PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 31
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 9/16/2018
1. Structure Name/Identifier (ID): Rouse Ivey - Hill Farm 31-814
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 11. 01 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches
c. line b - line a (inches in red zone) = 8.5 inches
d. top of dike surface area according to design
78776 Jft2
e. line c/12 x line d x 7.48 gallons/ft3 417382 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 116047 ft3
h. current herd # 3520 certified herd # 3520
actual waste produced = current herd # x line g = 116047 ft3
certified herd #
i. volume of wash water according to structural design Oft,
j. excess rainfall over evaporation according to design 47979 ft3
k. (lines h + i + j) x 7.48 x 30 days/line f= 204486 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/9/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
1.85 Ibs/1000 gal.
1150.5 Ibs. PAN
Structure 1 Rouse Ivey - Hill Farm (PoA30day) 9-16-2018
Page 1 of 1
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Rouse Ivey - Hill Farm (31-814) line m = 1150.5 lb PAN
2. Structure ID: line m = lb PAN
3. Structure ID: line m = lb PAN
4. Structure ID: - line m = lb PAN
5. Structure ID: line m = lb PAN
6. Structure ID: line m =
n. = 1 +2 +3+4+5+6 1150.5
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD_,
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window
3650
4
Bermuda Pasture
2.56
235.00
601.6
3/1 - 9/30
3650
5
Bermuda Pasture
3.48
235.00
817.8
3/1 - 9/30
3650
6
Bermuda Pasture
4.54
235.00
1066.9
3/1 - 9/30
3650
7
Bermuda Pasture
3.73
141.00
525.9
3/1 - 9/30
3650
8
Bermuda Pasture
3.38
65.00
219.7
3/1 - 9/30
3650
9
Bermuda Pasture
3.35
129.00
432.2
3/1 - 9/30
3650
10
Bermuda Pasture
5.44
122.00
663.7
3/1 - 9/30
3650
11
Bermuda Pasture
4.25
122.00
518.5
3/1 - 9/30
3650
17B
Bermuda Pasture
1.61
98.00
157.3
3/1 - 9/30
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 5003.6 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 1150.5 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 5003.6 lb. PAN
y. Overall PAN balance (w - x) _ -3853 lb. PAN
SUMMARY Rouse Ivey - Hill Farm (PoA30day) 9-16-2018 Page 1 of 2
f. , 47'.
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
IYAMMA I IV C:
Farm was back at 13" on 9/21/18.
Farm is out of red today at 22.5"
SUMMARY Rouse Ivey - Hill Farm (PoA30day) 9-16-2018 Page 2 of 2