Loading...
HomeMy WebLinkAbout310557_Plan of Action_20180928C-z6 ,10 31- ss7 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-557 Facility Name: CDP Farm County: Duplin Certified Operator Name: Chad Phillips Operator Number: 996569 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y.or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 10 10 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped.and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. , *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit 1 hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Chad Phillips Phone: Facility Owner/Manager (print) / Date: Facility Owner/Manager (signature) 910-293-3434 9/18/2018 b II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon 1 line m = 422.3 lb PAN 2. Structure ID: Lagoon 2 line m = 192.5 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: 6. Structure ID: line m = line m = lb PAN ib PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 614.8lbPAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIFLDS TO WHICH PAN CANNOT RF APPI IFD DI1RINr; THIC 3n nAY PF:Pin 1 o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 1418 1 Wheat 4.57 106.15 485.1 Sept -April 14181 2 Wheat 4.07 106.15 432.0 Sept -April State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 917.1 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 614.8 lb. PAN PoA (30 Day) 2/21/00 40 IN x. Crop's remaining PAN balance (line v from section III) = 917.1 Ib. PAN y. Overall PAN balance (w - x) _ -302 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. PoA (30 Day) 2/21/00 e L, PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Lagoon 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr.124 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period. 1 0.0_1 inches 20.4 inches 10.4 inches 46412 ftz 300874 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 63694 ft3 h. current herd # 2268 certified herd # 2268 actual waste produced = current herd # x line g = 63694 ft' certified herd # i. volume of wash water according to structural design ®ft3 j. excess rainfall over evaporation according to design 27074 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 113157 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 8/21/2018 1.02 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 422.3 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 5 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): La oon 2 J 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 10.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 20.0 inches c. line b - line a (inches in red zone) = 10.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 51255 ft2 e, line c/12 x line d x 7.48 gallons/W 320767 gallons 3. Projected volume of waste liquid produced during draw down period t. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 63722 ft3 h. current herd # 1 2269 certified herd # 2269 actual waste produced = current herd # x line g = 63722 ft' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7,48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 8/21/2018 m. ((lines e + 01000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 ft3 29899 ft3 116714' gallons 0.44 Ibs/1000 gal. 192.5 Ibs. PAN