Loading...
HomeMy WebLinkAbout310868_Plan of Action_20180927�2019'6a473 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-868 County: Duplin Facility Name: JC Campbell Certified Operator Name: Peggy Campbell Operator Number: 31 U96? AWA 18026 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 N 17 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates for depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application -of waste: 9/26/18 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Peggy Campbell Phone: Facility Owner/Manager (print) Date: 9/27/18 Facility Owner/Manager (signature) .T.,E� j Ca-V�61e_,-Q J PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): ILagoonl 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) =. d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/f? , 3. Projected volume. of waste liquid produced during draw down period 17.01 inches 19.0 inches 2.0 inches 59436 fig 74097 gallons r f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 52748.7 1 ft3 h. current herd # E certified herd #1 1600 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 8/29/18 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) ff I1 ft3 36400 1 f? 45379 gallons 1.08 Ibs/1000 gal. 129.0 lbs. PAN PoA (30 Day) 2/21/00 'l' II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon 1 line m = 129.0 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 129.0lbPAN III, TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DUMNU I HIs su LIAT rt:KIVU. o. tract # p. field # q. crop r. acres s. remaining IRR-2 t. TOTAL PAN u. application window' PAN balance IBALANCE FOR (lb/acre) FIELD (Ibs.) column r x s 1A bermuda 1.46 194.021 283.3 Mar -Oct 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields sum of column t) = 283.3 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 129.0 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 283.3 lb. PAN y. Overall PAN balance (w - x) = _154 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance PoA (30 Day) 2/21/00 table and recalculate the overall PAN balance. It animal waste is to be hauled to another permitted tactlity, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Prior to Hurricane Florence, the lagoon was in compliance at 41" freeboard. Mrs. Campbell recorded 22 inches of rain from this tropical system. After the storm, the freeboard level was 19" which is a compliant level. However, immediately after the 19" recording, on 9/24/18, the farm received additional rainfall moving the lagoon into the 25-year, 24-hour storm level. Notification of 17" freeboard was made on 9/25/18. Mrs. Campbell plans to irrigate 9126/18 to work toward the lagoon level getting closer to 19" with plans to get to greater than 19" freeboard by the week's end. Mrs. Campbell has gotten to 19.25" on 9/27/18. Mrs. Campbell will keep inspector up to date on level. This information is based on condition: as of 9/27/18. PoA (30 Day) 2/21/00