PLAN OF ACTION
Poa FOR
HIGH FREEBOARD
AT ANIMAL
FACILITIES
Facility Number.
31-0231
County:
DUPLIN
Facility Name:
MAP FARM,
LLC
Certified O erator Namj
MARSHALL H PHILLIPS
Operator Number.
28714
1. Current liquid levels in inches as measured from the current li uid level in the la oon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons
with spillways.
La oon 1
Lagoon 2
Lagoon 3
Lagoon 4
Lagoon 5
Lagoon Name/ID:
MAN
S illway ff or N):
N
Level inches :
8
2. Check all
applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. H draulic and agronomic balances are
within acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ P'or to transfer of waste to a site
not covered in the facili 's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: Conditions
permit
1 hereby certiN that 1 have reviewed the Information listed above and included within the
attached Plan of Action and to the best of mY knowledge
and abili
the information is
accurate and correct.
Phone:
Facility Owner/Manager (print)
I
z�s
3�5
PLAN OF ACTION PoA FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1.
Structure Name/Identifier (ID):
MAP1
2.
Current liquid volume in 25 r./24 hr. storm storage & structural freeboard
a.
current liquid level according to marker
8.0
b.
designed 25 yr./24 hr. storm & structural freeboard
25.5
c.
line b - line a (inches in red zone) =
17.5
d.
top of dike surface area according to design
area at below structural freeboard elevation
65416
e.
line c/12 x line d x 7.48 gallons/ft3
713580
3.
Projected volume of waste liquid produced during draw down period
f.
tem ora storage period according to structural design
180
volume of waste produced according to structural design
98903
h.
current herd #
2800
certified herd #
2940
actual waste
produced = current herd # x line g =
94193
certified herd #
i.
volume of wash water according to structural design
0
excess rainfall over evaporation according to design
40920
k.
lines h + i + ' x 7.48 x
1 30
1 days/line f=
168441
4.
Total PAN to be land applied during draw down eriod
I.
current waste analysis dated
8.21.18
0.96
M.
I fflines e + k /1000 x line 1=
846.7
REPEAT SECTION
I FOR
EACH WASTE STRUCTURE ON
SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21 /00
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID:
MAP1
line m =
846.7
2. Structure ID:
line m =
3. Structure ID:
line m =
4. Structure ID:
line m =
5. Structure ID:
line m =
6. Structure ID:
line m =
n.lines1+2+3+4+5+6=
846.7
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS
DURING 30 DAY DRAW DOWt
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PI
o. tract #
p. field #
q. crop
r. acres
s. remaining
IRR-2 PAN
balance (lb/acre)
t TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
71532
5
COASTAL GRAZE
4.02
275.00
1105.8
71532
6
COASTAL GRAZE
2.17
225.00
488.3
71532
6 A
COASTAL GRAZE
1.94
225.00
436.5
71532
5 A
COASTAL GRAZE
2.34
225.00
526.5
'State current crop ending application date or next crop application beginning date for available
receiving cro s during 30 day draw down period.
Iv. Total PAN available for all fields (sum of column t)
=
2557.0
IV. FACILITY'S PoA OVERALL PAN BALANCE
__+
AMA, - s 9P f
PoA (30 Day) 2/21 /00
s-/s
{ w. Total PAN to be land applied (line n from section II) = 846.7
x. Crop's remaining PAN balance (line v from section III) = 2557.0
v. Overall PAN balance (w - A = 1 -1710
Line y must show as a deficit. If line y does not show as a deficit, list course 'of action here including pump and haul,
depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new
information. If new fields -are to be included as an -option for lowering lagoon level, add these fields to the PAN balance
table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide
information regarding the herd population and lagoon freeboard levels at the receiving facility.
gation onto existing spray fields will continue as
mping if needed.
and field conditions permit. Additional land is available for
PoA (30 Day) 2121 /00