Loading...
HomeMy WebLinkAbout310322_Plan of Action_20180921(�-01 �oZ G L�3 q-ZI-I 31�3zZ PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 9/16/2018 .1. Structure Name/Identifier (ID): Ricky Korne a Bard-1 31-322 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw,down period 19.0 inches 19.5 inches 0.5 inches 61250 ft2 19090 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 81760 ft3 h. current herd # 2480 certified herd # 2480 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/30/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 81760 ft3 0 ft3 36543 ft3 147484 gallons 1.18 Ibs/1000 gal. 196.6 Ibs. PAN PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1 9/16/2018 1. Structure Name/Identifier (ID): I Ricky Korne a Bard-2 31-322 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to.marker v 19.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 0.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 101336 ft2 e. line c/12 x line d x 7.48 gallons/ft3 31583 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 121451 ft3 h. current herd # 3675 certified herd # 3675 actual waste produced = current herd # x line g = 121451 ft' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/30/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 9 PoA (30 Day) 2/21/00 0 ft3 61454 ft3 228022 gallons 1.01 Ibs/1000 gal. 262.2 Ibs. PAN I`• II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Ricky Kornegay (Byard-1)-31-322 line m = 196.6 lb PAN 2. Structure ID: Ricky Kornegay (Byard-2) 31-322 line m = 262.2 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 458.8lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop- r. acres s. remaining IRR 2 PAN balance (lb/acre) t TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window 1317 10 Small Grain 2.42 30.00 72.6 3/1 - 9/30 1317 10a Small Grain 0.86 30.00 25.8 3/1 - 9/30 1317 11 Small Grain 4.56 35.00 159.6 3/1 - 9/30 1317 12 Small Grain 5.29 35.00 185.2 3/1 - 9/30 1317 13 Small Grain 4.14 35.00 144.9 3/1 - 9/30 1317 14 Small Grain 3.44 35.00 120.4 3/1 - 9/30 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 708.5 lb. PAN IV. FACILITY'S PDA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 458.8 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 708.5 lb. PAN y. Overall PAN balance (w - x) = -250 lb. PAN PoA (30 Day) 2/21/00 tij - -4. Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Waste will be applied agronomically and hydraulically as weather permits. PoA (30 Day) 2/21/00