Loading...
HomeMy WebLinkAbout310863_Plan of Action_20181009a0l;�016tf2 PLAN OF ACTION (P®A) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31 - 863 Facility Name: B & M Farm #1 Farm Certified Operator Name: 1> L to County: Duplin Operator # aQa.4,�_ Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 La T Tw6n, I Mv a AW eA lg'g I M, iif, ier W 1 _ Spillway (Yes or No): 2.-Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Resources prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. RECEIVED14COEMR/0WR OCT L, V3l1,l�g PoA Cover Page 2/21100 Water„"Is',4 Regional Dptirnt;b;,. tSrjCtion `wilmlil9tol< Rd8j 3hal office