HomeMy WebLinkAbout310770_Plan of Action_20180921b�.6Y-7
l -Z I -I g-
3I-776
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 9/16/2018
1. Structure Name/Identifier (ID): Kitty Knoecker Farm 31-770
w
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x'line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
19.0 inches
19.5 inches
0.5 inches
138996 ftZ
43320 gallons
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 189895.2 ft3
h. current herd # 5760 certified herd #1 5760
actual waste produced = current herd # x line g = 189895 ft3
certified herd #
i. volume of wash water according to structural design Oft3
j. excess rainfall over evaporation according to design 84000 ft3
k. (lines h + i + j)-x 7.48 x 30 days/line f= 341456 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/6/20'18 _ 1.76 Ibs/1000 gal.
m. ((lines e + k)/1000) x line I = 677.2 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) Harold Smith Kitty (31-770) PoA30day (9-16-18) 9/20/2018
II. TOTAL
POUNDS OF PAN STORED WITHIN STRUCTURAL
FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: Kitty Knoecker Farm (31-770)
line m = 677.2 lb PAN
2.
Structure ID:
line m =
- lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n. lines 1-+2+3+4+5+6= 677.2 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY,DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD_
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window
6123
CP Sec 3
Small Grain
9.94
50.00
496.8
9/1-3/31
6123
CP Sec 4
Small Grain
9.94
50.00
496.8
9/1-3/31
'State current crop ending application date -or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 993.5 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied -(line n from section II) = 677.2 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 993.5 lb. PAN
y. Overall PAN balance (w - x) _ -316 lb. PAN
PoA (30 Day) Harold Smith Kitty (31-770) PoA30day (9-16-18) 9/20/2018
r
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permittedfacility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Waste will be applied agronomically and hydraulically as weather permits.
PoA (30 Day) Harold Smith Kitty (31-770) PoA30day (9-16-18) 9/20/2018