HomeMy WebLinkAbout310231_Plan of Action_20181004M4P I�/Vt) L-Lc--- PLAN OF ACTION Poa FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number. 31-0231 County: DUPLIN Facility Name: MAP FARM, LLC Certified O erator Namj MARSHALL H PHILLIPS Operator Number. 28714 1. Current liquid levels in inches as measured from the current li uid level in the la oon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. La oon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: MAN S illway ff or N): N Level inches : 8 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. H draulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ P'or to transfer of waste to a site not covered in the facili 's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: Conditions permit 1 hereby certiN that 1 have reviewed the Information listed above and included within the attached Plan of Action and to the best of mY knowledge and abili the information is accurate and correct. Phone: Facility Owner/Manager (print) I z�s 3�5 PLAN OF ACTION PoA FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): MAP1 2. Current liquid volume in 25 r./24 hr. storm storage & structural freeboard a. current liquid level according to marker 8.0 b. designed 25 yr./24 hr. storm & structural freeboard 25.5 c. line b - line a (inches in red zone) = 17.5 d. top of dike surface area according to design area at below structural freeboard elevation 65416 e. line c/12 x line d x 7.48 gallons/ft3 713580 3. Projected volume of waste liquid produced during draw down period f. tem ora storage period according to structural design 180 volume of waste produced according to structural design 98903 h. current herd # 2800 certified herd # 2940 actual waste produced = current herd # x line g = 94193 certified herd # i. volume of wash water according to structural design 0 excess rainfall over evaporation according to design 40920 k. lines h + i + ' x 7.48 x 1 30 1 days/line f= 168441 4. Total PAN to be land applied during draw down eriod I. current waste analysis dated 8.21.18 0.96 M. I fflines e + k /1000 x line 1= 846.7 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: MAP1 line m = 846.7 2. Structure ID: line m = 3. Structure ID: line m = 4. Structure ID: line m = 5. Structure ID: line m = 6. Structure ID: line m = n.lines1+2+3+4+5+6= 846.7 III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWt PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PI o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (lb/acre) t TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s 71532 5 COASTAL GRAZE 4.02 275.00 1105.8 71532 6 COASTAL GRAZE 2.17 225.00 488.3 71532 6 A COASTAL GRAZE 1.94 225.00 436.5 71532 5 A COASTAL GRAZE 2.34 225.00 526.5 'State current crop ending application date or next crop application beginning date for available receiving cro s during 30 day draw down period. Iv. Total PAN available for all fields (sum of column t) = 2557.0 IV. FACILITY'S PoA OVERALL PAN BALANCE __+ AMA, - s 9P f PoA (30 Day) 2/21 /00 s-/s { w. Total PAN to be land applied (line n from section II) = 846.7 x. Crop's remaining PAN balance (line v from section III) = 2557.0 v. Overall PAN balance (w - A = 1 -1710 Line y must show as a deficit. If line y does not show as a deficit, list course 'of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields -are to be included as an -option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. gation onto existing spray fields will continue as mping if needed. and field conditions permit. Additional land is available for PoA (30 Day) 2121 /00